| Well ID: 34-115-24671
 
| Well ID: 34-115-24671
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.7309057302, -81.914182259 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.73090573, -81.91418226 | width=100% | height=100% }}  
 
|-
 
|-
| County:
+
| County: [[Morgan County, Ohio|Morgan]]
 
|-
 
|-
| Municipality:
+
| Municipality:  
 
|-
 
|-
| Operator Name:
+
| Operator Name: [[ARTEX OIL COMPANY]]
 
|-
 
|-
| Well Pad ID:
+
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:
+
| Farm/Lease Name:  
 
|-
 
|-
| First Permit Date:
+
| First Permit Date:  
 
|-
 
|-
| Last Permit Date:
+
| Last Permit Date:  
 
|-
 
|-
 
| Spud Date: 2013-03-15
 
| Spud Date: 2013-03-15
 
|-
 
|-
| Unconventional:
+
| Unconventional: No
 
|-
 
|-
| Horizontal:
+
| Configuration: Vertical
 
|-
 
|-
| Producing: No
+
| Well Status: Producing
 
|-
 
|-
 
| Violations: 0
 
| Violations: 0
 
|-
 
|-
| Latitude: 39.7309057302
+
| Latitude: 39.73090573
 
|-
 
|-
| Longitude: -81.914182259
+
| Longitude: -81.91418226
 
|-
 
|-
 
|}
 
|}
Line 43: Line 43:
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 +
|-
 +
| 2013-0
 +
| style="text-align:right;" | 0.0
 +
|
 +
|
 +
|
 +
| style="text-align:right;" | 21.0
 +
|
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 30098.0
 +
| style="text-align:right;" | 365.0
 +
|
 +
|
 +
| style="text-align:right;" | 639.0
 +
| style="text-align:right;" | 365.0
 +
|-
 
|}
 
|}
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Ohio Department of Natural Resources RBDMS
!scope="col" | PERIOD
+
| publisher = [http://oilandgas.ohiodnr.gov/]
!scope="col" | TYPE
+
| date = 2015-06-19
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
!scope="col" | UNITS
+
| accessdate = 2015-06-20 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 64: Line 76:
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION CODE
!scope="col" | VIOLATION_COMMENT
+
!scope="col" | VIOLATION COMMENT
 
|-
 
|-
 
| 1363295307
 
| 1363295307
 
| 2013-03-14
 
| 2013-03-14
|
+
|  
| I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4" hole to a TD of 739'. The casing shoe depth was 687'. Centralizers were not run on the surface casing and the baffle insert was at a depth of 654'. There was an issue with casing length which did not allow enough room for wellhead and placement of the BOP. Operator had to head to Logan for a pup joint. Formation cement on location. Once the pup joint arrived and was connected to the casing, formation set up and began cement job. The plug was down at 9:21pm with good cement returns, and casing pressure was held at 600 psi for 5 minutes.
+
| I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 739'. The casing shoe depth was 687'. Centralizers were not run on the surface casing and the baffle insert was at a depth of 654'. There was an issue with casing length which did not allow enough room for wellhead and placement of the BOP. Operator had to head to Logan for a pup joint. Formation cement on location. Once the pup joint arrived and was connected to the casing, formation set up and began cement job. The plug was down at 9:21pm with good cement returns, and casing pressure was held at 600 psi for 5 minutes.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1369850646
 
| 1369850646
 
| 2013-05-29
 
| 2013-05-29
|
+
|  
 
| Contract dozer operator was on location grading the access road. He previously graded the wellhead location. I went back to well location and the operator had filled the pit and graded the area. I will come back when operator is finished with restoration.
 
| Contract dozer operator was on location grading the access road. He previously graded the wellhead location. I went back to well location and the operator had filled the pit and graded the area. I will come back when operator is finished with restoration.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 1492187248
 
| 1492187248
 
| 2013-04-03
 
| 2013-04-03
|
+
|  
 
| All drilling equipment has been removed from location. There is still an open pit filled with drilling fluid. Well was logged on Sunday and Artex has not yet stimulated well.
 
| All drilling equipment has been removed from location. There is still an open pit filled with drilling fluid. Well was logged on Sunday and Artex has not yet stimulated well.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 172534849
 
| 172534849
 
| 2013-06-18
 
| 2013-06-18
|
+
|  
 
| Artex had dug ditches for the placement of the production lines and there was straw stacked on location. They are in the process of seeding and mulching the lcoation.
 
| Artex had dug ditches for the placement of the production lines and there was straw stacked on location. They are in the process of seeding and mulching the lcoation.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 587186355
 
| 587186355
 
| 2013-10-30
 
| 2013-10-30
|
+
|  
 
| Preliminary restoration is passed in accordance to 1509.072.
 
| Preliminary restoration is passed in accordance to 1509.072.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|-
 
|-
 
| 603729202
 
| 603729202
 
| 2013-06-03
 
| 2013-06-03
|
+
|  
 
| I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artex's most recently drilled wells. The access road and well location have been recently graded and the operator will be out in the next few weeks to disc till, seed and mulch the access road and well location.
 
| I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artex's most recently drilled wells. The access road and well location have been recently graded and the operator will be out in the next few weeks to disc till, seed and mulch the access road and well location.
|
+
|  
|
+
|  
|
+
|  
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Ohio Department of Natural Resources RBDMS
 +
| publisher = [http://oilandgas.ohiodnr.gov/]
 +
| date = 2015-06-19
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 +
| accessdate = 2015-06-20 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 13:20, 16 July 2015

Well Details

Well ID: 34-115-24671
Loading map...
County: Morgan
Municipality:
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-03-15
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.73090573
Longitude: -81.91418226

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 0.0 21.0
2014-0 30098.0 365.0 639.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1363295307 2013-03-14 I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 739'. The casing shoe depth was 687'. Centralizers were not run on the surface casing and the baffle insert was at a depth of 654'. There was an issue with casing length which did not allow enough room for wellhead and placement of the BOP. Operator had to head to Logan for a pup joint. Formation cement on location. Once the pup joint arrived and was connected to the casing, formation set up and began cement job. The plug was down at 9:21pm with good cement returns, and casing pressure was held at 600 psi for 5 minutes.
1369850646 2013-05-29 Contract dozer operator was on location grading the access road. He previously graded the wellhead location. I went back to well location and the operator had filled the pit and graded the area. I will come back when operator is finished with restoration.
1492187248 2013-04-03 All drilling equipment has been removed from location. There is still an open pit filled with drilling fluid. Well was logged on Sunday and Artex has not yet stimulated well.
172534849 2013-06-18 Artex had dug ditches for the placement of the production lines and there was straw stacked on location. They are in the process of seeding and mulching the lcoation.
587186355 2013-10-30 Preliminary restoration is passed in accordance to 1509.072.
603729202 2013-06-03 I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artex's most recently drilled wells. The access road and well location have been recently graded and the operator will be out in the next few weeks to disc till, seed and mulch the access road and well location.

For data sources see[2]