X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-167-20796"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-167-20796
 
| Well ID: 34-167-20796
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.5240533881, -81.1173846894 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.52390527, -81.11771673 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Washington County, Ohio|Washington]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[VALENTINE OIL CO P & D]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 1948-05-18
 
| Spud Date: 1948-05-18
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
| Violations: 8
+
| Violations: 0
 
|-
 
|-
| Latitude: 39.5240533881
+
| Latitude: 39.52390527
 
|-
 
|-
| Longitude: -81.1173846894
+
| Longitude: -81.11771673
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | INSPECTION ID
 
!scope="col" | DATE
 
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
| -1327395895
+
| 1997-0
| 2004-05-26
+
| style="text-align:right;" | 0.0
|
+
|
| Talked with Valentine and he is having trouble getting landowner to let him on property, so I called landowner (Stonerock) to discuss problem. He has agreed to give Paul a "short term lease" until Paul proves his intent - am continuing to work on solution to this NOV
+
|
|
+
|
|
+
| style="text-align:right;" | 10.0
|
+
|
 +
|-
 +
|-
 +
| 1998-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 1999-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2005-0
 +
| style="text-align:right;" | 8.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|
 +
|-
 +
|-
 +
| 2006-0
 +
| style="text-align:right;" | 20.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 10.0
 +
|
 +
|-
 +
|-
 +
| 2007-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 32.0
 +
|
 +
|-
 +
|-
 +
| 2008-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 0.0
 +
|  
 
|-
 
|-
 
|-
 
|-
| -1666124760
+
| 2009-0
| 2009-07-27
+
| style="text-align:right;" | 0.0
|
+
|  
| Oil spill found this day on Tom Stonerock's ground.  Flow line to tank has come loose, has been floppying around in the air as well flows gas.  Ground saturated with oil covering an area 100 x 200' around the tank and well.  Kink in plastic line finally cut off flow and stopped further damage.  Could have happened several months ago as owner not pumping well regularly.  He was told to move tank several months ago and still has not done it.  Clean-up progressing, starting with moving of tank off the side of hill.  Oil travelled downhill about 75-100' but did not get in stream - travelled parallel to it.  Mostly leaves saturated with oil - will be bagged up and removed.  Probably more of a gas well than oil - just enough to make mess.  Will continue to monitor.  Spill report started - 3-4 bbl oil, an estimate.
+
|  
|
+
|  
|
+
| style="text-align:right;" | 0.0
|
+
|  
 
|-
 
|-
 
|-
 
|-
| -1676696787
+
| 2010-0
| 2005-05-27
+
| style="text-align:right;" | 40.0
|
+
|  
| Inspection this day found rig on well and running tubing back in - waiting for a part that will be in next week - should be producing then.  Landowners not happy - Paul asked me to talk to them - say he needs new lease?
+
|  
|
+
|  
|
+
| style="text-align:right;" | 0.0
|
+
|  
 
|-
 
|-
 
|-
 
|-
| -1981388809
+
| 2011-0
| 2004-01-29
+
| style="text-align:right;" | 25.0
|
+
|  
| I was asked to inspection this well for the landowner - talked with him and he has never got royalty checking in 18? Years.  Computer shows made 10 bbl/year in 1997.  Inspection found old shackle-line jack incapable of producing - large tree has fallen on pumphouse, crushing it and making motor inaccessible.  Tank on side of hill, no ID's, can see where water/oil has been drained downhill into run - but not in long time.  Erosion ditch has been cut when draining.  Have talked previously with operator regarding his Idle wells so will go  ahead and give NOV to reinforce my words.  Giving extra time due to winter conditions. 12/7/04 - Told Paul well was going for C.O.'s - he says he wants to produce it - I said he had to get something done next week to prevent from going.  5/27/2005 working on well this day - should be producing next week.
+
|  
|
+
|  
| 9-9-05(A)10
+
| style="text-align:right;" | 0.0
|
+
|  
 
