| Well ID: 34-155-24076
 
| Well ID: 34-155-24076
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.1954137677, -80.7749712554 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.19541377, -80.77497126 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Trumbull County, Ohio|Trumbull]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[AMERICAN WATER MGMT SERV LLC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-09-13
 
| Spud Date: 2013-09-13
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Active Injection
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.1954137677
+
| Latitude: 41.19541377
 
|-
 
|-
| Longitude: -80.7749712554
+
| Longitude: -80.77497126
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| -100476782
 +
| 2014-11-24
 +
|
 +
| The injection well and surface facility were inspected.  There were no violations found at the time.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1136911182
 
| -1136911182
 
| 2013-09-17
 
| 2013-09-17
|
+
|  
 
| 100 feet of 20 inch diameter conductor was cemented at 95 feet below ground level, using 260 sacks of Class-A cement with 2% CaCl and 1/2 lb./sk. of cellophane flakes.  Cement operation and site conditions were acceptable.
 
| 100 feet of 20 inch diameter conductor was cemented at 95 feet below ground level, using 260 sacks of Class-A cement with 2% CaCl and 1/2 lb./sk. of cellophane flakes.  Cement operation and site conditions were acceptable.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -1373242076
 
| 2014-02-05
 
|
 
| The packer installation was witnessed.  A Baker Lok-set was ran on 4-1/2 inch tubing.
 
|
 
|
 
|
 
|-
 
|-
 
| -1817113630
 
| 2013-10-22
 
|
 
| The cementing of the surface casing was witnessed.  644 feet of 13-3/8 inch casing were cemented with 600 sacks of class A cement.  Good cement return was observed.  Cement operation and site conditions were acceptable.
 
|
 
|
 
|
 
|-
 
|-
 
| -1865546039
 
| 2014-05-14
 
|
 
| The purpose of this inspection was to review the construction of the surface facility.
 
My inspection was accompanied by Tom Tomastik and Andrew Adgate.  We met with Steve Kilper, with American Water Management Services.
 
The surface facility construction was consistent with the facility plan and met all permit specifications.
 
|
 
|
 
|
 
|-
 
|-
 
| -192081232
 
| 2014-06-20
 
|
 
| A mechanical integrity test on the injection line was attempted.  Several fittings leaked, once pressure was placed on the injection line.  The test failed.
 
|
 
|
 
|
 
|-
 
|-
 
| -537140987
 
| 2013-10-18
 
|
 
| The operator was digging the reserve pit.  All conditions were acceptable.
 
|
 
|
 
|
 
|-
 
|-
 
| -614503169
 
| 2014-01-14
 
|
 
| The well owner was staging frac tanks on location.  All conditions were acceptable.
 
|
 
|
 
|
 
|-
 
|-
 
| -797752620
 
| 2014-01-13
 
|
 
| A contractor was cleaning the rig mats.  Construction continues on pump house and unloading sump.  The working pit was mucked out into the reserve pit.  Approximately a third of the pits contained dry off-spec cement.
 
|
 
|
 
|
 
|-
 
|-
 
| -976755355
 
| 2013-11-12
 
|
 
| The drilling rig was moving onto the pad.  All conditions were acceptable.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1255733067
 
| 1255733067
 
| 2013-09-16
 
| 2013-09-16
|
+
|  
 
| The contractor attempted to install 100 feet of conductor.  The bore hole was obstructed.
 
| The contractor attempted to install 100 feet of conductor.  The bore hole was obstructed.
  
 
The bore hole will have to be cleaned-out.
 
The bore hole will have to be cleaned-out.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1310577935
 
| 1310577935
 
| 2014-03-04
 
| 2014-03-04
|
+
|  
 
| Northeast Region Supervisor, UIC Inspector Steve Ochs and myself performed a status check on the above location. Tank pad and tanks are under construction. We walked the location. There were no violations noted at this time.
 
| Northeast Region Supervisor, UIC Inspector Steve Ochs and myself performed a status check on the above location. Tank pad and tanks are under construction. We walked the location. There were no violations noted at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 131260748
 
| 131260748
 
| 2013-09-12
 
| 2013-09-12
|
+
|  
 
| Express Energy Services installed a cellar.  A corrugated culvert, 8 feet deep and 8 feet in diameter, was grouted in place, using a ready mix truck.
 
| Express Energy Services installed a cellar.  A corrugated culvert, 8 feet deep and 8 feet in diameter, was grouted in place, using a ready mix truck.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1373242076
 +
| 2014-02-05
 +
|
 +
| The packer installation was witnessed.  A Baker Lok-set was ran on 4-1/2 inch tubing.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1382439002
 
| 1382439002
 
| 2013-09-13
 
| 2013-09-13
|
+
|  
 
| 40 feet of 30 inch diameter casing was cemented with 8 yards of concrete.  Cement operation and site conditions were acceptable.
 
