| Well ID: 34-139-20764
 
| Well ID: 34-139-20764
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.584264051, -82.4612026209 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.58426405, -82.46120262 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Richland County, Ohio|Richland]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[BI JOE DEVELOPMENT INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-09-20
 
| Spud Date: 2013-09-20
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Final Restoration
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.584264051
+
| Latitude: 40.58426405
 
|-
 
|-
| Longitude: -82.4612026209
+
| Longitude: -82.46120262
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 31.0
 +
|
 +
|
 +
| style="text-align:right;" | 23.0
 +
| style="text-align:right;" | 31.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -1459872067
 
| 2014-07-02
 
|
 
| The temporary tank has been removed from the location.  The operator is going to plug the well.
 
|
 
|
 
|
 
|-
 
|-
 
| -1787106971
 
| 2013-09-24
 
|
 
| Drilling at 2410 feet.  The intermediate string is anticipated to be set in 24 hours.
 
|
 
|
 
|
 
|-
 
|-
 
| -1840801381
 
| 2013-10-02
 
|
 
| Mac Oil water trucks are on site pumping pit water.  Water is being hauled to one of Mac's disposal wells.  The cutting pit is nearly dewatered.  The well has been equipped with a well head.  R&B Enterprises has a hoe on site taking up the pad.
 
|
 
|
 
|
 
|-
 
|-
 
| -1880364626
 
| 2014-08-18
 
|
 
| The operator submitted a landowner waiver for the location.  The access road and well pad are to be left for the landowner.  The operator is responsible for installing water controls on the access road and the landowner is going to seed the location.  The landowner wants to remove additional trees from his property using the access road prior to constructing water bars.
 
|
 
|
 
|
 
|-
 
|-
 
| -292204375
 
| 2013-10-03
 
|
 
| R&B Enterprises personnel are restoring the well site.  The mud pit is closed.  Trees are being buried in the cutting pit.  The pits were not solidified.  Water was hauled out yesterday.  There was rain overnight and site conditions are overall muddy.
 
|
 
|
 
|
 
|-
 
|-
 
| -516046104
 
| 2013-09-21
 
|
 
| Requested by the operator to witness surface casing cement.  See the casing ticket.
 
|
 
|
 
|
 
|-
 
|-
 
| -707272165
 
| 2013-09-26
 
|
 
| The bit is being tripped back into the hole following intermediate casing cement.  Depth is still at 2650.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1379610567
 
| 1379610567
 
| 2013-09-18
 
| 2013-09-18
|
+
|  
 
| The site has been constructed.  Pits are filled with water.  Water checked OK, 112 ppm chloride which is within limits for surface hole drilling.  Equipment is being moved from permit 2-0763. Drilling should start Friday, possibly Thursday.
 
| The site has been constructed.  Pits are filled with water.  Water checked OK, 112 ppm chloride which is within limits for surface hole drilling.  Equipment is being moved from permit 2-0763. Drilling should start Friday, possibly Thursday.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1380117987
 
| 1380117987
 
| 2013-09-25
 
| 2013-09-25
|
+
|  
 
| Requested by the operator to witness intermediate casing string cement.
 
| Requested by the operator to witness intermediate casing string cement.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1381264408
 
| 1381264408
 
| 2013-10-08
 
| 2013-10-08
|
+
|  
 
| The cutting pit is still partially open.  Trees have been piled in the pit and are being buried in the backfill.  The well was being completed with rods, tubing, well head and pipe connections by Bakerwell.
 
| The cutting pit is still partially open.  Trees have been piled in the pit and are being buried in the backfill.  The well was being completed with rods, tubing, well head and pipe connections by Bakerwell.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1382108452
 
| 1382108452
 
| 2013-10-18
 
| 2013-10-18
|
+
|  
 
| The pits have been closed, the site is graded and resoiled.  The well is being pumped into a portable tank on location.  The preliminary restoration is approved.
 
| The pits have been closed, the site is graded and resoiled.  The well is being pumped into a portable tank on location.  The preliminary restoration is approved.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1400078506
 
| 1400078506
 
| 2014-05-13
 
| 2014-05-13
|
+
|  
 
| There is a temporary tank at the well.  There is a pump jack on the well.  The well is being pumped to the temporary tank.  No ID at the well.  The lease road and well site are eroding.  Vegetation failed to establish on portions of the site and the road has no surface material on it.  The operator was contacted and stated they would take care of it.
 
| There is a temporary tank at the well.  There is a pump jack on the well.  The well is being pumped to the temporary tank.  No ID at the well.  The lease road and well site are eroding.  Vegetation failed to establish on portions of the site and the road has no surface material on it.  The operator was contacted and stated they would take care of it.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1406059610
 
| 1406059610
 
| 2014-07-18
 
| 2014-07-18
|
+
|  
 
| The operator requested inspection to witness plugging the well to surface.  See the plug report for details.
 