|-
 
|-
 
|-
 
|-
| -1981388809
+
| 2012-0
| 2004-01-29
+
| style="text-align:right;" | 100.0
|
+
|  
| I was asked to inspection this well for the landowner - talked with him and he has never got royalty checking in 18? Years.  Computer shows made 10 bbl/year in 1997.  Inspection found old shackle-line jack incapable of producing - large tree has fallen on pumphouse, crushing it and making motor inaccessible.  Tank on side of hill, no ID's, can see where water/oil has been drained downhill into run - but not in long time.  Erosion ditch has been cut when draining.  Have talked previously with operator regarding his Idle wells so will go  ahead and give NOV to reinforce my words.  Giving extra time due to winter conditions. 12/7/04 - Told Paul well was going for C.O.'s - he says he wants to produce it - I said he had to get something done next week to prevent from going.  5/27/2005 working on well this day - should be producing next week.
+
|  
|
+
|  
| NONE
+
| style="text-align:right;" | 0.0
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1256905490
+
| 2013-0
| 2009-10-30
+
| style="text-align:right;" | 0.0
|
+
|  
| New oil tank too close to well, no ID's.  Met with Supervisor and Paul Valentine, talked about what still needed done (clean up isolated patches of oil-soaked dirt, spread Gater over oily patches, move tank - when empty, ID's are posted) and discussed timeframe of 1 week. Post ID's, clean up oil spill to ODNR's satisfaction, place tank 50' from well, build dike around tank to hold 110% of volume.  4/22/10 Talked to Paul Valentine - he says tank is full, will haul oil next week and then have tank moved.  3/1/11 - Paul Valentine says he will have tank emptied and moved by end of month.  6/10- Tank still not moved, adding more violations.
+
|  
|
+
|  
| 9-1-07
+
| style="text-align:right;" | 10.0
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1256905490
+
| 2014-0
| 2009-10-30
+
| style="text-align:right;" | 60.0
|
+
| style="text-align:right;" | 0.0
| New oil tank too close to well, no ID's.  Met with Supervisor and Paul Valentine, talked about what still needed done (clean up isolated patches of oil-soaked dirt, spread Gater over oily patches, move tank - when empty, ID's are posted) and discussed timeframe of 1 week. Post ID's, clean up oil spill to ODNR's satisfaction, place tank 50' from well, build dike around tank to hold 110% of volume.  4/22/10 Talked to Paul Valentine - he says tank is full, will haul oil next week and then have tank moved.  3/1/11 - Paul Valentine says he will have tank emptied and moved by end of month.  6/10- Tank still not moved, adding more violations.
+
|
|
+
|  
| 9-9-05(A)10
+
| style="text-align:right;" | 10.0
|
+
| style="text-align:right;" | 0.0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-06-20 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
| 1256905490
+
| 1204353376
| 2009-10-30
+
| 2014-12-29
|
+
|  
| New oil tank too close to well, no ID's.   Met with Supervisor and Paul Valentine, talked about what still needed done (clean up isolated patches of oil-soaked dirt, spread Gater over oily patches, move tank - when empty, ID's are posted) and discussed timeframe of 1 week. Post ID's, clean up oil spill to ODNR's satisfaction, place tank 50' from well, build dike around tank to hold 110% of volume. 4/22/10 Talked to Paul Valentine - he says tank is full, will haul oil next week and then have tank moved. 3/1/11 - Paul Valentine says he will have tank emptied and moved by end of month.  6/10- Tank still not moved, adding more violations.
+
| Upon inspection, it was observed that no effort has been made to bring this well into compliance. The well is idle, but is capable of production. The 100 bbl production tank needs to be moved to meet spacing requirements and an SPCC compliant dike must be built around it. I will contact Mr. Paul Valentine and inquire about plans to bring this well into production or to plug and abandon it.
|
+
|  
| 9-9-05(A)2
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1256905490
 
| 1256905490
 
| 2009-10-30
 
| 2009-10-30
|
+
|  
| New oil tank too close to well, no ID's.  Met with Supervisor and Paul Valentine, talked about what still needed done (clean up isolated patches of oil-soaked dirt, spread Gater over oily patches, move tank - when empty, ID's are posted) and discussed timeframe of 1 week. Post ID's, clean up oil spill to ODNR's satisfaction, place tank 50' from well, build dike around tank to hold 110% of volume.  4/22/10 Talked to Paul Valentine - he says tank is full, will haul oil next week and then have tank moved.  3/1/11 - Paul Valentine says he will have tank emptied and moved by end of month.  6/10- Tank still not moved, adding more violations.
+
| New oil tank too close to well, no ID's.  Met with Supervisor and Paul Valentine, talked about what still needed done (clean up isolated patches of oil-soaked dirt, spread Gater over oily patches, move tank - when empty, ID's are posted) and discussed timeframe of 1 week. Post ID's, clean up oil spill to ODNR's satisfaction, place tank 50' from well, build dike around tank to hold 110% of volume.  4/22/10 Talked to Paul Valentine - he says tank is full, will haul oil next week and then have tank moved.  3/1/11 - Paul Valentine says he will have tank emptied and moved by end of month.  6/10- Tank still not moved, adding more violations.
|
+
|  
| NONE(B)
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1306870039
 
