If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-139-20762 | | Well ID: 34-139-20762 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.58718195, -82.56245073 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Richland County, Ohio|Richland]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[BI JOE DEVELOPMENT INC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-06-13 | | Spud Date: 2013-06-13 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.58718195 |
|- | |- | ||
− | | Longitude: -82. | + | | Longitude: -82.56245073 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 83.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 77.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 316.0 | ||
+ | | style="text-align:right;" | 153.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 155.0 | ||
+ | | style="text-align:right;" | 153.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 76: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1371666902 | | 1371666902 | ||
| 2013-06-19 | | 2013-06-19 | ||
− | | | + | | |
| Drilling is at 3070 feet. Drilling on fluid. The driller expects to reach TD on Saturday. | | Drilling is at 3070 feet. Drilling on fluid. The driller expects to reach TD on Saturday. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1372886265 | | 1372886265 | ||
| 2013-07-03 | | 2013-07-03 | ||
− | | | + | | |
| The site needs to be finish graded. The well has been equipped with a pump jack, rods and tubing. The pumper was on location and the well was being pumped into a portable tank. | | The site needs to be finish graded. The well has been equipped with a pump jack, rods and tubing. The pumper was on location and the well was being pumped into a portable tank. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1374076613 | | 1374076613 | ||
| 2013-07-17 | | 2013-07-17 | ||
− | | | + | | |
| R&B and Bakerwell were on site. Baker was setting tanks and working on the dike area. R&B was grading topsoil on the disturbed area. | | R&B and Bakerwell were on site. Baker was setting tanks and working on the dike area. R&B was grading topsoil on the disturbed area. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1376501911 | | 1376501911 | ||
| 2013-08-14 | | 2013-08-14 | ||
− | | | + | | |
| The disturbed area has been seeded and vegetation is established. Tanks are 55 ft from the roadway and 102 feet from the well. Fencing has been placed around the well and tank battery. Gates have been installed on the lease road. ID needs to be posted at the tank battery. Preliminary restoration is approved. | | The disturbed area has been seeded and vegetation is established. Tanks are 55 ft from the roadway and 102 feet from the well. Fencing has been placed around the well and tank battery. Gates have been installed on the lease road. ID needs to be posted at the tank battery. Preliminary restoration is approved. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1603847770 | ||
+ | | 2013-06-24 | ||
+ | | | ||
+ | | Production casing was cemented over the weeekend. Drilling is completed. The rig is being moved out. The pits are going to be solidified and the operator is planning to acidize the well. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -513746705 | ||
+ | | 2013-06-14 | ||
+ | | | ||
+ | | Inspect drill location. Drill 11 inch surface casing hole to 860 feet, set 798 feet measured from grade of 8.625 inch new 23 pound casing. four centralizers set every 5 to 6 joints, total 19 joints of pipe. Cement with 172 sacks of cement with loss circulation material. Good returns. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 658163127 | | 658163127 | ||
| 2014-07-02 | | 2014-07-02 | ||
− | | | + | | |
| The site is 100% vegetated except for the lease road. The road is stable, no erosion. ID posted at the tanks. The well is equipped with a pump jack, rods and tubing and is in production. | | The site is 100% vegetated except for the lease road. The road is stable, no erosion. ID posted at the tanks. The well is equipped with a pump jack, rods and tubing and is in production. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 692241112 | | 692241112 | ||
| 2013-06-28 | | 2013-06-28 | ||
− | | | + | | |
| Request by the well owner to witness acid treatment job on the well. Producers Service Co. supplied and pumped hydrochloric acid. Bakerwell service rig is on site. | | Request by the well owner to witness acid treatment job on the well. Producers Service Co. supplied and pumped hydrochloric acid. Bakerwell service rig is on site. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -838086997 | ||
+ | | 2013-06-26 | ||
+ | | | ||
+ | | Operator advised they would be solidifying and closing pits. Baked lime powder was mixed in to the mud and cuttings in the pits. 2 loads of water were hauled out of pits. Water was pumped down to the level of the mud and an excavator was used to mix in lime. The operator was also grading the site around the well. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 861772080 | | 861772080 | ||
| 2013-06-11 | | 2013-06-11 | ||
− | | | + | | |
| Maric drilling is grading the site. The rig is expeced in 1 to 2 days. | | Maric drilling is grading the site. The rig is expeced in 1 to 2 days. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-139-20762 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.58718195,"lon":-82.56245073,"icon":""}]} |
County: Richland | |
Municipality: | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-06-13 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.58718195 | |
Longitude: -82.56245073 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 83.0 | 77.0 | ||||
2014-0 | 316.0 | 153.0 | 155.0 | 153.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1371666902 | 2013-06-19 | Drilling is at 3070 feet. Drilling on fluid. The driller expects to reach TD on Saturday. | ||||
1372886265 | 2013-07-03 | The site needs to be finish graded. The well has been equipped with a pump jack, rods and tubing. The pumper was on location and the well was being pumped into a portable tank. | ||||
1374076613 | 2013-07-17 | R&B and Bakerwell were on site. Baker was setting tanks and working on the dike area. R&B was grading topsoil on the disturbed area. | ||||
1376501911 | 2013-08-14 | The disturbed area has been seeded and vegetation is established. Tanks are 55 ft from the roadway and 102 feet from the well. Fencing has been placed around the well and tank battery. Gates have been installed on the lease road. ID needs to be posted at the tank battery. Preliminary restoration is approved. | ||||
-1603847770 | 2013-06-24 | Production casing was cemented over the weeekend. Drilling is completed. The rig is being moved out. The pits are going to be solidified and the operator is planning to acidize the well. | ||||
-513746705 | 2013-06-14 | Inspect drill location. Drill 11 inch surface casing hole to 860 feet, set 798 feet measured from grade of 8.625 inch new 23 pound casing. four centralizers set every 5 to 6 joints, total 19 joints of pipe. Cement with 172 sacks of cement with loss circulation material. Good returns. | ||||
658163127 | 2014-07-02 | The site is 100% vegetated except for the lease road. The road is stable, no erosion. ID posted at the tanks. The well is equipped with a pump jack, rods and tubing and is in production. | ||||
692241112 | 2013-06-28 | Request by the well owner to witness acid treatment job on the well. Producers Service Co. supplied and pumped hydrochloric acid. Bakerwell service rig is on site. | ||||
-838086997 | 2013-06-26 | Operator advised they would be solidifying and closing pits. Baked lime powder was mixed in to the mud and cuttings in the pits. 2 loads of water were hauled out of pits. Water was pumped down to the level of the mud and an excavator was used to mix in lime. The operator was also grading the site around the well. | ||||
861772080 | 2013-06-11 | Maric drilling is grading the site. The rig is expeced in 1 to 2 days. |
For data sources see[2]