If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-067-21083 | | Well ID: 34-067-21083 | ||
| − | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.21603287, -80.91424521 | width=100% | height=100% }} |
|- | |- | ||
| − | | County: | + | | County: [[Harrison County, Ohio|Harrison]] |
|- | |- | ||
| − | | Municipality: | + | | Municipality: |
|- | |- | ||
| − | | Operator Name: | + | | Operator Name: [[HESS OHIO DEVELOPMENTS LLC]] |
|- | |- | ||
| − | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
| − | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
| − | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
| − | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2013-01-10 | | Spud Date: 2013-01-10 | ||
|- | |- | ||
| − | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
| − | | | + | | Configuration: Vertical |
|- | |- | ||
| − | | | + | | Well Status: |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
| − | | Latitude: 40. | + | | Latitude: 40.21603287 |
|- | |- | ||
| − | | Longitude: -80. | + | | Longitude: -80.91424521 |
|- | |- | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
|} | |} | ||
== Inspection Data == | == Inspection Data == | ||
| Line 64: | Line 42: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
| − | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
|- | |- | ||
| 1358169053 | | 1358169053 | ||
| 2012-01-13 | | 2012-01-13 | ||
| − | | | + | | |
| I am on site today because the Auger Drill rig has encountered a problem. During the drilling of the 36 inch conductor hole they hit a rubble pile from the old coal mine. The hole has colapsed and we are cementing it back. Halliburton is on site and could only get cement back to 25 ft from surface. The Auger Drilling rig plans to drill out the cement in the morning after repairs to the rig have been completed. After drilling out the cement the conductor and the Tin Horn will be set and cemented to surface. | | I am on site today because the Auger Drill rig has encountered a problem. During the drilling of the 36 inch conductor hole they hit a rubble pile from the old coal mine. The hole has colapsed and we are cementing it back. Halliburton is on site and could only get cement back to 25 ft from surface. The Auger Drilling rig plans to drill out the cement in the morning after repairs to the rig have been completed. After drilling out the cement the conductor and the Tin Horn will be set and cemented to surface. | ||
| − | | | + | | |
| − | | | + | | |
| − | | | + | | |
|- | |- | ||
|- | |- | ||
| 1358447676 | | 1358447676 | ||
| 2013-01-17 | | 2013-01-17 | ||
| − | | | + | | |
| I am on site today to witness the plugging of the 36 inch conductor hole. During the installation of the 30 inch diameter casing it broke apart. The operator wants to leave the conductor in the well and cement it rather than fish it out. The hole has been drilled so crooked that casing can not be installed so they will cement it and skid the location. I have contacted Steve Opritza and Rocky King to advise of the lost hole. Halliburton is to plug the well. W/O cement trucks to arrive. | | I am on site today to witness the plugging of the 36 inch conductor hole. During the installation of the 30 inch diameter casing it broke apart. The operator wants to leave the conductor in the well and cement it rather than fish it out. The hole has been drilled so crooked that casing can not be installed so they will cement it and skid the location. I have contacted Steve Opritza and Rocky King to advise of the lost hole. Halliburton is to plug the well. W/O cement trucks to arrive. | ||
| − | | | + | | |
| − | | | + | | |
| − | | | + | | |
|- | |- | ||
|- | |- | ||
| 1359049423 | | 1359049423 | ||
| 2013-01-20 | | 2013-01-20 | ||
| − | | | + | | |
| I arrived on this location to witness the cementing of the conductor pipe. The borehole was drilled crooked which caused the 30 inch conductor pipe to break. | | I arrived on this location to witness the cementing of the conductor pipe. The borehole was drilled crooked which caused the 30 inch conductor pipe to break. | ||
| − | | | + | | |
| − | | | + | | |
| − | | | + | | |
|- | |- | ||
|- | |- | ||
| 1359053591 | | 1359053591 | ||
| 2013-01-19 | | 2013-01-19 | ||
| − | | | + | | |
| I arrived on this location to witness the grouting of the conductor hole with ready-mix. 20 tons of fireclay have been placed in borehole to plug formation so cement will seal off and come to surface. Tarr redi-mix grouted well with 50 yards of 9 sack grout and did get cement to surface. I was on site from 7:30am until 10:30 am at which time I had to leave because I was out of hours. Job was completed at noon. Inspector Moreland will pick up cement tickets on 01/23/0213. | | I arrived on this location to witness the grouting of the conductor hole with ready-mix. 20 tons of fireclay have been placed in borehole to plug formation so cement will seal off and come to surface. Tarr redi-mix grouted well with 50 yards of 9 sack grout and did get cement to surface. I was on site from 7:30am until 10:30 am at which time I had to leave because I was out of hours. Job was completed at noon. Inspector Moreland will pick up cement tickets on 01/23/0213. | ||
