| Well ID: 34-155-24076 | | Well ID: 34-155-24076 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.19541377, -80.77497126 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Trumbull County, Ohio|Trumbull]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[AMERICAN WATER MGMT SERV LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-09-13 | | Spud Date: 2013-09-13 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Active Injection |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 41. | + | | Latitude: 41.19541377 |
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.77497126 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | -100476782 | ||
+ | | 2014-11-24 | ||
+ | | | ||
+ | | The injection well and surface facility were inspected. There were no violations found at the time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -1136911182 | | -1136911182 | ||
| 2013-09-17 | | 2013-09-17 | ||
− | | | + | | |
| 100 feet of 20 inch diameter conductor was cemented at 95 feet below ground level, using 260 sacks of Class-A cement with 2% CaCl and 1/2 lb./sk. of cellophane flakes. Cement operation and site conditions were acceptable. | | 100 feet of 20 inch diameter conductor was cemented at 95 feet below ground level, using 260 sacks of Class-A cement with 2% CaCl and 1/2 lb./sk. of cellophane flakes. Cement operation and site conditions were acceptable. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 1255733067 | | 1255733067 | ||
| 2013-09-16 | | 2013-09-16 | ||
− | | | + | | |
| The contractor attempted to install 100 feet of conductor. The bore hole was obstructed. | | The contractor attempted to install 100 feet of conductor. The bore hole was obstructed. | ||
The bore hole will have to be cleaned-out. | The bore hole will have to be cleaned-out. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1310577935 | | 1310577935 | ||
| 2014-03-04 | | 2014-03-04 | ||
− | | | + | | |
| Northeast Region Supervisor, UIC Inspector Steve Ochs and myself performed a status check on the above location. Tank pad and tanks are under construction. We walked the location. There were no violations noted at this time. | | Northeast Region Supervisor, UIC Inspector Steve Ochs and myself performed a status check on the above location. Tank pad and tanks are under construction. We walked the location. There were no violations noted at this time. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 131260748 | | 131260748 | ||
| 2013-09-12 | | 2013-09-12 | ||
− | | | + | | |
| Express Energy Services installed a cellar. A corrugated culvert, 8 feet deep and 8 feet in diameter, was grouted in place, using a ready mix truck. | | Express Energy Services installed a cellar. A corrugated culvert, 8 feet deep and 8 feet in diameter, was grouted in place, using a ready mix truck. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1373242076 | ||
+ | | 2014-02-05 | ||
+ | | | ||
+ | | The packer installation was witnessed. A Baker Lok-set was ran on 4-1/2 inch tubing. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1382439002 | | 1382439002 | ||
| 2013-09-13 | | 2013-09-13 | ||
− | | | + | | |
| 40 feet of 30 inch diameter casing was cemented with 8 yards of concrete. Cement operation and site conditions were acceptable. | | 40 feet of 30 inch diameter casing was cemented with 8 yards of concrete. Cement operation and site conditions were acceptable. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1384787230 | | 1384787230 | ||
| 2013-11-15 | | 2013-11-15 | ||
− | | | + | | |
| The rig was drilling surface hole on fluid at 370 feet. Conditions were acceptable. | | The rig was drilling surface hole on fluid at 370 feet. Conditions were acceptable. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1604560327 | | 1604560327 | ||
| 2013-09-17 | | 2013-09-17 | ||
− | | | + | | |
− | | I witnessed Express Energy Serviced cement the conductor casing for American Water. Express drilled a 26 | + | | I witnessed Express Energy Serviced cement the conductor casing for American Water. Express drilled a 26 Hole #2 to 100' and set 20 casing at 95'. Express established circulation and pumped 260 sacks of Class A cement. The operator displaced the cement to approximately 90' with 32 bbls of fresh water. I witnessed approximately 50 bbls of good cement returned to surface. Cement held static at surface after 20 minutes. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1706513039 | | 1706513039 | ||
| 2014-02-06 | | 2014-02-06 | ||
− | | | + | | |
| A mechanical integrity test was performed on the well. 1240 psi. of pressure was placed on the tubing/casing annulus. The test passed. | | A mechanical integrity test was performed on the well. 1240 psi. of pressure was placed on the tubing/casing annulus. The test passed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1764875238 | | 1764875238 | ||
| 2014-04-03 | | 2014-04-03 | ||
− | | | + | | |
| An inspection of the injection facility found no violations. | | An inspection of the injection facility found no violations. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1817113630 | ||
+ | | 2013-10-22 | ||
+ | | | ||
