If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-151-25673 | | Well ID: 34-151-25673 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.78609211, -81.51307763 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Stark County, Ohio|Stark]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[OHIO VALLEY ENERGY SYSTEM CORP]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2010-05-22 | | Spud Date: 2010-05-22 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.78609211 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.51307763 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2011-0 | ||
+ | | style="text-align:right;" | 43522.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012-0 | ||
+ | | style="text-align:right;" | 34891.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 30565.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 36174.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 94: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1091674764 | | -1091674764 | ||
| 2010-05-04 | | 2010-05-04 | ||
− | | | + | | |
| Jay Cheslock received a complaint call from Lucille Parker (330-832-1937) on 5-4-2010 regarding activity at the new drilling location near her home at 929 3rd St. SE in Massillon, OH. I inspected the site and met with John Rose, who was building the access road and pushing topsoil. I also met with Lucille Parker and discussed the future drilling activities at the site. | | Jay Cheslock received a complaint call from Lucille Parker (330-832-1937) on 5-4-2010 regarding activity at the new drilling location near her home at 929 3rd St. SE in Massillon, OH. I inspected the site and met with John Rose, who was building the access road and pushing topsoil. I also met with Lucille Parker and discussed the future drilling activities at the site. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1274728736 | | 1274728736 | ||
| 2010-05-22 | | 2010-05-22 | ||
− | | | + | | |
| Wildcat Drilling is moving onto the location and will spud the well tonight. I met with John Howell and discussed the urban drilling requirements. | | Wildcat Drilling is moving onto the location and will spud the well tonight. I met with John Howell and discussed the urban drilling requirements. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1275072788 | | 1275072788 | ||
| 2010-05-26 | | 2010-05-26 | ||
− | | | + | | |
| Dusting at 4470'. Drilling pits and liners are intact. | | Dusting at 4470'. Drilling pits and liners are intact. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1275412521 | | 1275412521 | ||
| 2010-05-29 | | 2010-05-29 | ||
− | | | + | | |
| The Rose Run was dry. Petroset pumped the Rose Run, Trenton, and thief plugs thru drill pipe. The well was plugged back to the Clinton Sandstone. 4-1/2'' dia casing was run thru the Clinton Sandstone and cemented. | | The Rose Run was dry. Petroset pumped the Rose Run, Trenton, and thief plugs thru drill pipe. The well was plugged back to the Clinton Sandstone. 4-1/2'' dia casing was run thru the Clinton Sandstone and cemented. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1275938009 | | 1275938009 | ||
| 2010-06-03 | | 2010-06-03 | ||
− | | | + | | |
| The location and the drilling pits are fenced. The drilling pits are 1/2 full. There are 2 - 500 bbl frac tanks on the location. | | The location and the drilling pits are fenced. The drilling pits are 1/2 full. There are 2 - 500 bbl frac tanks on the location. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1277923044 | | 1277923044 | ||
| 2010-06-29 | | 2010-06-29 | ||
− | | | + | | |
| The well has been completed. The drilling pits are closed. There is 1 - 300 bbl frac tank on the location. | | The well has been completed. The drilling pits are closed. There is 1 - 300 bbl frac tank on the location. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1281030277 | | 1281030277 | ||
| 2010-05-28 | | 2010-05-28 | ||
− | | | + | | |
| Switched over to fluid drilling at 6593'. Reached T.D. of 6869' Will trip out of the hole to log. | | Switched over to fluid drilling at 6593'. Reached T.D. of 6869' Will trip out of the hole to log. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1285462867 | | 1285462867 | ||
| 2010-09-23 | | 2010-09-23 | ||
− | | | + | | |
| The well is ready to go into production and the reclamation is nearly completed at the site. I called Dale Nething (Ohio Valley) and requested additional seeding at the site. I did not pass the Preliminary Restoration at this time. | | The well is ready to go into production and the reclamation is nearly completed at the site. I called Dale Nething (Ohio Valley) and requested additional seeding at the site. I did not pass the Preliminary Restoration at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1326809656 | | 1326809656 | ||
| 2012-01-06 | | 2012-01-06 | ||
− | | | + | | |
| On 1/6/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Restorstion is PASSED. | | On 1/6/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Restorstion is PASSED. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1526207800 | ||
+ | | 2010-03-23 | ||
+ | | | ||
+ | | I met with Dale Nething (Ohio Valley Energy) and John Howell (Wildcat Drilling) to discuss the future location of the drilling pits. This well will be drilled before July 2010. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1526301345 | | 1526301345 | ||
| 2010-05-23 | | 2010-05-23 | ||
− | | | + | | |
| Petroset cemented 11-3/4'' dia conductor casing. The drilling pits are fenced off and the pit liners are intact. | | Petroset cemented 11-3/4'' dia conductor casing. The drilling pits are fenced off and the pit liners are intact. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1594307993 | | 1594307993 | ||
