| Well ID: 34-083-24573
 
| Well ID: 34-083-24573
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.2714489061, -82.3840138872 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.27144891, -82.38401389 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Knox County, Ohio|Knox]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[LBJ DRILLING CO INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
| Spud Date:
+
| Spud Date:  
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing:
+
| Well Status: Not Drilled
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 40.2714489061
+
| Latitude: 40.27144891
 
|-
 
|-
| Longitude: -82.3840138872
+
| Longitude: -82.38401389
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
|}
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | TYPE
 
!scope="col" | QUANTITY
 
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|}
 
|}
 
== Inspection Data ==
 
== Inspection Data ==
Line 64: Line 42:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1053110175
 +
| 2015-04-10
 +
|
 +
| Drilling operations are ongoing they are currently 784 feet deep and preparing to reduce the bore size to finish the well main bore.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1311901002
 +
| 2015-03-10
 +
|
 +
| The rig is setting idle on location some drive pipe is in the is presently 15 feet of drive pipe sticking up out of the hole. Contacted the operator for LBJ drilling he stated they were going to proceed with the construction of this well once the weather broke.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1427123108
 +
| 2015-03-23
 +
|
 +
| Drilling operations are underway they are setting the drive pipe today.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1427844514
 +
| 2015-03-30
 +
|
 +
| Drilling operations are on going they are 283 feet deep with the construction of the surface bore of the well.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1430147927
 +
| 2015-04-17
 +
|
 +
| Drilling operations are ongoing they are 1400 feet deep with the construction of the main well bore.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1432058045
 +
| 2015-05-01
 +
|
 +
| Drilling operations are on going with the construction of the main well bore of this well and they are presently 1825 feet deep.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1432125223
 +
| 2015-05-08
 +
|
 +
| The rig was setting idle today during this inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1578704214
 +
| 2015-03-31
 +
|
 +
| Running 8 5/8 inch surface casing today. Cemenco Cementing Inc. was on site to cement in the casing circulation was obtained and a good return of cement circulated to the surface.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -1883440066
 +
| 2015-01-06
 +
|
 +
| There was no one on site during this inspection the rig has been setting idle on location for some time. Drive pipe is started and in 20 feet.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -237168645
 +
| 2015-03-27
 +
|
 +
| Drilling operations are ongoing they have set 171 feet of drive pipe and are currently 221 feet deep with the construction of the surface bore.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 369735235
 +
| 2014-09-09
 +
|
 +
| Drilling operations are on going, they are still in the process of setting drive pipe. No one was on site during this inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 398327064
 +
| 2015-04-24
 +
|
 +
| Drilling operations are ongoing the are 1652 feet deep with the construction of the well main bore.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 400711202
 +
| 2015-03-25
 +
|
 +
| Drilling operations are underway they are setting drive pipe and currently have 54 feet in the ground.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 415186097
 +
| 2014-10-28
 +
|
 +
| The rig is setting idle on location no one was on site during this inspection.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| 49226083
 
| 49226083
 
| 2014-08-04
 
| 2014-08-04
|
+
|  
 
| Drilling operations were on going during this inspection they were in the process of setting drive pipe.
 
| Drilling operations were on going during this inspection they were in the process of setting drive pipe.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| 631231080
 +
| 2015-04-06
 +
|
 +
| Drilling operations are on going they are currently 670 feet deep with the main well bore.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 663716288
 +
| 2014-09-17
 +
|
 +
| The rig is setting idle on location no one was on site during this inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -837340024
 +
| 2014-11-18
 +
|
 +
| Setting idle no one on location during inspection, there is no change in the progress of this well construction.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| -884931628
 +
| 2015-03-23
 +
|
 +
| Drilling operations are underway they are setting drive pipe and currently have 54 feet in the ground.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 07:31, 16 July 2015

Well Details

Well ID: 34-083-24573
Loading map...
County: Knox
Municipality:
Operator Name: LBJ DRILLING CO INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional: No
Configuration: Vertical
Well Status: Not Drilled
Violations: 0
Latitude: 40.27144891
Longitude: -82.38401389

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1053110175 2015-04-10 Drilling operations are ongoing they are currently 784 feet deep and preparing to reduce the bore size to finish the well main bore.
1311901002 2015-03-10 The rig is setting idle on location some drive pipe is in the is presently 15 feet of drive pipe sticking up out of the hole. Contacted the operator for LBJ drilling he stated they were going to proceed with the construction of this well once the weather broke.
1427123108 2015-03-23 Drilling operations are underway they are setting the drive pipe today.
1427844514 2015-03-30 Drilling operations are on going they are 283 feet deep with the construction of the surface bore of the well.
1430147927 2015-04-17 Drilling operations are ongoing they are 1400 feet deep with the construction of the main well bore.
1432058045 2015-05-01 Drilling operations are on going with the construction of the main well bore of this well and they are presently 1825 feet deep.
1432125223 2015-05-08 The rig was setting idle today during this inspection.
-1578704214 2015-03-31 Running 8 5/8 inch surface casing today. Cemenco Cementing Inc. was on site to cement in the casing circulation was obtained and a good return of cement circulated to the surface.
-1883440066 2015-01-06 There was no one on site during this inspection the rig has been setting idle on location for some time. Drive pipe is started and in 20 feet.
-237168645 2015-03-27 Drilling operations are ongoing they have set 171 feet of drive pipe and are currently 221 feet deep with the construction of the surface bore.
369735235 2014-09-09 Drilling operations are on going, they are still in the process of setting drive pipe. No one was on site during this inspection.
398327064 2015-04-24 Drilling operations are ongoing the are 1652 feet deep with the construction of the well main bore.
400711202 2015-03-25 Drilling operations are underway they are setting drive pipe and currently have 54 feet in the ground.
415186097 2014-10-28 The rig is setting idle on location no one was on site during this inspection.
49226083 2014-08-04 Drilling operations were on going during this inspection they were in the process of setting drive pipe.
631231080 2015-04-06 Drilling operations are on going they are currently 670 feet deep with the main well bore.
663716288 2014-09-17 The rig is setting idle on location no one was on site during this inspection.
-837340024 2014-11-18 Setting idle no one on location during inspection, there is no change in the progress of this well construction.
-884931628 2015-03-23 Drilling operations are underway they are setting drive pipe and currently have 54 feet in the ground.

For data sources see[1]