If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-167-29727 | | Well ID: 34-167-29727 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.45511938, -81.21685844 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Washington County, Ohio|Washington]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[HEINRICH ENT INC/WASHINGTON OP]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-08-13 | | Spud Date: 2013-08-13 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
− | | Violations: | + | | Violations: 0 |
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.45511938 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.21685844 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 138.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 2496.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 76: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | 1277995746 | ||
+ | | 2013-08-14 | ||
+ | | | ||
+ | | Witnessed the surface casing being ran and cemented. New pipe was used for this string. Good circulation was achieved and good returns were observed. Once cement was displaced, it stayed at the surface and did not drop. Pressure test was conducted in conjunction with the Blowout Preventer (BOP) test. Everything was pressured up to 500 psi and was held for 15 minutes. Mr. Jim Wood with the Bureau of Land Management reported that there was no drop in pressure. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1284451388 | ||
+ | | 2015-05-14 | ||
+ | | | ||
+ | | Received call at 9:32 am from Christy Chavez of Heinrich Enterprises. She stated that their Field Manager, Mr. Sam Johnson, has been working with contractors as well as Wayne National Forest to fix the slipping slope above the lease road on this location. She stated that work will be done to fix the slip this summer. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -1291456649 | | -1291456649 | ||
| 2013-08-20 | | 2013-08-20 | ||
− | | | + | | |
| Total depth at the time of inspection was 1380 ft. Drilling crew will drill to 1830 ft. and then run their 7 in. casing. Spoke with drillers on site. | | Total depth at the time of inspection was 1380 ft. Drilling crew will drill to 1830 ft. and then run their 7 in. casing. Spoke with drillers on site. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 1375377900 | ||
+ | | 2013-07-30 | ||
+ | | | ||
+ | | Checked on the construction of the drilling site. Spoke with contractor Jeff Jackson on site. He had cut the ditch in and laid culvert in it. He planned on cutting trees and doing dozer work the next day. Walked back to site, and went over the plan with Mr. Jackson. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1429812888 | ||
+ | | 2015-05-11 | ||
+ | | | ||
+ | | Upon inspection, it was observed that the majority of the location is now stabilized with a vegetative cover. The slope above the lease road is still slipping and eroding and has little vegetatation growing. I spoke with Mr. Jeff Jackson who does Heinrich's dirt work and he stated that he has been contacted to perform remedial work on the slip this summer. Sheet pilings may be used to hold the slope in place once it has been fixed. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | -1618160771 | ||
+ | | 2015-03-02 | ||
+ | | | ||
+ | | Upon inspection, it was observed that the area above the lease road is still slumped and needs addressed. In addition, the southeast corner of the location still has deep erosional gullies that need to be addressed. I will contact Ms. Christy Chavez of Heinrich Enterprises and let her know that these issues need addressed as soon as the weather is fit. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -1686573044 | | -1686573044 | ||
| 2013-08-29 | | 2013-08-29 | ||
− | | | + | | |
| Rig has been moved off of the site. Mr. Bryan Chavez reported that three loads of fluid had been taken off of the pit and only cuttings were left. Well was shut in with a 4.5 in to 2 in swage and a 2 in valve. | | Rig has been moved off of the site. Mr. Bryan Chavez reported that three loads of fluid had been taken off of the pit and only cuttings were left. Well was shut in with a 4.5 in to 2 in swage and a 2 in valve. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -1745878548 | | -1745878548 | ||
| 2013-08-21 | | 2013-08-21 | ||
− | | | + | | |
− | | Witnessed the cementing of the 7 | + | | Witnessed the cementing of the 7 intermittent casing string. Circulation was achieved during the displacement of the wiper plug. Oil was circulated to the surface. Well was also gassing throughout the process. Accompanied by Mr. Jim Wood from the Bureau of Land Management. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -1945822065 | | -1945822065 | ||
| 2013-08-22 | | 2013-08-22 | ||
− | | | + | | |