+ | | The cementing of the surface casing was witnessed. 644 feet of 13-3/8 inch casing were cemented with 600 sacks of class A cement. Good cement return was observed. Cement operation and site conditions were acceptable. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 1846825825 | | 1846825825 | ||
| 2013-11-04 | | 2013-11-04 | ||
− | | | + | | |
| The operator was closing the working pits. The contents were sucked out using a vacuum truck. The pit liner will be hauled to a land fill. All conditions were acceptable. | | The operator was closing the working pits. The contents were sucked out using a vacuum truck. The pit liner will be hauled to a land fill. All conditions were acceptable. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1865546039 | ||
+ | | 2014-05-14 | ||
+ | | | ||
+ | | The purpose of this inspection was to review the construction of the surface facility. | ||
+ | My inspection was accompanied by Tom Tomastik and Andrew Adgate. We met with Steve Kilper, with American Water Management Services. | ||
+ | The surface facility construction was consistent with the facility plan and met all permit specifications. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -192081232 | ||
+ | | 2014-06-20 | ||
+ | | | ||
+ | | A mechanical integrity test on the injection line was attempted. Several fittings leaked, once pressure was placed on the injection line. The test failed. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1993548411 | ||
+ | | 2014-07-28 | ||
+ | | | ||
+ | | An inspection of the well and injection facility found no violations. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 357311163 | | 357311163 | ||
| 2013-10-28 | | 2013-10-28 | ||
− | | | + | | |
| The cementing of an 8-5/8 inch casing was witnessed. 4057 feet of 8-5/8 inch casing was cemented with 1000 sacks of class A cement. The cement operation and site conditions were acceptable. | | The cementing of an 8-5/8 inch casing was witnessed. 4057 feet of 8-5/8 inch casing was cemented with 1000 sacks of class A cement. The cement operation and site conditions were acceptable. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -537140987 | ||
+ | | 2013-10-18 | ||
+ | | | ||
+ | | The operator was digging the reserve pit. All conditions were acceptable. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 602398661 | | 602398661 | ||
| 2013-10-17 | | 2013-10-17 | ||
− | | | + | | |
| I was on location with UIC Inspector Steven Ochs to inspect the digging and the construction of the in ground drilling and reserve pits. This location has some construction and slag material buried. The pit will be lined with felt and heavy mill pit liners. | | I was on location with UIC Inspector Steven Ochs to inspect the digging and the construction of the in ground drilling and reserve pits. This location has some construction and slag material buried. The pit will be lined with felt and heavy mill pit liners. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -614503169 | ||
+ | | 2014-01-14 | ||
+ | | | ||
+ | | The well owner was staging frac tanks on location. All conditions were acceptable. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 782039637 | ||
+ | | 2014-11-07 | ||
+ | | | ||
+ | | The injection well and surface facility were inspected. There were no violations found at the time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -797752620 | ||
+ | | 2014-01-13 | ||
+ | | | ||
+ | | A contractor was cleaning the rig mats. Construction continues on pump house and unloading sump. The working pit was mucked out into the reserve pit. Approximately a third of the pits contained dry off-spec cement. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -813859798 | ||
+ | | 2015-02-13 | ||
+ | | | ||
+ | | The injection well and surface facility were inspected. The annulus was frozen. There were no violations found at the time. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| 902592774 | | 902592774 | ||
| 2013-11-19 | | 2013-11-19 | ||
− | | | + | | |
| The drilling rig, currently at 1238 feet, was making a bit trip. All conditions were acceptable. | | The drilling rig, currently at 1238 feet, was making a bit trip. All conditions were acceptable. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -976755355 | ||
+ | | 2013-11-12 | ||
+ | | | ||
+ | | The drilling rig was moving onto the pad. All conditions were acceptable. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-155-24076 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.19541377,"lon":-80.77497126,"icon":""}]} |
County: Trumbull | |
Municipality: | |
Operator Name: AMERICAN WATER MGMT SERV LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-09-13 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Active Injection | |
Violations: 0 | |
Latitude: 41.19541377 | |
Longitude: -80.77497126 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-100476782 | 2014-11-24 | The injection well and surface facility were inspected. There were no violations found at the time. | ||||
-1136911182 | 2013-09-17 | 100 feet of 20 inch diameter conductor was cemented at 95 feet below ground level, using 260 sacks of Class-A cement with 2% CaCl and 1/2 lb./sk. of cellophane flakes. Cement operation and site conditions were acceptable. | ||||
1255733067 | 2013-09-16 | The contractor attempted to install 100 feet of conductor. The bore hole was obstructed.