| 1306870039
 
| 2011-05-31
 
| 2011-05-31
|
+
|  
 
| No change - remedy required by 11/09.  Oil tank still not moved - about 35' away from jack.  Trail to well very overgrown - no one has been to well in long time.  Paul had commited to having tank moved by end of March, 2011. Annual production shows well has not produced since 2007.  Will add additional violation at this time.  Need to file for Temporary Inactive status.  Need to move on to next step  - pictures taken.  6/1 - called and talked to Mrs. Stonerock - suggested to her that proceed thru the courts to take the well back - Paul has no intention of acting responsibly and she said last check they received for the well was 2007.
 
| No change - remedy required by 11/09.  Oil tank still not moved - about 35' away from jack.  Trail to well very overgrown - no one has been to well in long time.  Paul had commited to having tank moved by end of March, 2011. Annual production shows well has not produced since 2007.  Will add additional violation at this time.  Need to file for Temporary Inactive status.  Need to move on to next step  - pictures taken.  6/1 - called and talked to Mrs. Stonerock - suggested to her that proceed thru the courts to take the well back - Paul has no intention of acting responsibly and she said last check they received for the well was 2007.
|
+
|  
| NONE
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1306870039
+
| 1314915072
| 2011-05-31
+
| 2005-04-19
|
+
|  
| No change - remedy required by 11/09.  Oil tank still not moved - about 35' away from jack.  Trail to well very overgrown - no one has been to well in long time.  Paul had commited to having tank moved by end of March, 2011. Annual production shows well has not produced since 2007.  Will add additional violation at this time.  Need to file for Temporary Inactive status.  Need to move on to next step  - pictures taken.  6/1 - called and talked to Mrs. Stonerock - suggested to her that proceed thru the courts to take the well back - Paul has no intention of acting responsibly and she said last check they received for the well was 2007.
+
| Inspection this day found new motor on pumping unit but still not going - has broken arm for the unit and trying to get it fixed.
|
+
|  
| NONE_
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
| 1314915072
+
| -1327395895
| 2005-04-19
+
| 2004-05-26
|
+
|  
| Inspection this day found new motor on pumping unit but still not going - has "broken arm" for the unit and trying to get it fixed.
+
| Talked with Valentine and he is having trouble getting landowner to let him on property, so I called landowner (Stonerock) to discuss problem.  He has agreed to give Paul a short term lease until Paul proves his intent - am continuing to work on solution to this NOV
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1347325389
 
| 1347325389
 
| 2010-08-11
 
| 2010-08-11
|
+
|  
 
| Nothing has been done regarding moving of tank, finishing oil spill clean-up.  Dozer still on location, good ID's on tank.  Called Eileen Valentine and asked her to get Paul to finish this project.
 
| Nothing has been done regarding moving of tank, finishing oil spill clean-up.  Dozer still on location, good ID's on tank.  Called Eileen Valentine and asked her to get Paul to finish this project.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1349793422
 
| 1349793422
 
| 2012-10-09
 
| 2012-10-09
|
+
|  
 
| Mr. Stonerock, landowner, called to say well is still idle - he has been to 2 attorneys and they said he cannot break the lease due to other wells on the property producing.  Paul Valentine has not produced this well in many years and it was hoped that once/if lease was broke, then could proceed to get well plugged.  I told Stonerock that I would continue to work with the help of our attorney, to get something done with the well.
 
| Mr. Stonerock, landowner, called to say well is still idle - he has been to 2 attorneys and they said he cannot break the lease due to other wells on the property producing.  Paul Valentine has not produced this well in many years and it was hoped that once/if lease was broke, then could proceed to get well plugged.  I told Stonerock that I would continue to work with the help of our attorney, to get something done with the well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1361842288
 
| 1361842288
 
| 2004-06-03
 
| 2004-06-03
|
+
|  
 
| Talked with landowner - Paul Valentine had not yet stopped by but they are hiring lawyer to take lease away from him, so violation will not be necessary at that point. Will continue to monitor progress.
 