| Witnessed the BOP and casing test with Mr. Jim Wood from the Bureau of Land Management. After 7 runs with adjustments after each one the well passed the test. It started at 500 psi, and ended at 490 psi after 30 min. | | Witnessed the BOP and casing test with Mr. Jim Wood from the Bureau of Land Management. After 7 runs with adjustments after each one the well passed the test. It started at 500 psi, and ended at 490 psi after 30 min. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 1989120741 | ||
+ | | 2014-10-30 | ||
+ | | | ||
+ | | Upon inspection, it was observed that the slip on the area above the lease road has been worked on recently. The barren areas along the eastern perimeter of the location is still present and deeper rills and gullies have formed due to soil erosion. I will call Heinrich Enterprises and recommend they re-grade this area and stabilize it with mulch for the winter months and re-seed it this spring when vegetation has a better chance of taking root. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -388986345 | | -388986345 | ||
| 2013-09-09 | | 2013-09-09 | ||
− | | | + | | |
| Witnessed logging activities for this well. Cement top was established at 1750 ft. I also inspected site. Pit was closed and the whole site had been graded. | | Witnessed logging activities for this well. Cement top was established at 1750 ft. I also inspected site. Pit was closed and the whole site had been graded. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 520392802 | | 520392802 | ||
| 2014-08-26 | | 2014-08-26 | ||
− | | | + | | |
| Upon inspection, it was observed that much of the well pad location is void of vegetation and the eastern slope of the pad is allowing significant erosion to take place. In addition, the lease road needs maintained and the slope to the south of the lease road is slumping. Barren areas on the location need to be re-seeded/mulched to encourage stabilization of the soil and minimize erosive conditions. Preliminary restoration cannot be passed until these conditions are met. I will contact Mr. Carl Heinrich via phone call and notify him of this situation. Mr. Heinrich will have until 9/30/2014 to complete the preliminary restoration for this location. | | Upon inspection, it was observed that much of the well pad location is void of vegetation and the eastern slope of the pad is allowing significant erosion to take place. In addition, the lease road needs maintained and the slope to the south of the lease road is slumping. Barren areas on the location need to be re-seeded/mulched to encourage stabilization of the soil and minimize erosive conditions. Preliminary restoration cannot be passed until these conditions are met. I will contact Mr. Carl Heinrich via phone call and notify him of this situation. Mr. Heinrich will have until 9/30/2014 to complete the preliminary restoration for this location. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 66083845 | | 66083845 | ||
| 2013-08-13 | | 2013-08-13 | ||
− | | | + | | |
| Witnessed the running and cementing of the conductor casing. The pipe was ran with ease. Good circulation was established and good returns were observed on the cement job. | | Witnessed the running and cementing of the conductor casing. The pipe was ran with ease. Good circulation was established and good returns were observed on the cement job. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 739945355 | | 739945355 | ||
| 2013-08-26 | | 2013-08-26 | ||
− | | | + | | |
− | | Status check on drilling operation with the accompaniment of Mr. Rick Cisler and Mr. Kenny Brown. Total depth at the time of inspection was 2310 ft. Company should be ready to run 4.5 | + | | Status check on drilling operation with the accompaniment of Mr. Rick Cisler and Mr. Kenny Brown. Total depth at the time of inspection was 2310 ft. Company should be ready to run 4.5 pipe tomorrow. Inspected pit, and walked around site. Everything is in compliance. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -814456268 | ||
+ | | 2013-09-09 | ||
+ | | | ||
+ | | Logging of this well took place shortly before I arrived on site. The wireline company and Mr. Carl Heinrich were still on site. The top of the cement on the production casing string was at 1760 ft. according to the log. Pit has been closed and the site has been graded. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-167-29727 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.45511938,"lon":-81.21685844,"icon":""}]} |
County: Washington | |
Municipality: | |
Operator Name: HEINRICH ENT INC/WASHINGTON OP | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-08-13 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.45511938 | |
Longitude: -81.21685844 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 138.0 | 0.0 | ||||
