X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-22223"

m
m
Line 517: Line 517:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 
  | accessdate = 2015-05-27 }}</ref>
 
  | accessdate = 2015-05-27 }}</ref>
 +
[[Category:Has Chemical Data]]
 +
==Chemical Data==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | HF Fluid Concentration
 +
!scope="col" | Ingredient
 +
!scope="col" | Additive Concentration
 +
!scope="col" | Trade Name
 +
!scope="col" | Purpose
 +
!scope="col" | CAS number
 +
!scope="col" | Supplier
 +
|-
 +
| 78.0
 +
| 4
 +
| 51200.0
 +
| MC B-8520
 +
| Antibacterial Agent
 +
| 4-Dimethyloxazolidin
 +
| Multichem
 +
|-
 +
|-
 +
| 75673.0
 +
| 3
 +
| 4.0
 +
| MC B-8520
 +
| Antibacterial Agent
 +
| 4
 +
| Multichem
 +
|-
 +
|-
 +
| 9e-05
 +
| Formaldehyde Amine
 +
| 0.5
 +
| MC B-8520
 +
| Antibacterial Agent
 +
| 56652-26-7
 +
| Multichem
 +
|-
 +
|-
 +
| 0.00018
 +
| 2-Amino-2-methyl-1-propanol
 +
| 1.0
 +
| MC B-8520
 +
| Antibacterial Agent
 +
| 124-68-5
 +
| Multichem
 +
|-
 +
|-
 +
| 0.02564
 +
| HCL
 +
| 37.0
 +
| 37% HCL
 +
| Cleans Perforation
 +
| 7647-01-0
 +
| FracTech
 +
|-
 +
|-
 +
| 0.00383
 +
| Glutaraldehyde
 +
| 50.0
 +
| MC B-8650
 +
| Antibacterial Agent
 +
| 111-30-8
 +
| Multichem
 +
|-
 +
|-
 +
| 4e-05
 +
| Methanol
 +
| 0.5
 +
| MC B-8650
 +
| Antibacterial Agent
 +
| 67-56-1
 +
| Multichem
 +
|-
 +
|-
 +
| 0.00054
 +
| Methanol
 +
| 95.0
 +
| CI-100
 +
| Corrosion Inhibitor
 +
| 67-56-1
 +
| FracTech
 +
|-
 +
|-
 +
| 3e-05
 +
| Propargyl Alcohol
 +
| 5.0
 +
| CI-100
 +
| Corrosion Inhibitor
 +
| 107-19-7
 +
| FracTech
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web | title = FracFocus Chemical Disclosure Registry |publisher = [http://www.fracfocusdata.org/DisclosureSearch/]| date = 2015-08-10 | url = http://wellwiki.org/wiki/Well_Chemicals_Data_Sources | accessdate = 2015-08-10 }}</ref>
 
== References ==
 
== References ==
 
{{reflist}}
 
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 00:01, 20 August 2015

Well Details

Well ID: 37-003-22223
Loading map...
County: Allegheny
Municipality: Frazer Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 149247
Farm/Lease Name: SCHILLER GERALD UNIT 2H
First Permit Date: 2012-05-04
Last Permit Date: 2012-05-04
Spud Date: 2012-07-01
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.616133
Longitude: -79.786625

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 388595.91 100.0 0.0 0.0 0.0 0.0
2013-2 458203.76 184.0 0.0 0.0 0.0 0.0
2014-1 261646.49 176.0 0.0 0.0 0.0 0.0
2014-2 248475.04 184.0 0.0 0.0 0.0 0.0
2015-02 31399.35 28.0 0.0 0.0 0.0 0.0
2015-01 35443.46 31.0 0.0 0.0 0.0 0.0
2015-03 33826.26 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 DRILL CUTTINGS 232.55 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2012-2 DRILL CUTTINGS 550.73 Tons LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2012-2 DRILL CUTTINGS 261.07 Tons LANDFILL 100280 VALLEY LANDFILL IRWIN PA
2012-2 DRILLING FLUID WASTE 860.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-1 DRILLING FLUID WASTE 23.81 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-1 FLOWBACK FRACTURING SAND 11.18 Tons RESIDUAL WASTE TRANSFER FACILITY PAD980707442 WEAVERTOWN TRANSPORTATION LEASING INC MCDONALD PA
2013-1 FRACING FLUID WASTE 8.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-1 PRODUCED FLUID 5.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FLOWBACK FRACTURING SAND 1.18 Tons RESIDUAL WASTE TRANSFER FACILITY PAD980707442 WEAVERTOWN TRANSPORTATION LEASING INC MCDONALD PA
2014-1 PRODUCED FLUID 317.79 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005 RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER PA
2014-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 FRACING FLUID WASTE 6.43 Bbl RESIDUAL WASTE TRANSFER FACILITY PAD980707442 WEAVERTOWN TRANSPORTATION LEASING INC MCDONALD PA
2014-2 PRODUCED FLUID 136.44 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2014-2 PRODUCED FLUID 952.31 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2074461 2012-05-31 No Violations Noted THE SITE IS UNDER CONSTRUCTION. E&S CONTROLS ARE IN PLACE.
2075948 2012-06-14 No Violations Noted John Ley, Water Quality Specialist, SWRO was on site to conduct an inspection. the site sign was in place and showed the proper permitting information. the E&S controls and BMP's were in place and constructed according to plan. The access road berms and soil stock pile had been stabilized. The pad was still under construction. The only issue was that the ICT drainage ditches at the bottom of the site slopes were filling up with soil boulders that had rolled down the slope as the pad was being constructed. These runoff ditches should be cleared.
2078636 2012-06-25 No Violations Noted John Ley, Water Quality Specialist, SWRO was on site to conduct a pre-operational inspection. The site sign was in place and showed the proper permitting information. The E&S controls and BMP's were in place and constructed according to plan. The access road berms had been stabilized. Additional work was taking place on the soil pile. The pad was still under construction.

