If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-019-22150 | | Well ID: 34-019-22150 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.48525574, -80.96350635 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Carroll County, Ohio|Carroll]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[CHESAPEAKE EXPLORATION LLC]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2012-07-12 | | Spud Date: 2012-07-12 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.48525574 |
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.96350635 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2013-12 | ||
+ | | style="text-align:right;" | 163635.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 428.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-6 | ||
+ | | style="text-align:right;" | 28880.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 333.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2013-9 | ||
+ | | style="text-align:right;" | 246646.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 1413.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-3 | ||
+ | | style="text-align:right;" | 100321.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 61.0 | ||
+ | | style="text-align:right;" | 92.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-1 | ||
+ | | style="text-align:right;" | 144941.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 216.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-4 | ||
+ | | style="text-align:right;" | 88134.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 70.0 | ||
+ | | style="text-align:right;" | 90.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-2 | ||
+ | | style="text-align:right;" | 111009.0 | ||
+ | | style="text-align:right;" | 89.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 171.0 | ||
+ | | style="text-align:right;" | 89.0 | ||
+ | |- | ||
+ | |- | ||
+ | | 2015-1 | ||
+ | | style="text-align:right;" | 73627.0 | ||
+ | | style="text-align:right;" | 79.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 109.0 | ||
+ | | style="text-align:right;" | 79.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 130: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1342396646 | | 1342396646 | ||
| 2012-07-15 | | 2012-07-15 | ||
− | | | + | | |
− | | | + | | I was on site to witness the cementing of the 9 5/8 intermediate casing. Nomac Rig #41 reached a total depth of 2012' and ran 47 joints of 40#, 9 5/8 casing to a depth of 2012'. They installed 17 centralizers on this casing string. Halliburton cemented the 9 5/8 casing with 750 sacks of Class A cement with 1/4 #/sack Floseal and 12% salt. Good circulation throughout the job and 22 barrels of cement circulated to surface. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 1343056281 | | 1343056281 | ||
| 2012-07-23 | | 2012-07-23 | ||
− | | | + | | |
− | | | + | | I was on site to check the status of Nomac Rig # 41 and check the status of Express Energy Services conductor rig drilling the other Elwood wells conductor holes. My inspection revealed that Nomac #41 is drilling the curve at 8203'. Express Energy Services is drilling the conductor holes and mouse holes for the # 8 and # 10 wells. Shawn with Express Energy Services advised that it would be later today or this evening before they were ready to cement the conductor on these two wells. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1690206565 | ||
+ | | 2012-07-13 | ||
+ | | | ||
+ | | I was on site to witness the cementing of the 13 3/8 casing. My inspection revealed that Nomac Rig #41 has drilled a 17.5 hole to a total depth of 573' and ran 573' of 13 3/8 casing with 6 centralizers installed on the casing string. Halliburton cemented the 13 3/8 casing with 540 sacks of Class A cement (1% CaCl and .25 #/sack Floseal). There was good circulation throughout the entire job and there was 24 barrels of cement circulated to surface. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-019-22150 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.48525574,"lon":-80.96350635,"icon":""}]} |
County: Carroll | |
Municipality: | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-07-12 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.48525574 | |
Longitude: -80.96350635 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 163635.0 | 428.0 | ||||
2013-6 | 28880.0 | 333.0 | ||||
2013-9 | 246646.0 | 1413.0 | ||||
2014-3 | 100321.0 | 92.0 | 61.0 | 92.0 | ||
2014-1 | 144941.0 | 90.0 | 216.0 | 90.0 | ||
2014-4 | 88134.0 | 90.0 | 70.0 | 90.0 | ||
2014-2 | 111009.0 | 89.0 | 171.0 | 89.0 | ||
2015-1 | 73627.0 | 79.0 | 109.0 | 79.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1342396646 | 2012-07-15 | I was on site to witness the cementing of the 9 5/8 intermediate casing. Nomac Rig #41 reached a total depth of 2012' and ran 47 joints of 40#, 9 5/8 casing to a depth of 2012'. They installed 17 centralizers on this casing string. Halliburton cemented the 9 5/8 casing with 750 sacks of Class A cement with 1/4 #/sack Floseal and 12% salt. Good circulation throughout the job and 22 barrels of cement circulated to surface. | ||||
1343056281 | 2012-07-23 | I was on site to check the status of Nomac Rig # 41 and check the status of Express Energy Services conductor rig drilling the other Elwood wells conductor holes. My inspection revealed that Nomac #41 is drilling the curve at 8203'. Express Energy Services is drilling the conductor holes and mouse holes for the # 8 and # 10 wells. Shawn with Express Energy Services advised that it would be later today or this evening before they were ready to cement the conductor on these two wells. | ||||
-1690206565 | 2012-07-13 | I was on site to witness the cementing of the 13 3/8 casing. My inspection revealed that Nomac Rig #41 has drilled a 17.5 hole to a total depth of 573' and ran 573' of 13 3/8 casing with 6 centralizers installed on the casing string. Halliburton cemented the 13 3/8 casing with 540 sacks of Class A cement (1% CaCl and .25 #/sack Floseal). There was good circulation throughout the entire job and there was 24 barrels of cement circulated to surface. |
For data sources see[2]