2014-0 | 2496.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1277995746 | 2013-08-14 | Witnessed the surface casing being ran and cemented. New pipe was used for this string. Good circulation was achieved and good returns were observed. Once cement was displaced, it stayed at the surface and did not drop. Pressure test was conducted in conjunction with the Blowout Preventer (BOP) test. Everything was pressured up to 500 psi and was held for 15 minutes. Mr. Jim Wood with the Bureau of Land Management reported that there was no drop in pressure. | ||||
1284451388 | 2015-05-14 | Received call at 9:32 am from Christy Chavez of Heinrich Enterprises. She stated that their Field Manager, Mr. Sam Johnson, has been working with contractors as well as Wayne National Forest to fix the slipping slope above the lease road on this location. She stated that work will be done to fix the slip this summer. | ||||
-1291456649 | 2013-08-20 | Total depth at the time of inspection was 1380 ft. Drilling crew will drill to 1830 ft. and then run their 7 in. casing. Spoke with drillers on site. | ||||
1375377900 | 2013-07-30 | Checked on the construction of the drilling site. Spoke with contractor Jeff Jackson on site. He had cut the ditch in and laid culvert in it. He planned on cutting trees and doing dozer work the next day. Walked back to site, and went over the plan with Mr. Jackson. | ||||
1429812888 | 2015-05-11 | Upon inspection, it was observed that the majority of the location is now stabilized with a vegetative cover. The slope above the lease road is still slipping and eroding and has little vegetatation growing. I spoke with Mr. Jeff Jackson who does Heinrich's dirt work and he stated that he has been contacted to perform remedial work on the slip this summer. Sheet pilings may be used to hold the slope in place once it has been fixed. | ||||
-1618160771 | 2015-03-02 | Upon inspection, it was observed that the area above the lease road is still slumped and needs addressed. In addition, the southeast corner of the location still has deep erosional gullies that need to be addressed. I will contact Ms. Christy Chavez of Heinrich Enterprises and let her know that these issues need addressed as soon as the weather is fit. | ||||
-1686573044 | 2013-08-29 | Rig has been moved off of the site. Mr. Bryan Chavez reported that three loads of fluid had been taken off of the pit and only cuttings were left. Well was shut in with a 4.5 in to 2 in swage and a 2 in valve. | ||||
-1745878548 | 2013-08-21 | Witnessed the cementing of the 7 intermittent casing string. Circulation was achieved during the displacement of the wiper plug. Oil was circulated to the surface. Well was also gassing throughout the process. Accompanied by Mr. Jim Wood from the Bureau of Land Management. | ||||
-1945822065 | 2013-08-22 | Witnessed the BOP and casing test with Mr. Jim Wood from the Bureau of Land Management. After 7 runs with adjustments after each one the well passed the test. It started at 500 psi, and ended at 490 psi after 30 min. | ||||
1989120741 | 2014-10-30 | Upon inspection, it was observed that the slip on the area above the lease road has been worked on recently. The barren areas along the eastern perimeter of the location is still present and deeper rills and gullies have formed due to soil erosion. I will call Heinrich Enterprises and recommend they re-grade this area and stabilize it with mulch for the winter months and re-seed it this spring when vegetation has a better chance of taking root. | ||||
-388986345 | 2013-09-09 | Witnessed logging activities for this well. Cement top was established at 1750 ft. I also inspected site. Pit was closed and the whole site had been graded. | ||||
520392802 | 2014-08-26 | Upon inspection, it was observed that much of the well pad location is void of vegetation and the eastern slope of the pad is allowing significant erosion to take place. In addition, the lease road needs maintained and the slope to the south of the lease road is slumping. Barren areas on the location need to be re-seeded/mulched to encourage stabilization of the soil and minimize erosive conditions. Preliminary restoration cannot be passed until these conditions are met. I will contact Mr. Carl Heinrich via phone call and notify him of this situation. Mr. Heinrich will have until 9/30/2014 to complete the preliminary restoration for this location. | ||||
66083845 | 2013-08-13 | Witnessed the running and cementing of the conductor casing. The pipe was ran with ease. Good circulation was established and good returns were observed on the cement job. | ||||
739945355 | 2013-08-26 | Status check on drilling operation with the accompaniment of Mr. Rick Cisler and Mr. Kenny Brown. Total depth at the time of inspection was 2310 ft. Company should be ready to run 4.5 pipe tomorrow. Inspected pit, and walked around site. Everything is in compliance. | ||||
-814456268 | 2013-09-09 | Logging of this well took place shortly before I arrived on site. The wireline company and Mr. Carl Heinrich were still on site. The top of the cement on the production casing string was at 1760 ft. according to the log. Pit has been closed and the site has been graded. |