X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-067-21319"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-067-21319
 
| Well ID: 34-067-21319
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.230745016, -81.0236749426 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.23074502, -81.02367494 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Harrison County, Ohio|Harrison]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[HESS OHIO DEVELOPMENTS LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2014-05-15
 
| Spud Date: 2014-05-15
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Well Drilled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.230745016
+
| Latitude: 40.23074502
 
|-
 
|-
| Longitude: -81.0236749426
+
| Longitude: -81.02367494
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
|-
 
| -1668546082
 
| 2014-05-14
 
|
 
| HAD Drilling Rig # 618  drilling at 360 ft and are broke down for repairs. Should be ready to set casing in the morning.
 
|
 
|
 
|
 
|-
 
|-
 
| -660688240
 
| 2014-07-07
 
|
 
| I am checking on the drilling status of H & P Drilling Rig # 287 and found that they are drilling out from under the intermediate casing section of the well at 2400 ft
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1183164642
 
| 1183164642
 
| 2014-06-12
 
| 2014-06-12
|
+
|  
| I am on site today to witness the running and cementing of the 13-3/8" inch diameter casing string. H &P Drilling Rig # 287 drilled a 17.5" inch diameter hole to 1926 ft and set 1920 ft of casing. Halliburton Energy Cemented with 790 sacks of class H cement at 15.8 lbs and a yield of 2.31
+
| I am on site today to witness the running and cementing of the 13-3/8 inch diameter casing string. H &P Drilling Rig # 287 drilled a 17.5 inch diameter hole to 1926 ft and set 1920 ft of casing. Halliburton Energy Cemented with 790 sacks of class H cement at 15.8 lbs and a yield of 2.31
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1400198475
 
| 1400198475
 
| 2014-05-15
 
| 2014-05-15
|
+
|  
 
| Arrive today to witness the running and the cementing of the casing string and found that HAD Drilling is broke down and will be ready at 4 this afternoon. Return at 4pm and found that they still do not have everything fixed and now the cement job will be 7 am Fri morning.
 
| Arrive today to witness the running and the cementing of the casing string and found that HAD Drilling is broke down and will be ready at 4 this afternoon. Return at 4pm and found that they still do not have everything fixed and now the cement job will be 7 am Fri morning.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1400242520
 
| 1400242520
 
| 2014-05-16
 
| 2014-05-16
|
+
|  
 
| On arrival on location H A D Drilling was install 18 5/8 casing and preparing to cement. Halliburton Energy Services will cement. Established circulation but did not see cement returns to surface. Going to run bond log and then grout to surface.
 
| On arrival on location H A D Drilling was install 18 5/8 casing and preparing to cement. Halliburton Energy Services will cement. Established circulation but did not see cement returns to surface. Going to run bond log and then grout to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1402606865
 
| 1402606865
 
| 2014-06-12
 
| 2014-06-12
|
+
|  
| Onsite with Inspector Mark Moreland to witness the cementing of the intermediate casing. H & P had drilled a 17.5" open hole to a depth of 1926'. They had 1931' of 13 3/8" casing set from the rig floor. Halliburton was onsite to cement this intermediate casing with a class H cement (15.8 ppg; 2.31 yield). Inspector calculations indicate 850 sacks of cement and 292 barrels to displace. Good return were viewed in the cellar. See his report for this date.
+
| Onsite with Inspector Mark Moreland to witness the cementing of the intermediate casing. H & P had drilled a 17.5 open hole to a depth of 1926'. They had 1931' of 13 3/8 casing set from the rig floor. Halliburton was onsite to cement this intermediate casing with a class H cement (15.8 ppg; 2.31 yield). Inspector calculations indicate 850 sacks of cement and 292 barrels to displace. Good return were viewed in the cellar. See his report for this date.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1668546082
 +
| 2014-05-14
 +
|
 +
| HAD Drilling Rig # 618  drilling at 360 ft and are broke down for repairs. Should be ready to set casing in the morning.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -660688240
 +
| 2014-07-07
 +
|
 +
| I am checking on the drilling status of H & P Drilling Rig # 287 and found that they are drilling out from under the intermediate casing section of the well at 2400 ft
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 19:58, 15 July 2015

Well Details

Well ID: 34-067-21319
Loading map...
County: Harrison
Municipality:
Operator Name: HESS OHIO DEVELOPMENTS LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-05-15
Unconventional: No
Configuration: Vertical
Well Status: Well Drilled
Violations: 0
Latitude: 40.23074502
Longitude: -81.02367494

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1183164642 2014-06-12 I am on site today to witness the running and cementing of the 13-3/8 inch diameter casing string. H &P Drilling Rig # 287 drilled a 17.5 inch diameter hole to 1926 ft and set 1920 ft of casing. Halliburton Energy Cemented with 790 sacks of class H cement at 15.8 lbs and a yield of 2.31
1400198475 2014-05-15 Arrive today to witness the running and the cementing of the casing string and found that HAD Drilling is broke down and will be ready at 4 this afternoon. Return at 4pm and found that they still do not have everything fixed and now the cement job will be 7 am Fri morning.
1400242520 2014-05-16 On arrival on location H A D Drilling was install 18 5/8 casing and preparing to cement. Halliburton Energy Services will cement. Established circulation but did not see cement returns to surface. Going to run bond log and then grout to surface.
1402606865 2014-06-12 Onsite with Inspector Mark Moreland to witness the cementing of the intermediate casing. H & P had drilled a 17.5 open hole to a depth of 1926'. They had 1931' of 13 3/8 casing set from the rig floor. Halliburton was onsite to cement this intermediate casing with a class H cement (15.8 ppg; 2.31 yield). Inspector calculations indicate 850 sacks of cement and 292 barrels to displace. Good return were viewed in the cellar. See his report for this date.
-1668546082 2014-05-14 HAD Drilling Rig # 618 drilling at 360 ft and are broke down for repairs. Should be ready to set casing in the morning.
-660688240 2014-07-07 I am checking on the drilling status of H & P Drilling Rig # 287 and found that they are drilling out from under the intermediate casing section of the well at 2400 ft

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.