X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-085-21297"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-085-21297
 
| Well ID: 34-085-21297
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.6691371974, -81.4317308069 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.66910367, -81.43211462 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Lake County, Ohio|Lake]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[PETRO EVALUATION SERV INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2009-07-16
 
| Spud Date: 2009-07-16
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
| Violations: 2
+
| Violations: 0
 
|-
 
|-
| Latitude: 41.6691371974
+
| Latitude: 41.66910367
 
|-
 
|-
| Longitude: -81.4317308069
+
| Longitude: -81.43211462
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2009-0
 +
| style="text-align:right;" | 1829.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 23.0
 +
|
 +
|-
 +
|-
 +
| 2010-0
 +
| style="text-align:right;" | 10100.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 97.0
 +
|
 +
|-
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 4718.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 40.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 3436.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 95.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 2608.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 56.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 1633.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 112:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1023024896
 
| -1023024896
 
| 2012-03-14
 
| 2012-03-14
|
+
|  
 
| The well is equipped with a pumping unitand the annulus needs opened or a pop-off valve installed.  The tank battery is equipped with two 100 barrel production tanks, one poly brine tank and a mechanical separator.  The load line needs a plug.  The dike needs repaired where the flow line comes into it.  The man doors were locked.
 
| The well is equipped with a pumping unitand the annulus needs opened or a pop-off valve installed.  The tank battery is equipped with two 100 barrel production tanks, one poly brine tank and a mechanical separator.  The load line needs a plug.  The dike needs repaired where the flow line comes into it.  The man doors were locked.
|
+
|  
|
+
|  
|
+
| Phone Call
|-
 
|-
 
| -1982727777
 
| 2010-01-21
 
|
 
| There were no violations at the time of inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| -414936960
 
| 2009-09-16
 
|
 
| Pits were properly closed.  Site conditions were satisfactory.
 
|
 
|
 
|
 
|-
 
|-
 
| -432469058
 
| 2009-07-23
 
|
 
| inspected site no Violation.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1312289714
 
| 1312289714
 
| 2011-08-02
 
| 2011-08-02
|
+
|  
 
| Fencing, dike, and spacing in compliance. Vent hatches installed and closed. Feed lines are bullplugged. Lightning arrestor and charcoal filter not installed. Gate at tank battery is not locked. Contacted John Braun of Petro Evaluation (440) 862-0492 regarding the issues. He stated he would contact the office and take care of the issues.
 
| Fencing, dike, and spacing in compliance. Vent hatches installed and closed. Feed lines are bullplugged. Lightning arrestor and charcoal filter not installed. Gate at tank battery is not locked. Contacted John Braun of Petro Evaluation (440) 862-0492 regarding the issues. He stated he would contact the office and take care of the issues.
|
+
|  
| 9-05E3
+
|  
|
+
|  
|-
 
|-
 
| 1312289714
 
| 2011-08-02
 
|
 
| Fencing, dike, and spacing in compliance. Vent hatches installed and closed. Feed lines are bullplugged. Lightning arrestor and charcoal filter not installed. Gate at tank battery is not locked. Contacted John Braun of Petro Evaluation (440) 862-0492 regarding the issues. He stated he would contact the office and take care of the issues.
 
|
 
| 9-9-02
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1383074930
 
| 1383074930
 
| 2013-10-29
 
| 2013-10-29
|
+
|  
 
| Addition of process safety equipment has been completed. No further problems or action needed at this time.
 
| Addition of process safety equipment has been completed. No further problems or action needed at this time.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1982727777
 +
| 2010-01-21
 +
|
 +
| There were no violations at the time of inspection.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 2132612348
 
| 2132612348
 
| 2012-10-04
 
| 2012-10-04
|
+
|  
 
| The unit consists of a 2-tank battery with mechanical separator enclosed in a 8-foot board fence. The spacing is in accordance with the rule, and the valving and mechanicals are in good repair. I did not observe any signs of leaking product or gas vapors.  The wellhead is fitted with a pump jack and is located in a separate gated 8-foot board enclosure. The gates on the enclosures are  locked. The tank battery dike is adequate. No violations noted.
 
