X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-013-20768"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-013-20768
 
| Well ID: 34-013-20768
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.8641388474, -80.8614267996 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.86413885, -80.8614268 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Belmont County, Ohio|Belmont]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[XTO ENERGY INC.]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date: 2014-05-29
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing:
+
| Well Status: Well Drilled
 
|-
 
|-
| Violations: 1
+
| Violations: 0
 
|-
 
|-
| Latitude: 39.8641388474
+
| Latitude: 39.86413885
 
|-
 
|-
| Longitude: -80.8614267996
+
| Longitude: -80.8614268
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1402020046
 +
| 2014-06-05
 +
|
 +
| First Class drilling rig set 70' of 30''conductor. They drilled to total depth of 431' of 22''open hole. They ran 411' of  18.625''casing at 87.5 lb/ft. They ran a guide shoe and three centrilizers at 1st, 4th and 7th joint. The job circulated good and pumped 58 barrel of slurry returns. Cementers were Baker Hughes. They ran 532 sacks of Class A cement at 3%CaCl and .25lb of celloflake per sack. Paul Hahn was point of contact for XTO Company.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1456513410
 +
| 2015-01-22
 +
|
 +
| The preliminary restoration for this well is completed. The pad is in satisfactory condition with proper erosion and sedimentation controls in place. Company shall continue to monitor the location to ensure the pad remains in satisfactory condition. Preliminary restoration passed.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1655549410
 
| -1655549410
 
| 2014-08-04
 
| 2014-08-04
|
+
|  
 
+
| On the day of my inspection Sidewinder Rig 8 was not in operation due to maintenance. During my visit I was investigating a vegetative stressed area that I was notified about via phone by the company. Upon arrival, the area of impacted had an estimated disturbance of 3
|
+
|
| 9-1-07
+
|
|
+
|  
 +
|-
 +
|-
 +
| 620076983
 +
| 2014-05-30
 +
|
 +
| On this day the 30 casing was cemented in a 36 open hole to a depth of 70'. Universal ran 200 sks of class A cement with cement to surface established. See cement ticket for details. No violations noted.
 +
|
 +
|
 +
|  
 
|-
 
|-
 
|-
 
|-
| 1402020046
+
| -949256916
| 2014-06-05
+
| 2014-07-06
|
+
|  
| First Class drilling rig set 70' of 30''conductor. They drilled to total depth of 431' of 22''open hole. They ran 411' of  18.625''casing at 87.5 lb/ft. They ran a guide shoe and three centrilizers at 1st, 4th and 7th joint. The job circulated good and pumped 58 barrel of slurry returns. Cementers were Baker Hughes. They ran 532 sacks of Class A cement at 3%CaCl and .25lb of celloflake per sack. Paul Hahn was point of contact for XTO Company.
+
| On this day the 13.375 casing was cemented in a 17.5 open hole to a depth of 2061'. Baker ran 1558 sks of class A cement with cement to surface established. See cement ticket for details. No violations noted.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 06:34, 16 July 2015

Well Details

Well ID: 34-013-20768
Loading map...
County: Belmont
Municipality:
Operator Name: XTO ENERGY INC.
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-05-29
Unconventional: No
Configuration: Vertical
Well Status: Well Drilled
Violations: 0
Latitude: 39.86413885
Longitude: -80.8614268

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1402020046 2014-06-05 First Class drilling rig set 70' of 30conductor. They drilled to total depth of 431' of 22open hole. They ran 411' of 18.625casing at 87.5 lb/ft. They ran a guide shoe and three centrilizers at 1st, 4th and 7th joint. The job circulated good and pumped 58 barrel of slurry returns. Cementers were Baker Hughes. They ran 532 sacks of Class A cement at 3%CaCl and .25lb of celloflake per sack. Paul Hahn was point of contact for XTO Company.
-1456513410 2015-01-22 The preliminary restoration for this well is completed. The pad is in satisfactory condition with proper erosion and sedimentation controls in place. Company shall continue to monitor the location to ensure the pad remains in satisfactory condition. Preliminary restoration passed.
-1655549410 2014-08-04 On the day of my inspection Sidewinder Rig 8 was not in operation due to maintenance. During my visit I was investigating a vegetative stressed area that I was notified about via phone by the company. Upon arrival, the area of impacted had an estimated disturbance of 3
620076983 2014-05-30 On this day the 30 casing was cemented in a 36 open hole to a depth of 70'. Universal ran 200 sks of class A cement with cement to surface established. See cement ticket for details. No violations noted.
-949256916 2014-07-06 On this day the 13.375 casing was cemented in a 17.5 open hole to a depth of 2061'. Baker ran 1558 sks of class A cement with cement to surface established. See cement ticket for details. No violations noted.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.