X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-151-25690"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-151-25690
 
| Well ID: 34-151-25690
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.8292075947, -81.5008960874 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.82912243, -81.50106899 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Stark County, Ohio|Stark]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[OHIO VALLEY ENERGY SYSTEM CORP]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2011-01-19
 
| Spud Date: 2011-01-19
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.8292075947
+
| Latitude: 40.82912243
 
|-
 
|-
| Longitude: -81.5008960874
+
| Longitude: -81.50106899
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 6992.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 29694.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 43165.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 87.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 35217.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 79.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 94:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1086695104
 
| -1086695104
 
| 2011-03-01
 
| 2011-03-01
|
+
|  
 
| Training for Ray Wallace on well construction
 
| Training for Ray Wallace on well construction
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -332653707
 
| 2012-01-09
 
|
 
| On 1/9/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Reatoration is PASSED.
 
|
 
|
 
|
 
|-
 
|-
 
| -472226251
 
| 2011-03-01
 
|
 
| Producers Services Corporation (PSC) fraced the well today. I witnessed the entire job with Rick Liddle (OVE), Ray Wallace (ODNR), and Chris Grimm (ODNR). Breakdown Pressure 1330 psi. Average Treating Pressure 37 bpm at 1742 psi. Total Fluid Volume 112,063 gals. Total Sand 788 sacks. Flush 12,061 gals. Instant Shut In (ISI) 1123 psi. After 5 min. 1100 psi. Hydraulic Horse Power (HHP) 1580. The job was completed with no problems.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1297789016
 
| 1297789016
 
| 2011-02-14
 
| 2011-02-14
|
+
|  
 
| Solidifying the drilling pits today.
 
| Solidifying the drilling pits today.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1299521629
 
| 1299521629
 
| 2011-01-20
 
| 2011-01-20
|
+
|  
 
| Training Ray Wallace Surface cement job.
 
| Training Ray Wallace Surface cement job.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 282299046
 
| 282299046
 
| 2011-04-28
 
| 2011-04-28
|
+
|  
 
| The well is completed and the tank battery is set. The location is rough graded.
 
| The well is completed and the tank battery is set. The location is rough graded.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -332653707
 +
| 2012-01-09
 +
|
 +
| On 1/9/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Reatoration is PASSED.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -472226251
 +
| 2011-03-01
 +
|
 +
| Producers Services Corporation (PSC) fraced the well today. I witnessed the entire job with Rick Liddle (OVE), Ray Wallace (ODNR), and Chris Grimm (ODNR). Breakdown Pressure 1330 psi. Average Treating Pressure 37 bpm at 1742 psi. Total Fluid Volume 112,063 gals. Total Sand 788 sacks. Flush 12,061 gals. Instant Shut In (ISI) 1123 psi. After 5 min. 1100 psi. Hydraulic Horse Power (HHP) 1580. The job was completed with no problems.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 01:42, 16 July 2015

Well Details

Well ID: 34-151-25690
Loading map...
County: Stark
Municipality:
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-01-19
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.82912243
Longitude: -81.50106899

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 6992.0 0.0
2012-0 29694.0 0.0
2013-0 43165.0 87.0
2014-0 35217.0 365.0 79.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1086695104 2011-03-01 Training for Ray Wallace on well construction
1297789016 2011-02-14 Solidifying the drilling pits today.
1299521629 2011-01-20 Training Ray Wallace Surface cement job.
282299046 2011-04-28 The well is completed and the tank battery is set. The location is rough graded.
-332653707 2012-01-09 On 1/9/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Reatoration is PASSED.
-472226251 2011-03-01 Producers Services Corporation (PSC) fraced the well today. I witnessed the entire job with Rick Liddle (OVE), Ray Wallace (ODNR), and Chris Grimm (ODNR). Breakdown Pressure 1330 psi. Average Treating Pressure 37 bpm at 1742 psi. Total Fluid Volume 112,063 gals. Total Sand 788 sacks. Flush 12,061 gals. Instant Shut In (ISI) 1123 psi. After 5 min. 1100 psi. Hydraulic Horse Power (HHP) 1580. The job was completed with no problems.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.