| Talked with landowner - Paul Valentine had not yet stopped by but they are hiring lawyer to take lease away from him, so violation will not be necessary at that point. Will continue to monitor progress.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1387555101
 
| 1387555101
 
| 2013-12-18
 
| 2013-12-18
|
+
|  
 
| No attempt has been made to gain compliance since the last inspection.  Well is equipped with a shackleline pumping unit and a gasoline engine.  The polish rod is dry.  It is also set up with a gas escape well head.  There is one 100 barrel tank for production.  It is less than 50 ft from the well.  No identification is present on well head or tank.  Spoke with landowner Mr. Tom Stonerock on site.
 
| No attempt has been made to gain compliance since the last inspection.  Well is equipped with a shackleline pumping unit and a gasoline engine.  The polish rod is dry.  It is also set up with a gas escape well head.  There is one 100 barrel tank for production.  It is less than 50 ft from the well.  No identification is present on well head or tank.  Spoke with landowner Mr. Tom Stonerock on site.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -1666124760
 +
| 2009-07-27
 +
|
 +
| Oil spill found this day on Tom Stonerock's ground.  Flow line to tank has come loose, has been floppying around in the air as well flows gas.  Ground saturated with oil covering an area 100 x 200' around the tank and well.  Kink in plastic line finally cut off flow and stopped further damage.  Could have happened several months ago as owner not pumping well regularly.  He was told to move tank several months ago and still has not done it.  Clean-up progressing, starting with moving of tank off the side of hill.  Oil travelled downhill about 75-100' but did not get in stream - travelled parallel to it.  Mostly leaves saturated with oil - will be bagged up and removed.  Probably more of a gas well than oil - just enough to make mess.  Will continue to monitor.  Spill report started - 3-4 bbl oil, an estimate.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1676696787
 +
| 2005-05-27
 +
|
 +
| Inspection this day found rig on well and running tubing back in - waiting for a part that will be in next week - should be producing then.  Landowners not happy - Paul asked me to talk to them - say he needs new lease?
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 1876805906
 
| 1876805906
 
| 2005-01-26
 
| 2005-01-26
|
+
|  
 
| Inspection found no change other than trees have been cut off pump house roof so can get to start engine.  Well still not producing.  Will send for C. O's.
 
| Inspection found no change other than trees have been cut off pump house roof so can get to start engine.  Well still not producing.  Will send for C. O's.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 1894477502
 +
| 2009-10-30
 +
|
 +
| FOLLOW UP TO NOV #  1256905490  New oil tank too close to well, no ID's.  Met with Supervisor and Paul Valentine, talked about what still needed done (clean up isolated patches of oil-soaked dirt, spread Gater over oily patches, move tank - when empty, ID's are posted) and discussed timeframe of 1 week. Post ID's, clean up oil spill to ODNR's satisfaction, place tank 50' from well, build dike around tank to hold 110% of volume.  4/22/10 Talked to Paul Valentine - he says tank is full, will haul oil next week and then have tank moved.  3/1/11 - Paul Valentine says he will have tank emptied and moved by end of month.  6/10- Tank still not moved, adding more violations.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1981388809
 +
| 2004-01-29
 +
|
 +
| I was asked to inspection this well for the landowner - talked with him and he has never got royalty checking in 18? Years.  Computer shows made 10 bbl/year in 1997.  Inspection found old shackle-line jack incapable of producing - large tree has fallen on pumphouse, crushing it and making motor inaccessible.  Tank on side of hill, no ID's, can see where water/oil has been drained downhill into run - but not in long time.  Erosion ditch has been cut when draining.  Have talked previously with operator regarding his Idle wells so will go  ahead and give NOV to reinforce my words.  Giving extra time due to winter conditions. 12/7/04 - Told Paul well was going for C.O.'s - he says he wants to produce it - I said he had to get something done next week to prevent from going.  5/27/2005 working on well this day - should be producing next week.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -396949528
 +
| 2015-05-04
 +
|
 +
| Upon inspection, it was observed that this well is still noncompliant. The polish rod on the pumping unit is dry/oxidized indicating that the well has not been pumped recently. The well is capable of production as flow lines are attached to the well head and extend into the 100 bbl production tank. There is free oil product pooled up around the 6.625 surface casing, indicating a possible hole in the casing. The production tank is still too close to the well to meet ODNR DOGRM spacing requirements and there is contamination present around the tank bottom. The containment dike is compromised and would be ineffective in the event of a tank rupture/spill. No identification information is present on the location. The well has been historically noncompliant since at least 1/29/2004. A formal request for Chief's Orders to plug and abandon this well will be compiled and submitted this week.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|-
 
|-
 
| 404895723
 
| 404895723
 
| 2010-04-22
 
| 2010-04-22
|
+
|  
 
| Talked to Paul Valentine this day and says oil tank is full, should have it hauled next week, then tank will be moved.  Told him to call me when done.
 