| The unit consists of a 2-tank battery with mechanical separator enclosed in a 8-foot board fence. The spacing is in accordance with the rule, and the valving and mechanicals are in good repair. I did not observe any signs of leaking product or gas vapors.  The wellhead is fitted with a pump jack and is located in a separate gated 8-foot board enclosure. The gates on the enclosures are  locked. The tank battery dike is adequate. No violations noted.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 314999782
 
| 314999782
 
| 2009-07-22
 
| 2009-07-22
|
+
|  
 
| rig drilling 1275' in complance.
 
| rig drilling 1275' in complance.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -414936960
 +
| 2009-09-16
 +
|
 +
| Pits were properly closed.  Site conditions were satisfactory.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -432469058
 +
| 2009-07-23
 +
|
 +
| inspected site no Violation.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 832537890
 
| 832537890
 
| 2009-07-20
 
| 2009-07-20
|
+
|  
| setting surface 8 5/8"
+
| setting surface 8 5/8
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 952082007
 +
| 2015-02-25
 +
|
 +
| I inspected this well as part of routine inspection activity. The wellhead and battery are located along the west banks of the Chagrin River in a mostly industrial area of Eastlake.  The wellhead pump jack and battery are in separate board-on-board enclosures. The gates are locked. Load lines are secure.  Fittings and connections at the wellhead and battery are secure.  12 to 15 inches of snow cover obscures some surficial features and areas.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 01:55, 16 July 2015

Well Details

Well ID: 34-085-21297
Loading map...
County: Lake
Municipality:
Operator Name: PETRO EVALUATION SERV INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2009-07-16
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.66910367
Longitude: -81.43211462

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2009-0 1829.0 23.0
2010-0 10100.0 97.0
2011-0 4718.0 40.0
2012-0 3436.0 95.0
2013-0 2608.0 56.0
2014-0 1633.0 365.0 0.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1023024896 2012-03-14 The well is equipped with a pumping unitand the annulus needs opened or a pop-off valve installed. The tank battery is equipped with two 100 barrel production tanks, one poly brine tank and a mechanical separator. The load line needs a plug. The dike needs repaired where the flow line comes into it. The man doors were locked. Phone Call
1312289714 2011-08-02 Fencing, dike, and spacing in compliance. Vent hatches installed and closed. Feed lines are bullplugged. Lightning arrestor and charcoal filter not installed. Gate at tank battery is not locked. Contacted John Braun of Petro Evaluation (440) 862-0492 regarding the issues. He stated he would contact the office and take care of the issues.
1383074930 2013-10-29 Addition of process safety equipment has been completed. No further problems or action needed at this time.
-1982727777 2010-01-21 There were no violations at the time of inspection.
2132612348 2012-10-04 The unit consists of a 2-tank battery with mechanical separator enclosed in a 8-foot board fence. The spacing is in accordance with the rule, and the valving and mechanicals are in good repair. I did not observe any signs of leaking product or gas vapors. The wellhead is fitted with a pump jack and is located in a separate gated 8-foot board enclosure. The gates on the enclosures are locked. The tank battery dike is adequate. No violations noted.
314999782 2009-07-22 rig drilling 1275' in complance.
-414936960 2009-09-16 Pits were properly closed. Site conditions were satisfactory.
-432469058 2009-07-23 inspected site no Violation.
832537890 2009-07-20 setting surface 8 5/8
952082007 2015-02-25 I inspected this well as part of routine inspection activity. The wellhead and battery are located along the west banks of the Chagrin River in a mostly industrial area of Eastlake. The wellhead pump jack and battery are in separate board-on-board enclosures. The gates are locked. Load lines are secure. Fittings and connections at the wellhead and battery are secure. 12 to 15 inches of snow cover obscures some surficial features and areas.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.