The previous minor issue mentioned in the June 15th report dealing with the ICT drainage ditches at the bottom of the fill slopes was rectified. All the boulders have been removed and the ditches were dressed up. They will have rock added once the fill slope construction is completed.

2085861 2012-07-24 No Violations Noted TOP HOLE TD @ 6,400'. WELL IS BEING LOGGED.
2085903 2012-07-19 No Violations Noted RIG IS DOWN FOR 133/8" CEMENT TIME.
2093390 2012-07-31 No Violations Noted TOP HOLE DRILLING COMPLETE AT 6400'.

THE SITE IS IN GOOD SHAPE.

2096725 2012-08-28 No Violations Noted TOP HOLE IS COMPLETE AND A KOP HAS BEEN SET.
2097731 2012-09-05 No Violations Noted John Ley, WQS, SWRO was on site to conduct a routine inspection. At the time of the inspection, the well sign, E&S plan, and well permit were on site. BMP's installed were functioning according to the E&S plan. Hillsides were temporarily stabilized and had good growth on them. No accelerated erosion or sedimentation issues were observed on site or on the gated access road. Silt sock in the lower field will be removed to allow for mowing of the field.
The site had verticals drilled but drilling the wells was not complete.  The site had temporary reservoirs constructed that were being filled with fresh water to be used to frac the Bakerstown Road site.  When this operation has been completed, and the reservoirs removed, drilling will continue at this site.
2106806 2012-10-10 No Violations Noted
2116887 2012-11-06 No Violations Noted PAD GETTING PREP FOR BOTTOM HOLE RIG.
2124788 2012-12-04 No Violations Noted PRECISION 158 DRILLING CURVE. THE SITE IS OK.
2130161 2013-01-10 No Violations Noted John Ley WQS, SWRO was on site to conduct a routine inspection. At the time of this inspection, the well sign, E&S plan, and the PPC plan were onsite. The site was gated for security. The wells were drilled and equipment had been removed. The ground around the site was snow covered but there did not appear to be any accelerated erosion or sedimentation issues.
2131214 2013-01-08 No Violations Noted BOTTOM HOLE COMPLETE. WELL IS NOT FRACED. RIG IS GONE.
2143089 2013-02-25 No Violations Noted DRILLING COMPLETE AND READY TO FRAC. FRAC EQUIPTMENT ON PAD FRACING 4H. SITE IS GOOD.
2146654 2013-03-06 No Violations Noted FIVE WELLS ON THIS PAD ARE BEING FRACED.
2156466 2013-04-02 No Violations Noted THE WELL IS BEING PREPARED FOR FLOWBACK. THE SITE IS IN GOOD CONDITION.
2165007 2013-04-18 No Violations Noted WELL IS FRACED. EQUIPTMENT SET FOR PRODUCTION. THE SITE IS OK.
2173330 2013-05-20 No Violations Noted This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2173310). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent. Production fluids were contained and no leaks to the environment were evident.
2195560 2013-08-13 No Violations Noted This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2195548). Temporary stabilization appeared adequate. No erosion or sedimentation issues were apparent. Production fluids were contained and no leaks to the environment were evident. Site restoration extension has been granted until September 28, 2015.
2231269 2013-12-19 No Violations Noted This well was inspected concurrently with ESX12-003-0003 Schiller 1-6H Well Site, Site 759251 (inspection record 2231267). Site was snow covered at time of inspection. No erosion or sedimentation issues were apparent. Production fluids were contained; no leaks to the environment were evident. Site restoration extension was previously granted an extension until September 28, 2015.
2310015 2014-10-03 No Violations Noted This site's restoration date was previously extended to September 28

For data sources see[3]

Chemical Data

HF Fluid Concentration Ingredient Additive Concentration Trade Name Purpose CAS number Supplier
78.0 4 51200.0 MC B-8520 Antibacterial Agent 4-Dimethyloxazolidin Multichem
75673.0 3 4.0 MC B-8520 Antibacterial Agent 4 Multichem
9e-05 Formaldehyde Amine 0.5 MC B-8520 Antibacterial Agent 56652-26-7 Multichem
0.00018 2-Amino-2-methyl-1-propanol 1.0 MC B-8520 Antibacterial Agent 124-68-5 Multichem
0.02564 HCL 37.0 37% HCL Cleans Perforation 7647-01-0 FracTech
0.00383 Glutaraldehyde 50.0 MC B-8650 Antibacterial Agent 111-30-8 Multichem
4e-05 Methanol 0.5 MC B-8650 Antibacterial Agent 67-56-1 Multichem
0.00054 Methanol 95.0 CI-100 Corrosion Inhibitor 67-56-1 FracTech
3e-05 Propargyl Alcohol 5.0 CI-100 Corrosion Inhibitor 107-19-7 FracTech

For data sources see[4]

References