| Talked to Paul Valentine this day and says oil tank is full, should have it hauled next week, then tank will be moved.  Told him to call me when done.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 755823396
 
| 755823396
 
| 2009-08-07
 
| 2009-08-07
|
+
|  
 
| Inspection due to oil spill - clean-up still on-going but ground cleaned, mulch put down over soiled area, tank has been moved out - found to be leaking and location for new tank built but no tank yet.  Paul says he has found peace with Tom Stonerock, landowner and will be pumping well every week.  Will continue to monitor.
 
| Inspection due to oil spill - clean-up still on-going but ground cleaned, mulch put down over soiled area, tank has been moved out - found to be leaking and location for new tank built but no tank yet.  Paul says he has found peace with Tom Stonerock, landowner and will be pumping well every week.  Will continue to monitor.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 872957465
 
| 872957465
 
| 2011-03-01
 
| 2011-03-01
|
+
|  
 
| Talked to Paul Valentine this day.  He has promised to have this tank moved by end of month.  Says landowner won't tell him where he wants it - will ask again and then get it emptied and moved.
 
| Talked to Paul Valentine this day.  He has promised to have this tank moved by end of month.  Says landowner won't tell him where he wants it - will ask again and then get it emptied and moved.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 06:39, 16 July 2015

Well Details

Well ID: 34-167-20796
Loading map...
County: Washington
Municipality:
Operator Name: VALENTINE OIL CO P & D
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1948-05-18
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.52390527
Longitude: -81.11771673