| 2010-07-13 | | 2010-07-13 | ||
− | | | + | | |
| The tank battery is set and the location is graded but not seeded. | | The tank battery is set and the location is graded but not seeded. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 177230565 | | 177230565 | ||
| 2010-06-08 | | 2010-06-08 | ||
− | | | + | | |
| The drilling pits are being solidified today. | | The drilling pits are being solidified today. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1819843662 | | 1819843662 | ||
| 2010-05-24 | | 2010-05-24 | ||
− | | | + | | |
| Universal cemented 8-5/8'' dia surface casing. The drilling pits are fenced off and the pit liners are intact. | | Universal cemented 8-5/8'' dia surface casing. The drilling pits are fenced off and the pit liners are intact. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 2076440435 | | 2076440435 | ||
| 2014-03-24 | | 2014-03-24 | ||
− | | | + | | |
| During my inspection I found this well to be plugged back from the Rose Run formation to the Clinton Sandstone and is currently a production well, not plugged and abandoned as listed on RBDMS. I found a fenced tank battery with a 100 bbl production tank, 50 bbl poly brine tank and a horizontal separator. The tank battery and well have proper I.D. signs. The well is a plunger lift well that is fenced. The location has vegetation established and landscaping in place. There are no violations at this time. | | During my inspection I found this well to be plugged back from the Rose Run formation to the Clinton Sandstone and is currently a production well, not plugged and abandoned as listed on RBDMS. I found a fenced tank battery with a 100 bbl production tank, 50 bbl poly brine tank and a horizontal separator. The tank battery and well have proper I.D. signs. The well is a plunger lift well that is fenced. The location has vegetation established and landscaping in place. There are no violations at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 298917174 | | 298917174 | ||
| 2010-06-01 | | 2010-06-01 | ||
− | | | + | | |
| Wildcat Drilling is rigging down and moving off of the location. | | Wildcat Drilling is rigging down and moving off of the location. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-151-25673 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.78609211,"lon":-81.51307763,"icon":""}]} |
County: Stark | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-05-22 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.78609211 | |
Longitude: -81.51307763 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 43522.0 | 0.0 | ||||
2012-0 | 34891.0 | 0.0 | ||||
2013-0 | 30565.0 | 0.0 | ||||
2014-0 | 36174.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1091674764 | 2010-05-04 | Jay Cheslock received a complaint call from Lucille Parker (330-832-1937) on 5-4-2010 regarding activity at the new drilling location near her home at 929 3rd St. SE in Massillon, OH. I inspected the site and met with John Rose, who was building the access road and pushing topsoil. I also met with Lucille Parker and discussed the future drilling activities at the site. | ||||
1274728736 | 2010-05-22 | Wildcat Drilling is moving onto the location and will spud the well tonight. I met with John Howell and discussed the urban drilling requirements. | ||||
1275072788 | 2010-05-26 | Dusting at 4470'. Drilling pits and liners are intact. | ||||
1275412521 | 2010-05-29 | The Rose Run was dry. Petroset pumped the Rose Run, Trenton, and thief plugs thru drill pipe. The well was plugged back to the Clinton Sandstone. 4-1/2 dia casing was run thru the Clinton Sandstone and cemented. | ||||
1275938009 | 2010-06-03 | The location and the drilling pits are fenced. The drilling pits are 1/2 full. There are 2 - 500 bbl frac tanks on the location. | ||||
1277923044 | 2010-06-29 | The well has been completed. The drilling pits are closed. There is 1 - 300 bbl frac tank on the location. | ||||
1281030277 | 2010-05-28 | Switched over to fluid drilling at 6593'. Reached T.D. of 6869' Will trip out of the hole to log. | ||||
1285462867 | 2010-09-23 | The well is ready to go into production and the reclamation is nearly completed at the site. I called Dale Nething (Ohio Valley) and requested additional seeding at the site. I did not pass the Preliminary Restoration at this time. | ||||
1326809656 | 2012-01-06 | On 1/6/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Restorstion is PASSED. | ||||
-1526207800 | 2010-03-23 | I met with Dale Nething (Ohio Valley Energy) and John Howell (Wildcat Drilling) to discuss the future location of the drilling pits. This well will be drilled before July 2010. | ||||
1526301345 | 2010-05-23 | Petroset cemented 11-3/4 dia conductor casing. The drilling pits are fenced off and the pit liners are intact. | ||||
1594307993 | 2010-07-13 | The tank battery is set and the location is graded but not seeded. | ||||
177230565 | 2010-06-08 | The drilling pits are being solidified today. | ||||
1819843662 | 2010-05-24 | Universal cemented 8-5/8 dia surface casing. The drilling pits are fenced off and the pit liners are intact. | ||||
2076440435 | 2014-03-24 | During my inspection I found this well to be plugged back from the Rose Run formation to the Clinton Sandstone and is currently a production well, not plugged and abandoned as listed on RBDMS. I found a fenced tank battery with a 100 bbl production tank, 50 bbl poly brine tank and a horizontal separator. The tank battery and well have proper I.D. signs. The well is a plunger lift well that is fenced. The location has vegetation established and landscaping in place. There are no violations at this time. | ||||
298917174 | 2010-06-01 | Wildcat Drilling is rigging down and moving off of the location. |