If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-111-24395 | | Well ID: 34-111-24395 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.64171705, -80.92735226 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Monroe County, Ohio|Monroe]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[TRIAD HUNTER LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-06-09 | | Spud Date: 2013-06-09 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.64171705 |
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.92735226 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 11531.0 | ||
+ | | style="text-align:right;" | 7.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 537.0 | ||
+ | | style="text-align:right;" | 7.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 252960.0 | ||
+ | | style="text-align:right;" | 17.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 1624.0 | ||
+ | | style="text-align:right;" | 17.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-3 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 103: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -103380974 | | -103380974 | ||
| 2013-08-12 | | 2013-08-12 | ||
− | | | + | | |
| Status check inspection update on the current drilling progress found the current drilling depth to be 10,272' with a projected total depth to be drilled of 11,823'. The company is currently off bottom and circulating the borehole due to a equipment malfunction on one of the mud pumps, the pump is due to be repaired by the end of the day and drilling is to resume. | | Status check inspection update on the current drilling progress found the current drilling depth to be 10,272' with a projected total depth to be drilled of 11,823'. The company is currently off bottom and circulating the borehole due to a equipment malfunction on one of the mud pumps, the pump is due to be repaired by the end of the day and drilling is to resume. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1372777495 | | 1372777495 | ||
| 2013-07-02 | | 2013-07-02 | ||
− | | | + | | |
| Status check inspection of the drilling progress found the current drilling depth to be 352' using a 17.5'' bit and drilling on air. The next casing to be set shall be 13.375'' surface at 632'. | | Status check inspection of the drilling progress found the current drilling depth to be 352' using a 17.5'' bit and drilling on air. The next casing to be set shall be 13.375'' surface at 632'. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1372879708 | | 1372879708 | ||
| 2013-07-03 | | 2013-07-03 | ||
− | | | + | | |
| On this day I witnessed the running and setting of 634' of 13.375'' surface casing. With Halliburton cement services cementing the casing back to surface. There were 2 500 barrel fresh water mix tanks to be potentially used for this cement job with one tank showing a low level of chlorides and not used on this job. | | On this day I witnessed the running and setting of 634' of 13.375'' surface casing. With Halliburton cement services cementing the casing back to surface. There were 2 500 barrel fresh water mix tanks to be potentially used for this cement job with one tank showing a low level of chlorides and not used on this job. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1373926503 | | 1373926503 | ||
| 2013-07-15 | | 2013-07-15 | ||
− | | | + | | |
| Inspection of the drilling progress found the current drilling depth to be 3770' using a 8.750'' drill bit. With the company rigging up to start drilling on fluid. The drilling supervisor and myself discussed the recent cement tickets from Halliburton services and the fact that I am still waiting on a cement additive breakdown from those jobs. | | Inspection of the drilling progress found the current drilling depth to be 3770' using a 8.750'' drill bit. With the company rigging up to start drilling on fluid. The drilling supervisor and myself discussed the recent cement tickets from Halliburton services and the fact that I am still waiting on a cement additive breakdown from those jobs. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1374527478 | | 1374527478 | ||
| 2013-07-22 | | 2013-07-22 | ||
− | | | + | | |
| On this day I witnessed the setting of the kick plug. The well bore was plugged back after being Open Hole logged. The well TD was 6226. One solid plug was set in 2 stages; with the 1st plug set from 6225' to 5663' then 13 stands were pulled and displaced with 79 barrels the next plug set from 5663' to 5098' and then 14 stands were pulled and displaced with 72 barrels; both plugs were displaced with oil based drill mud. Class H cement was used with a mud sweep ahead. | | On this day I witnessed the setting of the kick plug. The well bore was plugged back after being Open Hole logged. The well TD was 6226. One solid plug was set in 2 stages; with the 1st plug set from 6225' to 5663' then 13 stands were pulled and displaced with 79 barrels the next plug set from 5663' to 5098' and then 14 stands were pulled and displaced with 72 barrels; both plugs were displaced with oil based drill mud. Class H cement was used with a mud sweep ahead. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1374892816 | | 1374892816 | ||
| 2013-07-26 | | 2013-07-26 | ||
− | | | + | | |
| Status check inspection of the drilling progress found the current drilling depth to be 5129' with the driller time drilling and beginning to build the top section of the horizontal curve. The company is drilling on oil base drilling mud. | | Status check inspection of the drilling progress found the current drilling depth to be 5129' with the driller time drilling and beginning to build the top section of the horizontal curve. The company is drilling on oil base drilling mud. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1375984214 | | 1375984214 | ||