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
1997-0 0.0 10.0
1998-0 0.0 0.0
1999-0 0.0 0.0
2005-0 8.0 0.0
2006-0 20.0 10.0
2007-0 0.0 32.0
2008-0 0.0 0.0
2009-0 0.0 0.0
2010-0 40.0 0.0
2011-0 25.0 0.0
2012-0 100.0 0.0
2013-0 0.0 10.0
2014-0 60.0 0.0 10.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1204353376 2014-12-29 Upon inspection, it was observed that no effort has been made to bring this well into compliance. The well is idle, but is capable of production. The 100 bbl production tank needs to be moved to meet spacing requirements and an SPCC compliant dike must be built around it. I will contact Mr. Paul Valentine and inquire about plans to bring this well into production or to plug and abandon it.
1256905490 2009-10-30 New oil tank too close to well, no ID's. Met with Supervisor and Paul Valentine, talked about what still needed done (clean up isolated patches of oil-soaked dirt, spread Gater over oily patches, move tank - when empty, ID's are posted) and discussed timeframe of 1 week. Post ID's, clean up oil spill to ODNR's satisfaction, place tank 50' from well, build dike around tank to hold 110% of volume. 4/22/10 Talked to Paul Valentine - he says tank is full, will haul oil next week and then have tank moved. 3/1/11 - Paul Valentine says he will have tank emptied and moved by end of month. 6/10- Tank still not moved, adding more violations.
1306870039 2011-05-31 No change - remedy required by 11/09. Oil tank still not moved - about 35' away from jack. Trail to well very overgrown - no one has been to well in long time. Paul had commited to having tank moved by end of March, 2011. Annual production shows well has not produced since 2007. Will add additional violation at this time. Need to file for Temporary Inactive status. Need to move on to next step - pictures taken. 6/1 - called and talked to Mrs. Stonerock - suggested to her that proceed thru the courts to take the well back - Paul has no intention of acting responsibly and she said last check they received for the well was 2007.
1314915072 2005-04-19 Inspection this day found new motor on pumping unit but still not going - has broken arm for the unit and trying to get it fixed.
-1327395895 2004-05-26 Talked with Valentine and he is having trouble getting landowner to let him on property, so I called landowner (Stonerock) to discuss problem. He has agreed to give Paul a short term lease until Paul proves his intent - am continuing to work on solution to this NOV
1347325389 2010-08-11 Nothing has been done regarding moving of tank, finishing oil spill clean-up. Dozer still on location, good ID's on tank. Called Eileen Valentine and asked her to get Paul to finish this project.
1349793422 2012-10-09 Mr. Stonerock, landowner, called to say well is still idle - he has been to 2 attorneys and they said he cannot break the lease due to other wells on the property producing. Paul Valentine has not produced this well in many years and it was hoped that once/if lease was broke, then could proceed to get well plugged. I told Stonerock that I would continue to work with the help of our attorney, to get something done with the well.
1361842288 2004-06-03 Talked with landowner - Paul Valentine had not yet stopped by but they are hiring lawyer to take lease away from him, so violation will not be necessary at that point. Will continue to monitor progress.
1387555101 2013-12-18 No attempt has been made to gain compliance since the last inspection. Well is equipped with a shackleline pumping unit and a gasoline engine. The polish rod is dry. It is also set up with a gas escape well head. There is one 100 barrel tank for production. It is less than 50 ft from the well. No identification is present on well head or tank. Spoke with landowner Mr. Tom Stonerock on site.
-1666124760 2009-07-27 Oil spill found this day on Tom Stonerock's ground. Flow line to tank has come loose, has been floppying around in the air as well flows gas. Ground saturated with oil covering an area 100 x 200' around the tank and well. Kink in plastic line finally cut off flow and stopped further damage. Could have happened several months ago as owner not pumping well regularly. He was told to move tank several months ago and still has not done it. Clean-up progressing, starting with moving of tank off the side of hill. Oil travelled downhill about 75-100' but did not get in stream - travelled parallel to it. Mostly leaves saturated with oil - will be bagged up and removed. Probably more of a gas well than oil - just enough to make mess. Will continue to monitor. Spill report started - 3-4 bbl oil, an estimate.
-1676696787 2005-05-27 Inspection this day found rig on well and running tubing back in - waiting for a part that will be in next week - should be producing then. Landowners not happy - Paul asked me to talk to them - say he needs new lease?
1876805906 2005-01-26 Inspection found no change other than trees have been cut off pump house roof so can get to start engine. Well still not producing. Will send for C. O's.
1894477502 2009-10-30 FOLLOW UP TO NOV # 1256905490 New oil tank too close to well, no ID's. Met with Supervisor and Paul Valentine, talked about what still needed done (clean up isolated patches of oil-soaked dirt, spread Gater over oily patches, move tank - when empty, ID's are posted) and discussed timeframe of 1 week. Post ID's, clean up oil spill to ODNR's satisfaction, place tank 50' from well, build dike around tank to hold 110% of volume. 4/22/10 Talked to Paul Valentine - he says tank is full, will haul oil next week and then have tank moved. 3/1/11 - Paul Valentine says he will have tank emptied and moved by end of month. 6/10- Tank still not moved, adding more violations.
-1981388809 2004-01-29 I was asked to inspection this well for the landowner - talked with him and he has never got royalty checking in 18? Years. Computer shows made 10 bbl/year in 1997. Inspection found old shackle-line jack incapable of producing - large tree has fallen on pumphouse, crushing it and making motor inaccessible. Tank on side of hill, no ID's, can see where water/oil has been drained downhill into run - but not in long time. Erosion ditch has been cut when draining. Have talked previously with operator regarding his Idle wells so will go ahead and give NOV to reinforce my words. Giving extra time due to winter conditions. 12/7/04 - Told Paul well was going for C.O.'s - he says he wants to produce it - I said he had to get something done next week to prevent from going. 5/27/2005 working on well this day - should be producing next week.
-396949528 2015-05-04 Upon inspection, it was observed that this well is still noncompliant. The polish rod on the pumping unit is dry/oxidized indicating that the well has not been pumped recently. The well is capable of production as flow lines are attached to the well head and extend into the 100 bbl production tank. There is free oil product pooled up around the 6.625 surface casing, indicating a possible hole in the casing. The production tank is still too close to the well to meet ODNR DOGRM spacing requirements and there is contamination present around the tank bottom. The containment dike is compromised and would be ineffective in the event of a tank rupture/spill. No identification information is present on the location. The well has been historically noncompliant since at least 1/29/2004. A formal request for Chief's Orders to plug and abandon this well will be compiled and submitted this week.
404895723 2010-04-22 Talked to Paul Valentine this day and says oil tank is full, should have it hauled next week, then tank will be moved. Told him to call me when done.
755823396 2009-08-07 Inspection due to oil spill - clean-up still on-going but ground cleaned, mulch put down over soiled area, tank has been moved out - found to be leaking and location for new tank built but no tank yet. Paul says he has found peace with Tom Stonerock, landowner and will be pumping well every week. Will continue to monitor.
872957465 2011-03-01 Talked to Paul Valentine this day. He has promised to have this tank moved by end of month. Says landowner won't tell him where he wants it - will ask again and then get it emptied and moved.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.