Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23124
 
| Well ID: 34-153-23124
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.0474613797, -81.6577717291 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.04739509, -81.65796266 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Summit County, Ohio|Summit]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[INDUSTRY STANDARD SUPPLIES INC]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2010-11-01
 
| Spud Date: 2010-11-01
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 41.0474613797
+
| Latitude: 41.04739509
 
|-
 
|-
| Longitude: -81.6577717291
+
| Longitude: -81.65796266
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2011-0
 +
| style="text-align:right;" | 4857.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 722.0
 +
|
 +
|-
 +
|-
 +
| 2012-0
 +
| style="text-align:right;" | 4575.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 627.0
 +
|
 +
|-
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 1720.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 478.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 2998.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 360.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 94:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 +
|-
 +
| 1208343467
 +
| 2010-10-28
 +
|
 +
| The location has been built and G&H Drilling is starting to move in.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 1291045342
 +
| 2010-11-19
 +
|
 +
| Witness pit solidification. Chemtech delivered and applied two loads of dust to the drilling pits. The landowner requested that the stumps be placed in the pits before they are covered over. He also requested that the tank battery be moved approximately 50 feet to the northeast. I advised the operator and the landowner of the minimum spacing requirements that must be met.
 +
|
 +
|
 +
|
 +
|-
 
|-
 
|-
 
| -1328418953
 
| -1328418953
 
| 2011-07-06
 
| 2011-07-06
|
+
|  
 
| Industry Standard has a contractor on site grading the location and spreading topsoil. The affected area should be ready to seed within a week. The security fencing is up and the well is in production.
 
| Industry Standard has a contractor on site grading the location and spreading topsoil. The affected area should be ready to seed within a week. The security fencing is up and the well is in production.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1397008601
 
| -1397008601
 
| 2010-11-01
 
| 2010-11-01
|
+
|  
 
| G&H Drilling moved on location this past weekend and spudded the well this morning. The drilling pits were lined, fenced and in good condition. This is an urban location. No violations at this time.
 
| G&H Drilling moved on location this past weekend and spudded the well this morning. The drilling pits were lined, fenced and in good condition. This is an urban location. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1399591150
 
| -1399591150
 
| 2010-11-02
 
| 2010-11-02
|
+
|  
| G&H Drilling is coming out from under surface cement and drilling the 7-7/8" main hole with fresh water. They will drill the well with fluid. The pits are fenced, lined and in good condition. No violations at this time.
+
| G&H Drilling is coming out from under surface cement and drilling the 7-7/8 main hole with fresh water. They will drill the well with fluid. The pits are fenced, lined and in good condition. No violations at this time.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| -1654383073
 
| -1654383073
 
| 2010-11-16
 
| 2010-11-16
|
+
|  
 
| The drilling pits have been pumped down, are still lined and fenced. Solidification is scheduled for 11/19.
 
| The drilling pits have been pumped down, are still lined and fenced. Solidification is scheduled for 11/19.
|
+
|  
|
+
|  
|
+
|  
|-
 
|-
 
| -969722324
 
| 2010-12-22
 
|
 
| The well has been fraced and the tank battery has been built. ISSI still needs to set a pump jack and install the security fencing before turn on.
 
|
 
|
 
|
 
|-
 
|-
 
| 1208343467
 
| 2010-10-28
 
|
 
| The location has been built and G&H Drilling is starting to move in.
 
|
 
|
 
|
 
|-
 
|-
 
| 1291045342
 
| 2010-11-19
 
|
 
| Witness pit solidification. Chemtech delivered and applied two loads of dust to the drilling pits. The landowner requested that the stumps be placed in the pits before they are covered over. He also requested that the tank battery be moved approximately 50 feet to the northeast. I advised the operator and the landowner of the minimum spacing requirements that must be met.
 
|
 
|
 
|
 
 
|-
 
|-
 
|-
 
|-
 
| 1663160904
 
| 1663160904
 
| 2010-10-27
 
| 2010-10-27
|
+
|  
 
| The drilling location is being built. The rig is scheduled to arrive later this week.
 
| The drilling location is being built. The rig is scheduled to arrive later this week.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1910749422
 
| 1910749422
 
| 2011-12-14
 
| 2011-12-14
|
+
|  
 
| Preliminary Restoration is approved.
 