| 40 feet of 30 inch diameter casing was cemented with 8 yards of concrete.  Cement operation and site conditions were acceptable.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1384787230
 
| 1384787230
 
| 2013-11-15
 
| 2013-11-15
|
+
|  
 
| The rig was drilling surface hole on fluid at 370 feet.  Conditions were acceptable.
 
| The rig was drilling surface hole on fluid at 370 feet.  Conditions were acceptable.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1604560327
 
| 1604560327
 
| 2013-09-17
 
| 2013-09-17
|
+
|  
| I witnessed Express Energy Serviced cement the conductor casing for American Water.  Express drilled a 26" Hole #2 to 100' and set 20" casing at 95'.  Express established circulation and pumped 260 sacks of Class A cement.  The operator displaced the cement to approximately 90' with 32 bbls of fresh water.  I witnessed approximately 50 bbls of good cement returned to surface.  Cement held static at surface after 20 minutes.
+
| I witnessed Express Energy Serviced cement the conductor casing for American Water.  Express drilled a 26 Hole #2 to 100' and set 20 casing at 95'.  Express established circulation and pumped 260 sacks of Class A cement.  The operator displaced the cement to approximately 90' with 32 bbls of fresh water.  I witnessed approximately 50 bbls of good cement returned to surface.  Cement held static at surface after 20 minutes.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1706513039
 
| 1706513039
 
| 2014-02-06
 
| 2014-02-06
|
+
|  
 
| A mechanical integrity test was performed on the well.  1240 psi. of pressure was placed on the tubing/casing annulus.  The test passed.
 
| A mechanical integrity test was performed on the well.  1240 psi. of pressure was placed on the tubing/casing annulus.  The test passed.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1764875238
 
| 1764875238
 
| 2014-04-03
 
| 2014-04-03
|
+
|  
 
| An inspection of the injection facility found no violations.
 
| An inspection of the injection facility found no violations.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1817113630
 +
| 2013-10-22
 +
|
 +
| The cementing of the surface casing was witnessed.  644 feet of 13-3/8 inch casing were cemented with 600 sacks of class A cement.  Good cement return was observed.  Cement operation and site conditions were acceptable.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1846825825
 
| 1846825825
 
| 2013-11-04
 
| 2013-11-04
|
+
|  
 
| The operator was closing the working pits.  The contents were sucked out using a vacuum truck.  The pit liner will be hauled to a land fill.  All conditions were acceptable.
 
| The operator was closing the working pits.  The contents were sucked out using a vacuum truck.  The pit liner will be hauled to a land fill.  All conditions were acceptable.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1865546039
 +
| 2014-05-14
 +
|
 +
| The purpose of this inspection was to review the construction of the surface facility.
 +
My inspection was accompanied by Tom Tomastik and Andrew Adgate.  We met with Steve Kilper, with American Water Management Services.
 +
The surface facility construction was consistent with the facility plan and met all permit specifications.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -192081232
 +
| 2014-06-20
 +
|
 +
| A mechanical integrity test on the injection line was attempted.  Several fittings leaked, once pressure was placed on the injection line.  The test failed.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1993548411
 +
| 2014-07-28
 +
|
 +
| An inspection of the well and injection facility found no violations.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 357311163
 
| 357311163
 
| 2013-10-28
 
| 2013-10-28
|
+
|  
 
| The cementing of an 8-5/8 inch casing was witnessed.  4057 feet of 8-5/8 inch casing was cemented with 1000 sacks of class A cement.  The cement operation and site conditions were acceptable.
 
| The cementing of an 8-5/8 inch casing was witnessed.  4057 feet of 8-5/8 inch casing was cemented with 1000 sacks of class A cement.  The cement operation and site conditions were acceptable.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -537140987
 +
| 2013-10-18
 +
|
 +
| The operator was digging the reserve pit.  All conditions were acceptable.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 602398661
 
| 602398661
 
| 2013-10-17
 
| 2013-10-17
|
+
|  
 
| I was on location with UIC Inspector Steven Ochs to inspect the digging and the construction of the in ground drilling and reserve pits. This location has some construction and slag material buried. The pit will be lined with felt and heavy mill pit liners.
 
| I was on location with UIC Inspector Steven Ochs to inspect the digging and the construction of the in ground drilling and reserve pits. This location has some construction and slag material buried. The pit will be lined with felt and heavy mill pit liners.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -614503169
 +
| 2014-01-14
 +
|
 +
| The well owner was staging frac tanks on location.  All conditions were acceptable.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 782039637
 +
| 2014-11-07
 +
|
 +
| The injection well and surface facility were inspected.  There were no violations found at the time.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -797752620
 +
| 2014-01-13
 +
|
 +
| A contractor was cleaning the rig mats.  Construction continues on pump house and unloading sump.  The working pit was mucked out into the reserve pit.  Approximately a third of the pits contained dry off-spec cement.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -813859798
 +
| 2015-02-13
 +
|
 +
| The injection well and surface facility were inspected.  The annulus was frozen.  There were no violations found at the time.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 902592774
 
| 902592774
 
| 2013-11-19
 
| 2013-11-19
|
+
|  
 
| The drilling rig, currently at 1238 feet, was making a bit trip.  All conditions were acceptable.
 