| 2013-08-08 | | 2013-08-08 | ||
− | | | + | | |
| Status check inspection on the current drilling progress found the current drilling depth to be 9615' using a 8.750'' drill bit, the drilling progress is currently delayed due to issues with the mud pump. | | Status check inspection on the current drilling progress found the current drilling depth to be 9615' using a 8.750'' drill bit, the drilling progress is currently delayed due to issues with the mud pump. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1376586374 | | 1376586374 | ||
| 2013-08-15 | | 2013-08-15 | ||
− | | | + | | |
| The total depth to be drilled has been reached at 11,829. With a Azimuth of 315.23 degrees. | | The total depth to be drilled has been reached at 11,829. With a Azimuth of 315.23 degrees. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1377012316 | | 1377012316 | ||
| 2013-08-20 | | 2013-08-20 | ||
− | | | + | | |
| On this day I received from the company man on site the records from the casing long string cement job. I also spoke with Tim Neil from Triad Hunter and we are working with Halliburton to get the incomplete cement ticket information so I may complete the casing cement reports. | | On this day I received from the company man on site the records from the casing long string cement job. I also spoke with Tim Neil from Triad Hunter and we are working with Halliburton to get the incomplete cement ticket information so I may complete the casing cement reports. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403209629 | | 1403209629 | ||
| 2014-03-05 | | 2014-03-05 | ||
− | | | + | | |
− | | | + | | Status check inspection found Producers Services set up stimulating stage 6 of 28 to be completed Grey wire line services perforated the well bore from 10,580' to 10,730' with 4 clusters of 18 shots with a completion frac plug set at 10,755'. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -2025227400 | ||
+ | | 2013-07-08 | ||
+ | | | ||
+ | | Status check inspection of the current well bore segment total drilling depth reached at 3075' using a 12.250'' bit. The drilling company Alpha Hunter rig # 7 is pulling out of the hole with the drill string in preparation of running the 9.625'' casing. A copy of the casing tally was received and reviewed. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -420846708 | ||
+ | | 2014-03-05 | ||
+ | | | ||
+ | | Status check inspection found Producers Services set up stimulating stage 7 of 28 to be completed Grey wire line services perforated the well bore from 10,534' to 10,384' with 4 clusters of 18 shots with a completion frac plug set at 10,559'. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -573233421 | ||
+ | | 2013-06-10 | ||
+ | | | ||
+ | | The said well was spudded on 06/09/13 by Express Energy services with 100' of 26'' conductor set and cemented to surface on 06/09/13. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 718447954 | | 718447954 | ||
| 2013-06-27 | | 2013-06-27 | ||
− | | | + | | |
| Status check inspection found Alpha Hunter rig # 7 rigging up on the hole and should respud within the next 48 hours. | | Status check inspection found Alpha Hunter rig # 7 rigging up on the hole and should respud within the next 48 hours. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -752971448 | ||
+ | | 2014-03-17 | ||
+ | | | ||
+ | | Status check inspection of the production casing post stimulation clean out process found a service rig on the hole currently drilling out between the 6th and 7th stimulation plug set. Recommendations were given to the company representative on site to ground all tanks being used in the process and consider using explosion proof fluid transfer portable pumps along with move the portable heaters back from the operations to a distance of not less than 50'. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 790407939 | | 790407939 | ||
| 2013-07-19 | | 2013-07-19 | ||
− | | | + | | |
| Status check inspection found the drilling rig Alpha Hunter Rig # 7 tripping back in the hole after a bit change. The current drilling depth is 5859' with a 8.750'' bit with a projected total depth of this current stage to be 6,200', the company will then plug back and start to drill and build their horizontal curve. | | Status check inspection found the drilling rig Alpha Hunter Rig # 7 tripping back in the hole after a bit change. The current drilling depth is 5859' with a 8.750'' bit with a projected total depth of this current stage to be 6,200', the company will then plug back and start to drill and build their horizontal curve. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -985416215 | ||
+ | | 2013-07-11 | ||
+ | | | ||
+ | | Status check inspection and review of the 9.625'' casing ran and cemented along with the review of the BOP test. Upon review of the BOP test it was noted that the pipe ram test was not done due to the proper the company not having the right pipe rams. The accumulator remotely controlled actuation control panel was not functioning and would only manually operate. The company man on site and myself agreed that a full BOP and accumulator retest was to be done before proceeding to drill again once the proper repairs were made. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-111-24395 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.64171705,"lon":-80.92735226,"icon":""}]} |
County: Monroe | |
Municipality: | |
Operator Name: TRIAD HUNTER LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-06-09 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.64171705 | |