| Preliminary Restoration is approved.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1971344387
 
| 1971344387
 
| 2011-03-04
 
| 2011-03-04
|
+
|  
 
| Status check inspection found that the pump jack was installed and pumping. The fence has been installed around the tank battery but not around the wellhead. I called Tim Levengood and told him to shut the well down until all of the fence was installed. There is also a question as to the legality of one of the leases in this unit. Columbus has requested but not yet received additional documentation from ISSI.
 
| Status check inspection found that the pump jack was installed and pumping. The fence has been installed around the tank battery but not around the wellhead. I called Tim Levengood and told him to shut the well down until all of the fence was installed. There is also a question as to the legality of one of the leases in this unit. Columbus has requested but not yet received additional documentation from ISSI.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 239164036
 
| 239164036
 
| 2010-11-04
 
| 2010-11-04
|
+
|  
 
| G&H is drilling ahead on fluid. The pits are fenced, lined and in good condition.
 
| G&H is drilling ahead on fluid. The pits are fenced, lined and in good condition.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 791218496
 
| 791218496
 
| 2011-01-25
 
| 2011-01-25
|
+
|  
 
| A pump jack has not yet been set on the well which has been equipped with rods. The tank battery is being constructed. The required security fence has not been started but will need to be completed before turn on. No indication from the company as to when the well will be ready for turned on. Preliminary restoration is due this spring.
 
| A pump jack has not yet been set on the well which has been equipped with rods. The tank battery is being constructed. The required security fence has not been started but will need to be completed before turn on. No indication from the company as to when the well will be ready for turned on. Preliminary restoration is due this spring.
|
+
|
|
+
|
|
+
|
 +
|-
 +
|-
 +
| -969722324
 +
| 2010-12-22
 +
|
 +
| The well has been fraced and the tank battery has been built. ISSI still needs to set a pump jack and install the security fencing before turn on.
 +
|  
 +
|  
 +
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 10:50, 16 July 2015

Well Details

Well ID: 34-153-23124
Loading map...
County: Summit
Municipality:
Operator Name: INDUSTRY STANDARD SUPPLIES INC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2010-11-01
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 41.04739509
Longitude: -81.65796266

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 4857.0 722.0
2012-0 4575.0 627.0
2013-0 1720.0 478.0
2014-0 2998.0 365.0 360.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1208343467 2010-10-28 The location has been built and G&H Drilling is starting to move in.
1291045342 2010-11-19 Witness pit solidification. Chemtech delivered and applied two loads of dust to the drilling pits. The landowner requested that the stumps be placed in the pits before they are covered over. He also requested that the tank battery be moved approximately 50 feet to the northeast. I advised the operator and the landowner of the minimum spacing requirements that must be met.
-1328418953 2011-07-06 Industry Standard has a contractor on site grading the location and spreading topsoil. The affected area should be ready to seed within a week. The security fencing is up and the well is in production.
-1397008601 2010-11-01 G&H Drilling moved on location this past weekend and spudded the well this morning. The drilling pits were lined, fenced and in good condition. This is an urban location. No violations at this time.
-1399591150 2010-11-02 G&H Drilling is coming out from under surface cement and drilling the 7-7/8 main hole with fresh water. They will drill the well with fluid. The pits are fenced, lined and in good condition. No violations at this time.
-1654383073 2010-11-16 The drilling pits have been pumped down, are still lined and fenced. Solidification is scheduled for 11/19.
1663160904 2010-10-27 The drilling location is being built. The rig is scheduled to arrive later this week.
1910749422 2011-12-14 Preliminary Restoration is approved.
1971344387 2011-03-04 Status check inspection found that the pump jack was installed and pumping. The fence has been installed around the tank battery but not around the wellhead. I called Tim Levengood and told him to shut the well down until all of the fence was installed. There is also a question as to the legality of one of the leases in this unit. Columbus has requested but not yet received additional documentation from ISSI.
239164036 2010-11-04 G&H is drilling ahead on fluid. The pits are fenced, lined and in good condition.
791218496 2011-01-25 A pump jack has not yet been set on the well which has been equipped with rods. The tank battery is being constructed. The required security fence has not been started but will need to be completed before turn on. No indication from the company as to when the well will be ready for turned on. Preliminary restoration is due this spring.
-969722324 2010-12-22 The well has been fraced and the tank battery has been built. ISSI still needs to set a pump jack and install the security fencing before turn on.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.