| The operator requested inspection to witness plugging the well to surface.  See the plug report for details.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1410530235
 +
| 2014-09-11
 +
|
 +
| The operator supplied a landowner waiver allowing the road and well pad to remain.  The operator has established vegetation on the site and installed water bars on the access road.  The final restoration is approved.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1459872067
 +
| 2014-07-02
 +
|
 +
| The temporary tank has been removed from the location.  The operator is going to plug the well.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1787106971
 +
| 2013-09-24
 +
|
 +
| Drilling at 2410 feet.  The intermediate string is anticipated to be set in 24 hours.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1840801381
 +
| 2013-10-02
 +
|
 +
| Mac Oil water trucks are on site pumping pit water.  Water is being hauled to one of Mac's disposal wells.  The cutting pit is nearly dewatered.  The well has been equipped with a well head.  R&B Enterprises has a hoe on site taking up the pad.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1880364626
 +
| 2014-08-18
 +
|
 +
| The operator submitted a landowner waiver for the location.  The access road and well pad are to be left for the landowner.  The operator is responsible for installing water controls on the access road and the landowner is going to seed the location.  The landowner wants to remove additional trees from his property using the access road prior to constructing water bars.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1935650210
 
| 1935650210
 
| 2013-09-30
 
| 2013-09-30
|
+
|  
 
| The 4.5 inch was cemented in the well on 9/29/13.  The 7 inch above the cement is being pulled.  Equipment is being removed from the location.
 
| The 4.5 inch was cemented in the well on 9/29/13.  The 7 inch above the cement is being pulled.  Equipment is being removed from the location.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -292204375
 +
| 2013-10-03
 +
|
 +
| R&B Enterprises personnel are restoring the well site.  The mud pit is closed.  Trees are being buried in the cutting pit.  The pits were not solidified.  Water was hauled out yesterday.  There was rain overnight and site conditions are overall muddy.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -516046104
 +
| 2013-09-21
 +
|
 +
| Requested by the operator to witness surface casing cement.  See the casing ticket.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 53483996
 
| 53483996
 
| 2014-07-16
 
| 2014-07-16
|
+
|  
 
| Requested by Bakerwell to witness setting the bottom plug in the well.  See the plug report for details.
 
| Requested by Bakerwell to witness setting the bottom plug in the well.  See the plug report for details.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -707272165
 +
| 2013-09-26
 +
|
 +
| The bit is being tripped back into the hole following intermediate casing cement.  Depth is still at 2650.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 17:34, 15 July 2015

Well Details

Well ID: 34-139-20764
Loading map...
County: Richland
Municipality:
Operator Name: BI JOE DEVELOPMENT INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-09-20
Unconventional: No
Configuration: Vertical
Well Status: Final Restoration
Violations: 0
Latitude: 40.58426405
Longitude: -82.46120262

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 0.0 0.0
2014-0 0.0 31.0 23.0 31.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1379610567 2013-09-18 The site has been constructed. Pits are filled with water. Water checked OK, 112 ppm chloride which is within limits for surface hole drilling. Equipment is being moved from permit 2-0763. Drilling should start Friday, possibly Thursday.
1380117987 2013-09-25 Requested by the operator to witness intermediate casing string cement.
1381264408 2013-10-08 The cutting pit is still partially open. Trees have been piled in the pit and are being buried in the backfill. The well was being completed with rods, tubing, well head and pipe connections by Bakerwell.
1382108452 2013-10-18 The pits have been closed, the site is graded and resoiled. The well is being pumped into a portable tank on location. The preliminary restoration is approved.
1400078506 2014-05-13 There is a temporary tank at the well. There is a pump jack on the well. The well is being pumped to the temporary tank. No ID at the well. The lease road and well site are eroding. Vegetation failed to establish on portions of the site and the road has no surface material on it. The operator was contacted and stated they would take care of it.
1406059610 2014-07-18 The operator requested inspection to witness plugging the well to surface. See the plug report for details.
1410530235 2014-09-11 The operator supplied a landowner waiver allowing the road and well pad to remain. The operator has established vegetation on the site and installed water bars on the access road. The final restoration is approved.
-1459872067 2014-07-02 The temporary tank has been removed from the location. The operator is going to plug the well.
-1787106971 2013-09-24 Drilling at 2410 feet. The intermediate string is anticipated to be set in 24 hours.
-1840801381 2013-10-02 Mac Oil water trucks are on site pumping pit water. Water is being hauled to one of Mac's disposal wells. The cutting pit is nearly dewatered. The well has been equipped with a well head. R&B Enterprises has a hoe on site taking up the pad.
-1880364626 2014-08-18 The operator submitted a landowner waiver for the location. The access road and well pad are to be left for the landowner. The operator is responsible for installing water controls on the access road and the landowner is going to seed the location. The landowner wants to remove additional trees from his property using the access road prior to constructing water bars.
1935650210 2013-09-30 The 4.5 inch was cemented in the well on 9/29/13. The 7 inch above the cement is being pulled. Equipment is being removed from the location.
-292204375 2013-10-03 R&B Enterprises personnel are restoring the well site. The mud pit is closed. Trees are being buried in the cutting pit. The pits were not solidified. Water was hauled out yesterday. There was rain overnight and site conditions are overall muddy.
-516046104 2013-09-21 Requested by the operator to witness surface casing cement. See the casing ticket.
53483996 2014-07-16 Requested by Bakerwell to witness setting the bottom plug in the well. See the plug report for details.
-707272165 2013-09-26 The bit is being tripped back into the hole following intermediate casing cement. Depth is still at 2650.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.