X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-067-21141"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-067-21141
 
| Well ID: 34-067-21141
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.1734145588, -81.2268336931 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.17341456, -81.22683369 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Harrison County, Ohio|Harrison]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-03-05
 
| Spud Date: 2013-03-05
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.1734145588
+
| Latitude: 40.17341456
 
|-
 
|-
| Longitude: -81.2268336931
+
| Longitude: -81.22683369
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-12
 +
| style="text-align:right;" | 171489.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 18299.0
 +
|
 +
|-
 +
|-
 +
| 2013-9
 +
| style="text-align:right;" | 70720.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 9939.0
 +
|
 +
|-
 +
|-
 +
| 2014-3
 +
| style="text-align:right;" | 80434.0
 +
| style="text-align:right;" | 92.0
 +
|
 +
|
 +
| style="text-align:right;" | 6069.0
 +
| style="text-align:right;" | 92.0
 +
|-
 +
|-
 +
| 2014-1
 +
| style="text-align:right;" | 120695.0
 +
| style="text-align:right;" | 84.0
 +
|
 +
|
 +
| style="text-align:right;" | 8235.0
 +
| style="text-align:right;" | 84.0
 +
|-
 +
|-
 +
| 2014-2
 +
| style="text-align:right;" | 89983.0
 +
| style="text-align:right;" | 78.0
 +
|
 +
|
 +
| style="text-align:right;" | 7626.0
 +
| style="text-align:right;" | 78.0
 +
|-
 +
|-
 +
| 2014-4
 +
| style="text-align:right;" | 65266.0
 +
| style="text-align:right;" | 88.0
 +
|
 +
|
 +
| style="text-align:right;" | 2088.0
 +
| style="text-align:right;" | 88.0
 +
|-
 +
|-
 +
| 2015-1
 +
| style="text-align:right;" | 45863.0
 +
| style="text-align:right;" | 78.0
 +
|
 +
|
 +
| style="text-align:right;" | 2102.0
 +
| style="text-align:right;" | 78.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 121:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| -1168181237
 
| -1168181237
 
| 2013-10-15
 
| 2013-10-15
|
+
|  
 
| The site passed preliminary restoration according to 1509.072A.
 
| The site passed preliminary restoration according to 1509.072A.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -19283136
 
| 2013-03-07
 
|
 
| Stringray Cementing cemented 115' of 26" casing with 250Sacks of Class A cement.  See the Casing Ticket for more information.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1364308472
 
| 1364308472
 
| 2013-03-26
 
| 2013-03-26
|
+
|  
| I am on site today to witness the running and cementing of the 13-3/8" inch casing string. Yost Drilling Rig # 7 has drilled a 17.5"inch diameter hole to 1762 ft. and set 1722 ft of casing. Stingray Cementing service c/w 1390 sks of class A 15.6 lb cement. I witnessed 25 bbls of good cement returns to surface.
+
| I am on site today to witness the running and cementing of the 13-3/8 inch casing string. Yost Drilling Rig # 7 has drilled a 17.5inch diameter hole to 1762 ft. and set 1722 ft of casing. Stingray Cementing service c/w 1390 sks of class A 15.6 lb cement. I witnessed 25 bbls of good cement returns to surface.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1364309314
 
| 1364309314
 
| 2013-03-22
 
| 2013-03-22
|
+
|  
 
| On the day of my inspection I covered a surface job. 18.625 casing was ran and cemented with good cement returns. See cement ticket for details. No violations noted.
 
| On the day of my inspection I covered a surface job. 18.625 casing was ran and cemented with good cement returns. See cement ticket for details. No violations noted.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1366824737
 
| 1366824737
 
| 2013-04-24
 
| 2013-04-24
|
+
|  
| I am on site today to plug the 12-1/4" inch diameter section of the well back. Schlumberger Cementing is plugging back today from 6977 ft in 500 ft stages. 6977 ft to 6477 ft pull up 500 ft. 2 nd plug from 5977 ft to 5477 ft then pull up again 500 ft. 3 rd plug from 4977 ft to 4477 ft pull up 500 ft. Set 4 th plug from 3700 ft to 3277 ft. Shut in for 24 hours. Then Sidewinder M- 60 will re-drill this same section and try to keep from going outside the Hardline or drill corridor.
+
| I am on site today to plug the 12-1/4 inch diameter section of the well back. Schlumberger Cementing is plugging back today from 6977 ft in 500 ft stages. 6977 ft to 6477 ft pull up 500 ft. 2 nd plug from 5977 ft to 5477 ft then pull up again 500 ft. 3 rd plug from 4977 ft to 4477 ft pull up 500 ft. Set 4 th plug from 3700 ft to 3277 ft. Shut in for 24 hours. Then Sidewinder M- 60 will re-drill this same section and try to keep from going outside the Hardline or drill corridor.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -19283136
 +
| 2013-03-07
 +
|
 +
| Stringray Cementing cemented 115' of 26 casing with 250Sacks of Class A cement.  See the Casing Ticket for more information.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 985016475
 
| 985016475
 
| 2013-03-29
 
| 2013-03-29
|
+
|  
| On the day of my inspection I picked up a cement ticket from previously witnessed 18.625" casing job. Mark Moreland was present to witness 13.375" cement job. No violations noted.
+
| On the day of my inspection I picked up a cement ticket from previously witnessed 18.625 casing job. Mark Moreland was present to witness 13.375 cement job. No violations noted.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 04:51, 16 July 2015

Well Details

Well ID: 34-067-21141
Loading map...
County: Harrison
Municipality:
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-03-05
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 40.17341456
Longitude: -81.22683369

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-12 171489.0 18299.0
2013-9 70720.0 9939.0
2014-3 80434.0 92.0 6069.0 92.0
2014-1 120695.0 84.0 8235.0 84.0
2014-2 89983.0 78.0 7626.0 78.0
2014-4 65266.0 88.0 2088.0 88.0
2015-1 45863.0 78.0 2102.0 78.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1168181237 2013-10-15 The site passed preliminary restoration according to 1509.072A.
1364308472 2013-03-26 I am on site today to witness the running and cementing of the 13-3/8 inch casing string. Yost Drilling Rig # 7 has drilled a 17.5inch diameter hole to 1762 ft. and set 1722 ft of casing. Stingray Cementing service c/w 1390 sks of class A 15.6 lb cement. I witnessed 25 bbls of good cement returns to surface.
1364309314 2013-03-22 On the day of my inspection I covered a surface job. 18.625 casing was ran and cemented with good cement returns. See cement ticket for details. No violations noted.
1366824737 2013-04-24 I am on site today to plug the 12-1/4 inch diameter section of the well back. Schlumberger Cementing is plugging back today from 6977 ft in 500 ft stages. 6977 ft to 6477 ft pull up 500 ft. 2 nd plug from 5977 ft to 5477 ft then pull up again 500 ft. 3 rd plug from 4977 ft to 4477 ft pull up 500 ft. Set 4 th plug from 3700 ft to 3277 ft. Shut in for 24 hours. Then Sidewinder M- 60 will re-drill this same section and try to keep from going outside the Hardline or drill corridor.
-19283136 2013-03-07 Stringray Cementing cemented 115' of 26 casing with 250Sacks of Class A cement. See the Casing Ticket for more information.
985016475 2013-03-29 On the day of my inspection I picked up a cement ticket from previously witnessed 18.625 casing job. Mark Moreland was present to witness 13.375 cement job. No violations noted.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.