Longitude: -80.92735226 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-1 | 11531.0 | 7.0 | 537.0 | 7.0 | ||
2014-2 | 252960.0 | 17.0 | 1624.0 | 17.0 | ||
2014-3 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2014-4 | 0.0 | 0.0 | 0.0 | 0.0 | ||
2015-1 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-103380974 | 2013-08-12 | Status check inspection update on the current drilling progress found the current drilling depth to be 10,272' with a projected total depth to be drilled of 11,823'. The company is currently off bottom and circulating the borehole due to a equipment malfunction on one of the mud pumps, the pump is due to be repaired by the end of the day and drilling is to resume. | ||||
1372777495 | 2013-07-02 | Status check inspection of the drilling progress found the current drilling depth to be 352' using a 17.5 bit and drilling on air. The next casing to be set shall be 13.375 surface at 632'. | ||||
1372879708 | 2013-07-03 | On this day I witnessed the running and setting of 634' of 13.375 surface casing. With Halliburton cement services cementing the casing back to surface. There were 2 500 barrel fresh water mix tanks to be potentially used for this cement job with one tank showing a low level of chlorides and not used on this job. | ||||
1373926503 | 2013-07-15 | Inspection of the drilling progress found the current drilling depth to be 3770' using a 8.750 drill bit. With the company rigging up to start drilling on fluid. The drilling supervisor and myself discussed the recent cement tickets from Halliburton services and the fact that I am still waiting on a cement additive breakdown from those jobs. | ||||
1374527478 | 2013-07-22 | On this day I witnessed the setting of the kick plug. The well bore was plugged back after being Open Hole logged. The well TD was 6226. One solid plug was set in 2 stages; with the 1st plug set from 6225' to 5663' then 13 stands were pulled and displaced with 79 barrels the next plug set from 5663' to 5098' and then 14 stands were pulled and displaced with 72 barrels; both plugs were displaced with oil based drill mud. Class H cement was used with a mud sweep ahead. | ||||
1374892816 | 2013-07-26 | Status check inspection of the drilling progress found the current drilling depth to be 5129' with the driller time drilling and beginning to build the top section of the horizontal curve. The company is drilling on oil base drilling mud. | ||||
1375984214 | 2013-08-08 | Status check inspection on the current drilling progress found the current drilling depth to be 9615' using a 8.750 drill bit, the drilling progress is currently delayed due to issues with the mud pump. | ||||
1376586374 | 2013-08-15 | The total depth to be drilled has been reached at 11,829. With a Azimuth of 315.23 degrees. | ||||
1377012316 | 2013-08-20 | On this day I received from the company man on site the records from the casing long string cement job. I also spoke with Tim Neil from Triad Hunter and we are working with Halliburton to get the incomplete cement ticket information so I may complete the casing cement reports. | ||||
1403209629 | 2014-03-05 | Status check inspection found Producers Services set up stimulating stage 6 of 28 to be completed Grey wire line services perforated the well bore from 10,580' to 10,730' with 4 clusters of 18 shots with a completion frac plug set at 10,755'. | ||||
-2025227400 | 2013-07-08 | Status check inspection of the current well bore segment total drilling depth reached at 3075' using a 12.250 bit. The drilling company Alpha Hunter rig # 7 is pulling out of the hole with the drill string in preparation of running the 9.625 casing. A copy of the casing tally was received and reviewed. | ||||
-420846708 | 2014-03-05 | Status check inspection found Producers Services set up stimulating stage 7 of 28 to be completed Grey wire line services perforated the well bore from 10,534' to 10,384' with 4 clusters of 18 shots with a completion frac plug set at 10,559'. | ||||
-573233421 | 2013-06-10 | The said well was spudded on 06/09/13 by Express Energy services with 100' of 26 conductor set and cemented to surface on 06/09/13. | ||||
718447954 | 2013-06-27 | Status check inspection found Alpha Hunter rig # 7 rigging up on the hole and should respud within the next 48 hours. | ||||
-752971448 | 2014-03-17 | Status check inspection of the production casing post stimulation clean out process found a service rig on the hole currently drilling out between the 6th and 7th stimulation plug set. Recommendations were given to the company representative on site to ground all tanks being used in the process and consider using explosion proof fluid transfer portable pumps along with move the portable heaters back from the operations to a distance of not less than 50'. | ||||
790407939 | 2013-07-19 | Status check inspection found the drilling rig Alpha Hunter Rig # 7 tripping back in the hole after a bit change. The current drilling depth is 5859' with a 8.750 bit with a projected total depth of this current stage to be 6,200', the company will then plug back and start to drill and build their horizontal curve. | ||||
-985416215 | 2013-07-11 | Status check inspection and review of the 9.625 casing ran and cemented along with the review of the BOP test. Upon review of the BOP test it was noted that the pipe ram test was not done due to the proper the company not having the right pipe rams. The accumulator remotely controlled actuation control panel was not functioning and would only manually operate. The company man on site and myself agreed that a full BOP and accumulator retest was to be done before proceeding to drill again once the proper repairs were made. |