If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-089-26139 | | Well ID: 34-089-26139 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.10400108, -82.56472134 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Licking County, Ohio|Licking]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[KNOX ENERGY INC.]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2014-06-09 | | Spud Date: 2014-06-09 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | | + | | Well Status: Plugged and Abandoned |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.10400108 |
|- | |- | ||
− | | Longitude: -82. | + | | Longitude: -82.56472134 |
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
+ | |- | ||
+ | | -1089078052 | ||
+ | | 2014-10-09 | ||
+ | | | ||
+ | | This inspection was conducted as a preliminary restoration status check. The well is located in a crop field. The pits have been closed and drilling rig equipment removed. The area around the well has been restored. The well is not in production. Inspection meets ORC 1509.072 requirements. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1177720181 | ||
+ | | 2014-06-10 | ||
+ | | | ||
+ | | I inspected drilling operations today. Kilbarger rig #5 spudded on 6/9/2014. Depth was approximately 200 feet. The pit was properly lined and permit displayed. The rig was broke down during inspection. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
|- | |- | ||
| -1311396693 | | -1311396693 | ||
| 2014-06-11 | | 2014-06-11 | ||
− | | | + | | |
| I inspected drilling operations. Kilbarger rig #5 drilling on fluid during inspection. The depth was approximately 530 feet. No violations. | | I inspected drilling operations. Kilbarger rig #5 drilling on fluid during inspection. The depth was approximately 530 feet. No violations. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 1497253187 | ||
+ | | 2014-06-23 | ||
+ | | | ||
+ | | Berry Well service was on site with Cemenco Cementing to plug this well back to produce the Clinton formation. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -153983706 | | -153983706 | ||
| 2014-06-09 | | 2014-06-09 | ||
− | | | + | | |
| I inspected this drilling location today. Kilbarger was building the location during inspection in preparation for Kilbarger rig #5. | | I inspected this drilling location today. Kilbarger was building the location during inspection in preparation for Kilbarger rig #5. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | -1576511120 | ||
+ | | 2015-05-21 | ||
+ | | | ||
+ | | Inspect location as part of a production well status check accompanied by Division intern Brittany Hupp. The well was not hooked up for production. The well has a 4.5 plug in the casing. Time of inspection: 1:55 PM. Weather: 57*F, Cloudy | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -1613201218 | | -1613201218 | ||
| 2014-06-12 | | 2014-06-12 | ||
− | | | + | | |
| I witnessed the BOP test on Kilbarger rig #5. Kilbarger pressured up to 600 lbs. and the test passed. | | I witnessed the BOP test on Kilbarger rig #5. Kilbarger pressured up to 600 lbs. and the test passed. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -1774627481 | | -1774627481 | ||
| 2014-06-16 | | 2014-06-16 | ||
− | | | + | | |
| I inspected drilling operations today. Kilbarger rig #5 drilling on air during inspection. The depth was approximately 4200 feet. The inspection revealed that the well was a dry hole. Knox Energy will plug this well back to produce the Clinton. | | I inspected drilling operations today. Kilbarger rig #5 drilling on air during inspection. The depth was approximately 4200 feet. The inspection revealed that the well was a dry hole. Knox Energy will plug this well back to produce the Clinton. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -1984405386 | | -1984405386 | ||
| 2014-07-21 | | 2014-07-21 | ||
− | | | + | | |
| This inspection was conducted as a status check. There was no activity during inspection. The pits have been closed and drilling equipment removed. No violations. | | This inspection was conducted as a status check. There was no activity during inspection. The pits have been closed and drilling equipment removed. No violations. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|- | |- | ||
| 760393425 | | 760393425 | ||
| 2014-06-11 | | 2014-06-11 | ||
− | | | + | | |
− | | I witnessed the cementing of the 8 | + | | I witnessed the cementing of the 8 surface casing on Kilbarger rig #5 for Knox Energy. Donnie with Knox Energy was on location. Petroset Cementing was contracted to cement the casing. Petroset broke circulation and good cement returns were observed. A cement basket was not used. |
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| 934566185 | | 934566185 | ||
| 2014-06-24 | | 2014-06-24 | ||
− | | | + | | |
| Cemenco cementing was on site to cement the 4 1/2 production casing after plugging back to the Clinton formation. | | Cemenco cementing was on site to cement the 4 1/2 production casing after plugging back to the Clinton formation. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-089-26139 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.10400108,"lon":-82.56472134,"icon":""}]} |
County: Licking | |
Municipality: | |
Operator Name: KNOX ENERGY INC. | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-06-09 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Plugged and Abandoned | |
Violations: 0 | |
Latitude: 40.10400108 | |
Longitude: -82.56472134 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1089078052 | 2014-10-09 | This inspection was conducted as a preliminary restoration status check. The well is located in a crop field. The pits have been closed and drilling rig equipment removed. The area around the well has been restored. The well is not in production. Inspection meets ORC 1509.072 requirements. | ||||
1177720181 | 2014-06-10 | I inspected drilling operations today. Kilbarger rig #5 spudded on 6/9/2014. Depth was approximately 200 feet. The pit was properly lined and permit displayed. The rig was broke down during inspection. | ||||
-1311396693 | 2014-06-11 | I inspected drilling operations. Kilbarger rig #5 drilling on fluid during inspection. The depth was approximately 530 feet. No violations. | ||||
1497253187 | 2014-06-23 | Berry Well service was on site with Cemenco Cementing to plug this well back to produce the Clinton formation. | ||||
-153983706 | 2014-06-09 | I inspected this drilling location today. Kilbarger was building the location during inspection in preparation for Kilbarger rig #5. | ||||
-1576511120 | 2015-05-21 | Inspect location as part of a production well status check accompanied by Division intern Brittany Hupp. The well was not hooked up for production. The well has a 4.5 plug in the casing. Time of inspection: 1:55 PM. Weather: 57*F, Cloudy | ||||
-1613201218 | 2014-06-12 | I witnessed the BOP test on Kilbarger rig #5. Kilbarger pressured up to 600 lbs. and the test passed. | ||||
-1774627481 | 2014-06-16 | I inspected drilling operations today. Kilbarger rig #5 drilling on air during inspection. The depth was approximately 4200 feet. The inspection revealed that the well was a dry hole. Knox Energy will plug this well back to produce the Clinton. | ||||
-1984405386 | 2014-07-21 | This inspection was conducted as a status check. There was no activity during inspection. The pits have been closed and drilling equipment removed. No violations. | ||||
760393425 | 2014-06-11 | I witnessed the cementing of the 8 surface casing on Kilbarger rig #5 for Knox Energy. Donnie with Knox Energy was on location. Petroset Cementing was contracted to cement the casing. Petroset broke circulation and good cement returns were observed. A cement basket was not used. | ||||
934566185 | 2014-06-24 | Cemenco cementing was on site to cement the 4 1/2 production casing after plugging back to the Clinton formation. |
For data sources see[1]