X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-059-24337"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-059-24337
 
| Well ID: 34-059-24337
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.9782874965, -81.4202493344 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.9782875, -81.42024933 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Guernsey County, Ohio|Guernsey]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[PDC ENERGY INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2014-03-22
 
| Spud Date: 2014-03-22
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.9782874965
+
| Latitude: 39.9782875
 
|-
 
|-
| Longitude: -81.4202493344
+
| Longitude: -81.42024933
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 103781.0
 +
| style="text-align:right;" | 88.0
 +
|
 +
|
 +
| style="text-align:right;" | 28208.0
 +
| style="text-align:right;" | 88.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 16518.0
 +
| style="text-align:right;" | 13.0
 +
|
 +
|
 +
| style="text-align:right;" | 4513.0
 +
| style="text-align:right;" | 13.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1212700983
 +
| 2014-03-25
 +
|
 +
| On the day of my inspection I witnessed that Express Energy Services had drilled a 36 inch diameter hole to the depth of 115 feet and set 115 feet of 30 inch conductor pipe. Express Energy could not get conductor pipe plum. They are pulling pipe back out and will ream hole to 42 inches in diameter and rerun pipe and cement tomorrow.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -175625523
 +
| 2014-09-07
 +
|
 +
| On the day of my inspection I witnessed that the site passed preliminary restoration according to ORC 1509.072A.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -226322298
 
| -226322298
 
| 2014-06-23
 
| 2014-06-23
|
+
|  
 
| On the day of my inspection, I witnessed Universal break circulation with fresh water then mix and displace five hundred forty two barrel of Type-1 cement to a depth of 315 foot, I witnessed 20 barrels of cement returns to surface with a weight of 15.6 and a yield of 1.20. My site inspection revealed no erosion and good vegetation, no spills to report and all fluid storage is setting inside containment.
 
| On the day of my inspection, I witnessed Universal break circulation with fresh water then mix and displace five hundred forty two barrel of Type-1 cement to a depth of 315 foot, I witnessed 20 barrels of cement returns to surface with a weight of 15.6 and a yield of 1.20. My site inspection revealed no erosion and good vegetation, no spills to report and all fluid storage is setting inside containment.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| 1212700983
 
| 2014-03-25
 
|
 
| On the day of my inspection I witnessed that Express Energy Services had drilled a 36 inch diameter hole to the depth of 115 feet and set 115 feet of 30 inch conductor pipe. Express Energy could not get conductor pipe plum. They are pulling pipe back out and will ream hole to 42 inches in diameter and rerun pipe and cement tomorrow.
 
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 22:13, 15 July 2015

Well Details

Well ID: 34-059-24337
Loading map...
County: Guernsey
Municipality:
Operator Name: PDC ENERGY INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-03-22
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.9782875
Longitude: -81.42024933

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2015-1 103781.0 88.0 28208.0 88.0
2014-4 16518.0 13.0 4513.0 13.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1212700983 2014-03-25 On the day of my inspection I witnessed that Express Energy Services had drilled a 36 inch diameter hole to the depth of 115 feet and set 115 feet of 30 inch conductor pipe. Express Energy could not get conductor pipe plum. They are pulling pipe back out and will ream hole to 42 inches in diameter and rerun pipe and cement tomorrow.
-175625523 2014-09-07 On the day of my inspection I witnessed that the site passed preliminary restoration according to ORC 1509.072A.
-226322298 2014-06-23 On the day of my inspection, I witnessed Universal break circulation with fresh water then mix and displace five hundred forty two barrel of Type-1 cement to a depth of 315 foot, I witnessed 20 barrels of cement returns to surface with a weight of 15.6 and a yield of 1.20. My site inspection revealed no erosion and good vegetation, no spills to report and all fluid storage is setting inside containment.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.