| The drilling rig, currently at 1238 feet, was making a bit trip.  All conditions were acceptable.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -976755355
 +
| 2013-11-12
 +
|
 +
| The drilling rig was moving onto the pad.  All conditions were acceptable.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 22:04, 15 July 2015

Well Details

Well ID: 34-155-24076
Loading map...
County: Trumbull
Municipality:
Operator Name: AMERICAN WATER MGMT SERV LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-09-13
Unconventional: No
Configuration: Vertical
Well Status: Active Injection
Violations: 0
Latitude: 41.19541377
Longitude: -80.77497126

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-100476782 2014-11-24 The injection well and surface facility were inspected. There were no violations found at the time.
-1136911182 2013-09-17 100 feet of 20 inch diameter conductor was cemented at 95 feet below ground level, using 260 sacks of Class-A cement with 2% CaCl and 1/2 lb./sk. of cellophane flakes. Cement operation and site conditions were acceptable.
1255733067 2013-09-16 The contractor attempted to install 100 feet of conductor. The bore hole was obstructed.

The bore hole will have to be cleaned-out.

1310577935 2014-03-04 Northeast Region Supervisor, UIC Inspector Steve Ochs and myself performed a status check on the above location. Tank pad and tanks are under construction. We walked the location. There were no violations noted at this time.
131260748 2013-09-12 Express Energy Services installed a cellar. A corrugated culvert, 8 feet deep and 8 feet in diameter, was grouted in place, using a ready mix truck.
-1373242076 2014-02-05 The packer installation was witnessed. A Baker Lok-set was ran on 4-1/2 inch tubing.
1382439002 2013-09-13 40 feet of 30 inch diameter casing was cemented with 8 yards of concrete. Cement operation and site conditions were acceptable.
1384787230 2013-11-15 The rig was drilling surface hole on fluid at 370 feet. Conditions were acceptable.
1604560327 2013-09-17 I witnessed Express Energy Serviced cement the conductor casing for American Water. Express drilled a 26 Hole #2 to 100' and set 20 casing at 95'. Express established circulation and pumped 260 sacks of Class A cement. The operator displaced the cement to approximately 90' with 32 bbls of fresh water. I witnessed approximately 50 bbls of good cement returned to surface. Cement held static at surface after 20 minutes.
1706513039 2014-02-06 A mechanical integrity test was performed on the well. 1240 psi. of pressure was placed on the tubing/casing annulus. The test passed.
1764875238 2014-04-03 An inspection of the injection facility found no violations.
-1817113630 2013-10-22 The cementing of the surface casing was witnessed. 644 feet of 13-3/8 inch casing were cemented with 600 sacks of class A cement. Good cement return was observed. Cement operation and site conditions were acceptable.
1846825825 2013-11-04 The operator was closing the working pits. The contents were sucked out using a vacuum truck. The pit liner will be hauled to a land fill. All conditions were acceptable.
-1865546039 2014-05-14 The purpose of this inspection was to review the construction of the surface facility.

My inspection was accompanied by Tom Tomastik and Andrew Adgate. We met with Steve Kilper, with American Water Management Services. The surface facility construction was consistent with the facility plan and met all permit specifications.

-192081232 2014-06-20 A mechanical integrity test on the injection line was attempted. Several fittings leaked, once pressure was placed on the injection line. The test failed.
1993548411 2014-07-28 An inspection of the well and injection facility found no violations.
357311163 2013-10-28 The cementing of an 8-5/8 inch casing was witnessed. 4057 feet of 8-5/8 inch casing was cemented with 1000 sacks of class A cement. The cement operation and site conditions were acceptable.
-537140987 2013-10-18 The operator was digging the reserve pit. All conditions were acceptable.
602398661 2013-10-17 I was on location with UIC Inspector Steven Ochs to inspect the digging and the construction of the in ground drilling and reserve pits. This location has some construction and slag material buried. The pit will be lined with felt and heavy mill pit liners.
-614503169 2014-01-14 The well owner was staging frac tanks on location. All conditions were acceptable.
782039637 2014-11-07 The injection well and surface facility were inspected. There were no violations found at the time.
-797752620 2014-01-13 A contractor was cleaning the rig mats. Construction continues on pump house and unloading sump. The working pit was mucked out into the reserve pit. Approximately a third of the pits contained dry off-spec cement.
-813859798 2015-02-13 The injection well and surface facility were inspected. The annulus was frozen. There were no violations found at the time.
902592774 2013-11-19 The drilling rig, currently at 1238 feet, was making a bit trip. All conditions were acceptable.
-976755355 2013-11-12 The drilling rig was moving onto the pad. All conditions were acceptable.