The bore hole will have to be cleaned-out. |
||||
1310577935 | 2014-03-04 | Northeast Region Supervisor, UIC Inspector Steve Ochs and myself performed a status check on the above location. Tank pad and tanks are under construction. We walked the location. There were no violations noted at this time. | ||||
131260748 | 2013-09-12 | Express Energy Services installed a cellar. A corrugated culvert, 8 feet deep and 8 feet in diameter, was grouted in place, using a ready mix truck. | ||||
-1373242076 | 2014-02-05 | The packer installation was witnessed. A Baker Lok-set was ran on 4-1/2 inch tubing. | ||||
1382439002 | 2013-09-13 | 40 feet of 30 inch diameter casing was cemented with 8 yards of concrete. Cement operation and site conditions were acceptable. | ||||
1384787230 | 2013-11-15 | The rig was drilling surface hole on fluid at 370 feet. Conditions were acceptable. | ||||
1604560327 | 2013-09-17 | I witnessed Express Energy Serviced cement the conductor casing for American Water. Express drilled a 26 Hole #2 to 100' and set 20 casing at 95'. Express established circulation and pumped 260 sacks of Class A cement. The operator displaced the cement to approximately 90' with 32 bbls of fresh water. I witnessed approximately 50 bbls of good cement returned to surface. Cement held static at surface after 20 minutes. | ||||
1706513039 | 2014-02-06 | A mechanical integrity test was performed on the well. 1240 psi. of pressure was placed on the tubing/casing annulus. The test passed. | ||||
1764875238 | 2014-04-03 | An inspection of the injection facility found no violations. | ||||
-1817113630 | 2013-10-22 | The cementing of the surface casing was witnessed. 644 feet of 13-3/8 inch casing were cemented with 600 sacks of class A cement. Good cement return was observed. Cement operation and site conditions were acceptable. | ||||
1846825825 | 2013-11-04 | The operator was closing the working pits. The contents were sucked out using a vacuum truck. The pit liner will be hauled to a land fill. All conditions were acceptable. | ||||
-1865546039 | 2014-05-14 | The purpose of this inspection was to review the construction of the surface facility.
My inspection was accompanied by Tom Tomastik and Andrew Adgate. We met with Steve Kilper, with American Water Management Services. The surface facility construction was consistent with the facility plan and met all permit specifications. |
||||
-192081232 | 2014-06-20 | A mechanical integrity test on the injection line was attempted. Several fittings leaked, once pressure was placed on the injection line. The test failed. | ||||
1993548411 | 2014-07-28 | An inspection of the well and injection facility found no violations. | ||||
357311163 | 2013-10-28 | The cementing of an 8-5/8 inch casing was witnessed. 4057 feet of 8-5/8 inch casing was cemented with 1000 sacks of class A cement. The cement operation and site conditions were acceptable. | ||||
-537140987 | 2013-10-18 | The operator was digging the reserve pit. All conditions were acceptable. | ||||
602398661 | 2013-10-17 | I was on location with UIC Inspector Steven Ochs to inspect the digging and the construction of the in ground drilling and reserve pits. This location has some construction and slag material buried. The pit will be lined with felt and heavy mill pit liners. | ||||
-614503169 | 2014-01-14 | The well owner was staging frac tanks on location. All conditions were acceptable. | ||||
782039637 | 2014-11-07 | The injection well and surface facility were inspected. There were no violations found at the time. | ||||
-797752620 | 2014-01-13 | A contractor was cleaning the rig mats. Construction continues on pump house and unloading sump. The working pit was mucked out into the reserve pit. Approximately a third of the pits contained dry off-spec cement. | ||||
-813859798 | 2015-02-13 | The injection well and surface facility were inspected. The annulus was frozen. There were no violations found at the time. | ||||
902592774 | 2013-11-19 | The drilling rig, currently at 1238 feet, was making a bit trip. All conditions were acceptable. | ||||
-976755355 | 2013-11-12 | The drilling rig was moving onto the pad. All conditions were acceptable. |