If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-067-21319 | | Well ID: 34-067-21319 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.23074502, -81.02367494 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Harrison County, Ohio|Harrison]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[HESS OHIO DEVELOPMENTS LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-05-15 | | Spud Date: 2014-05-15 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Well Drilled |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.23074502 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.02367494 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1183164642 | | 1183164642 | ||
| 2014-06-12 | | 2014-06-12 | ||
− | | | + | | |
− | | I am on site today to witness the running and cementing of the 13-3/8 | + | | I am on site today to witness the running and cementing of the 13-3/8 inch diameter casing string. H &P Drilling Rig # 287 drilled a 17.5 inch diameter hole to 1926 ft and set 1920 ft of casing. Halliburton Energy Cemented with 790 sacks of class H cement at 15.8 lbs and a yield of 2.31 |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1400198475 | | 1400198475 | ||
| 2014-05-15 | | 2014-05-15 | ||
− | | | + | | |
| Arrive today to witness the running and the cementing of the casing string and found that HAD Drilling is broke down and will be ready at 4 this afternoon. Return at 4pm and found that they still do not have everything fixed and now the cement job will be 7 am Fri morning. | | Arrive today to witness the running and the cementing of the casing string and found that HAD Drilling is broke down and will be ready at 4 this afternoon. Return at 4pm and found that they still do not have everything fixed and now the cement job will be 7 am Fri morning. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1400242520 | | 1400242520 | ||
| 2014-05-16 | | 2014-05-16 | ||
− | | | + | | |
| On arrival on location H A D Drilling was install 18 5/8 casing and preparing to cement. Halliburton Energy Services will cement. Established circulation but did not see cement returns to surface. Going to run bond log and then grout to surface. | | On arrival on location H A D Drilling was install 18 5/8 casing and preparing to cement. Halliburton Energy Services will cement. Established circulation but did not see cement returns to surface. Going to run bond log and then grout to surface. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1402606865 | | 1402606865 | ||
| 2014-06-12 | | 2014-06-12 | ||
− | | | + | | |
− | | Onsite with Inspector Mark Moreland to witness the cementing of the intermediate casing. H & P had drilled a 17.5 | + | | Onsite with Inspector Mark Moreland to witness the cementing of the intermediate casing. H & P had drilled a 17.5 open hole to a depth of 1926'. They had 1931' of 13 3/8 casing set from the rig floor. Halliburton was onsite to cement this intermediate casing with a class H cement (15.8 ppg; 2.31 yield). Inspector calculations indicate 850 sacks of cement and 292 barrels to displace. Good return were viewed in the cellar. See his report for this date. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1668546082 | ||
+ | | 2014-05-14 | ||
+ | | | ||
+ | | HAD Drilling Rig # 618 drilling at 360 ft and are broke down for repairs. Should be ready to set casing in the morning. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -660688240 | ||
+ | | 2014-07-07 | ||
+ | | | ||
+ | | I am checking on the drilling status of H & P Drilling Rig # 287 and found that they are drilling out from under the intermediate casing section of the well at 2400 ft | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-067-21319 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.23074502,"lon":-81.02367494,"icon":""}]} |
County: Harrison | |
Municipality: | |
Operator Name: HESS OHIO DEVELOPMENTS LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-05-15 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Well Drilled | |
Violations: 0 | |
Latitude: 40.23074502 | |
Longitude: -81.02367494 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1183164642 | 2014-06-12 | I am on site today to witness the running and cementing of the 13-3/8 inch diameter casing string. H &P Drilling Rig # 287 drilled a 17.5 inch diameter hole to 1926 ft and set 1920 ft of casing. Halliburton Energy Cemented with 790 sacks of class H cement at 15.8 lbs and a yield of 2.31 | ||||
1400198475 | 2014-05-15 | Arrive today to witness the running and the cementing of the casing string and found that HAD Drilling is broke down and will be ready at 4 this afternoon. Return at 4pm and found that they still do not have everything fixed and now the cement job will be 7 am Fri morning. | ||||
1400242520 | 2014-05-16 | On arrival on location H A D Drilling was install 18 5/8 casing and preparing to cement. Halliburton Energy Services will cement. Established circulation but did not see cement returns to surface. Going to run bond log and then grout to surface. | ||||
1402606865 | 2014-06-12 | Onsite with Inspector Mark Moreland to witness the cementing of the intermediate casing. H & P had drilled a 17.5 open hole to a depth of 1926'. They had 1931' of 13 3/8 casing set from the rig floor. Halliburton was onsite to cement this intermediate casing with a class H cement (15.8 ppg; 2.31 yield). Inspector calculations indicate 850 sacks of cement and 292 barrels to displace. Good return were viewed in the cellar. See his report for this date. | ||||
-1668546082 | 2014-05-14 | HAD Drilling Rig # 618 drilling at 360 ft and are broke down for repairs. Should be ready to set casing in the morning. | ||||
-660688240 | 2014-07-07 | I am checking on the drilling status of H & P Drilling Rig # 287 and found that they are drilling out from under the intermediate casing section of the well at 2400 ft |
For data sources see[1]