| − | | | + | | |
| − | | | + | | |
| − | | | + | | |
|- | |- | ||
|- | |- | ||
| 1380633440 | | 1380633440 | ||
| 2013-10-01 | | 2013-10-01 | ||
| − | | | + | | |
| Well was plugged and rig was skidded. Site passed preliminary restoration according to 1509.072A. | | Well was plugged and rig was skidded. Site passed preliminary restoration according to 1509.072A. | ||
| − | | | + | | |
| − | | | + | | |
| − | | | + | | |
| + | |- | ||
| + | |- | ||
| + | | -1579286559 | ||
| + | | 2013-10-01 | ||
| + | | | ||
| + | | Permit was cancelled and rig was skidded. Site passed preliminary restoration according to 1509.072A. | ||
| + | | | ||
| + | | | ||
| + | | | ||
|- | |- | ||
|- | |- | ||
| 1931946084 | | 1931946084 | ||
| 2013-01-18 | | 2013-01-18 | ||
| − | | | + | | |
| I arrived on this location to witness the plugging of the conductor hole which is 100 foot deep. The borehole was drilled crooked which made the 30 inch conductor pipe part. The crew can't get the pipe out so the well has to be plugged. Halliburton pumped 825 sacks of class a cement on this date and the cement would only come up 50 foot. Crew is going to put 20 tons of fire clay in to borehole then grout with readymix at a 9sack grout on 01/19/2013. | | I arrived on this location to witness the plugging of the conductor hole which is 100 foot deep. The borehole was drilled crooked which made the 30 inch conductor pipe part. The crew can't get the pipe out so the well has to be plugged. Halliburton pumped 825 sacks of class a cement on this date and the cement would only come up 50 foot. Crew is going to put 20 tons of fire clay in to borehole then grout with readymix at a 9sack grout on 01/19/2013. | ||
| − | | | + | | |
| − | | | + | | |
| − | | | + | | |
|- | |- | ||
|} | |} | ||
| + | For data sources see<ref>{{cite web | ||
| + | | title = Ohio Department of Natural Resources RBDMS | ||
| + | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
| + | | date = 2015-06-19 | ||
| + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
| + | | accessdate = 2015-06-20 }}</ref> | ||
| + | == References == | ||
| + | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] | ||
| Well ID: 34-067-21083 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.21603287,"lon":-80.91424521,"icon":""}]} |
| County: Harrison | |
| Municipality: | |
| Operator Name: HESS OHIO DEVELOPMENTS LLC | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2013-01-10 | |
| Unconventional: No | |
| Configuration: Vertical | |
| Well Status: | |
| Violations: 0 | |
| Latitude: 40.21603287 | |
| Longitude: -80.91424521 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
|---|---|---|---|---|---|---|
| 1358169053 | 2012-01-13 | I am on site today because the Auger Drill rig has encountered a problem. During the drilling of the 36 inch conductor hole they hit a rubble pile from the old coal mine. The hole has colapsed and we are cementing it back. Halliburton is on site and could only get cement back to 25 ft from surface. The Auger Drilling rig plans to drill out the cement in the morning after repairs to the rig have been completed. After drilling out the cement the conductor and the Tin Horn will be set and cemented to surface. | ||||
| 1358447676 | 2013-01-17 | I am on site today to witness the plugging of the 36 inch conductor hole. During the installation of the 30 inch diameter casing it broke apart. The operator wants to leave the conductor in the well and cement it rather than fish it out. The hole has been drilled so crooked that casing can not be installed so they will cement it and skid the location. I have contacted Steve Opritza and Rocky King to advise of the lost hole. Halliburton is to plug the well. W/O cement trucks to arrive. | ||||
| 1359049423 | 2013-01-20 | I arrived on this location to witness the cementing of the conductor pipe. The borehole was drilled crooked which caused the 30 inch conductor pipe to break. | ||||
| 1359053591 | 2013-01-19 | I arrived on this location to witness the grouting of the conductor hole with ready-mix. 20 tons of fireclay have been placed in borehole to plug formation so cement will seal off and come to surface. Tarr redi-mix grouted well with 50 yards of 9 sack grout and did get cement to surface. I was on site from 7:30am until 10:30 am at which time I had to leave because I was out of hours. Job was completed at noon. Inspector Moreland will pick up cement tickets on 01/23/0213. | ||||
| 1380633440 | 2013-10-01 | Well was plugged and rig was skidded. Site passed preliminary restoration according to 1509.072A. | ||||
| -1579286559 | 2013-10-01 | Permit was cancelled and rig was skidded. Site passed preliminary restoration according to 1509.072A. | ||||
| 1931946084 | 2013-01-18 | I arrived on this location to witness the plugging of the conductor hole which is 100 foot deep. The borehole was drilled crooked which made the 30 inch conductor pipe part. The crew can't get the pipe out so the well has to be plugged. Halliburton pumped 825 sacks of class a cement on this date and the cement would only come up 50 foot. Crew is going to put 20 tons of fire clay in to borehole then grout with readymix at a 9sack grout on 01/19/2013. |