If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-111-24484 | | Well ID: 34-111-24484 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.83286406, -81.3021826 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Monroe County, Ohio|Monroe]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[ANTERO RESOURCES CORPORATION]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-06-19 | | Spud Date: 2014-06-19 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.83286406 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.3021826 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 575224.0 | ||
+ | | style="text-align:right;" | 38.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 973.0 | ||
+ | | style="text-align:right;" | 38.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 968878.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 179.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 76: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1082138374 | | -1082138374 | ||
| 2014-07-16 | | 2014-07-16 | ||
− | | | + | | |
− | | My inspection today finds the drilling rig, Patterson 342 is drilling a 8.75 | + | | My inspection today finds the drilling rig, Patterson 342 is drilling a 8.75 hole at a depth of 9250'. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1403200153 | | 1403200153 | ||
| 2014-06-19 | | 2014-06-19 | ||
− | | | + | | |
− | | | + | | The said well was spudded on this day by Express Energy with a proposed 100' of 32'' conductor borehole to be drilled. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 1423516816 | ||
+ | | 2015-02-09 | ||
+ | | | ||
+ | | Preliminary Restoration status check inspection found the well is now in production with a gas processing unit in place on location associated to the said well. There a quantity of 8- 400 barrel production tanks on location supporting the 6 producing wells now located on the well pad. Preliminary Restoration was passed on this day. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1479145555 | | 1479145555 | ||
| 2014-07-22 | | 2014-07-22 | ||
− | | | + | | |
− | | | + | | Status check inspection on the drilling process found the current drilling depth to be 14,973' using a 8.5'' directional drilling assembly with a current directional azmuth of 146.71 degrees and 3817 units of 3rd party gas present. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1514961832 | | 1514961832 | ||
| 2014-06-28 | | 2014-06-28 | ||
− | | | + | | |
− | | I am onsite to witness surface cementing operations. Patterson rig 342 ran 349' of 18.635 | + | | I am onsite to witness surface cementing operations. Patterson rig 342 ran 349' of 18.635 casing. Allied Oil and Gas Services circulated 720 sacks of class A cement into place. I witnessed 65 barrels of cement return to surface. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1691017904 | ||
+ | | 2014-10-27 | ||
+ | | | ||
+ | | Status check inspection on the well completion process found Fortis Well Service work over rig on the hole. The completion plugs have been drilled out to total well depth and the company is circulating the well bore in preparation of pulling the work over drill out tubing string, once completed the company will run 2.875'' tubing in the well. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -273007951 | ||
+ | | 2014-09-09 | ||
+ | | | ||
+ | | Status check inspection on the completion process found Renegade wireline service on location running in the hole to perforate the 4th stage to be stimulated by US Well Service, a solid bridge plug will be set at 15,453' and perforations will be shot in 6 -10 shot clusters between 15,438' and 15,290'. A site walk through found all 500 barrel tanks being used along with all portable generators with proper grounding along with containment placed in critical fluid areas. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 443284723 | | 443284723 | ||
| 2014-06-20 | | 2014-06-20 | ||
− | | | + | | |
− | | | + | | The said well was spudded on 06/19/2014 by Express Energy's top hole rig with 100' of 32'' conductor borehole being drilled and on 06/20/14 100' of 26'' conductor was set and cemented to surface by Express Energy's cement services using 330 sacks of class A cement- 2% calcium-.50 pound per sack flow seal with 10 barrels of cement returns to surface. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 803270917 | | 803270917 | ||
| 2014-07-09 | | 2014-07-09 | ||
− | | | + | | |
− | | | + | | Status check inspection found Patterson Drilling on the hole and the 12.250'' diameter 2nd intermediate well bore has been drilled to a completed total depth of 7,147' and the company is pulling out of the hole with the drill string and preparing to run the 9.625'' 2nd intermediate casing string. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 948612233 | | 948612233 | ||
| 2014-07-02 | | 2014-07-02 | ||
− | | | + | | |
− | | I am onsite to witness the first intermediate casing string cementing operations. Patterson rig 342 ran 2197' of 13.375 | + | | I am onsite to witness the first intermediate casing string cementing operations. Patterson rig 342 ran 2197' of 13.375 J-55 casing. Allied Oil and Gas Services cemented the casing in place with 394 barrels of class A cement. I witnessed good cement returns to surface. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-111-24484 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.83286406,"lon":-81.3021826,"icon":""}]} |
County: Monroe | |
Municipality: | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-06-19 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.83286406 | |
Longitude: -81.3021826 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2014-4 | 575224.0 | 38.0 | 973.0 | 38.0 | ||
2015-1 | 968878.0 | 90.0 | 179.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1082138374 | 2014-07-16 | My inspection today finds the drilling rig, Patterson 342 is drilling a 8.75 hole at a depth of 9250'. | ||||
1403200153 | 2014-06-19 | The said well was spudded on this day by Express Energy with a proposed 100' of 32 conductor borehole to be drilled. | ||||
1423516816 | 2015-02-09 | Preliminary Restoration status check inspection found the well is now in production with a gas processing unit in place on location associated to the said well. There a quantity of 8- 400 barrel production tanks on location supporting the 6 producing wells now located on the well pad. Preliminary Restoration was passed on this day. | ||||
1479145555 | 2014-07-22 | Status check inspection on the drilling process found the current drilling depth to be 14,973' using a 8.5 directional drilling assembly with a current directional azmuth of 146.71 degrees and 3817 units of 3rd party gas present. | ||||
1514961832 | 2014-06-28 | I am onsite to witness surface cementing operations. Patterson rig 342 ran 349' of 18.635 casing. Allied Oil and Gas Services circulated 720 sacks of class A cement into place. I witnessed 65 barrels of cement return to surface. | ||||
-1691017904 | 2014-10-27 | Status check inspection on the well completion process found Fortis Well Service work over rig on the hole. The completion plugs have been drilled out to total well depth and the company is circulating the well bore in preparation of pulling the work over drill out tubing string, once completed the company will run 2.875 tubing in the well. | ||||
-273007951 | 2014-09-09 | Status check inspection on the completion process found Renegade wireline service on location running in the hole to perforate the 4th stage to be stimulated by US Well Service, a solid bridge plug will be set at 15,453' and perforations will be shot in 6 -10 shot clusters between 15,438' and 15,290'. A site walk through found all 500 barrel tanks being used along with all portable generators with proper grounding along with containment placed in critical fluid areas. | ||||
443284723 | 2014-06-20 | The said well was spudded on 06/19/2014 by Express Energy's top hole rig with 100' of 32 conductor borehole being drilled and on 06/20/14 100' of 26 conductor was set and cemented to surface by Express Energy's cement services using 330 sacks of class A cement- 2% calcium-.50 pound per sack flow seal with 10 barrels of cement returns to surface. | ||||
803270917 | 2014-07-09 | Status check inspection found Patterson Drilling on the hole and the 12.250 diameter 2nd intermediate well bore has been drilled to a completed total depth of 7,147' and the company is pulling out of the hole with the drill string and preparing to run the 9.625 2nd intermediate casing string. | ||||
948612233 | 2014-07-02 | I am onsite to witness the first intermediate casing string cementing operations. Patterson rig 342 ran 2197' of 13.375 J-55 casing. Allied Oil and Gas Services cemented the casing in place with 394 barrels of class A cement. I witnessed good cement returns to surface. |
For data sources see[2]