X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0074163105003"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0074163105003
 
| Well ID: 0074163105003
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.60539600000004157, -112.17102599999998347 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.605396, -112.171026 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/05-31-007-16W4/3
 
| Location: 00/05-31-007-16W4/3
 +
|-
 +
| Location Alias: 00/05-31-07-16 W4M
 +
|-
 +
| Location Alias 2: 00/05-31-007-16 W4/03
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Municipal District of Taber,_Alberta|Municipal District of Taber]]
 
|-
 
|-
 
| Well Name: ZARGON ET AL TABERS 5-31-7-16
 
| Well Name: ZARGON ET AL TABERS 5-31-7-16
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0152070
 
|-
 
|-
 
| License Date: 1992-03-23
 
| License Date: 1992-03-23
 
|-
 
|-
| Final Drilling Date: 1992-04-16
+
| License Status: Issued
 +
|-
 +
| Spud Date: 1992-03-30
 +
|-
 +
| Final Drill Date: 1992-04-16
 +
|-
 +
| Well Total Depth: 1182 m
 +
|-
 +
| Surface Hole Latitude: 49.605396
 +
|-
 +
| Surface Hole Longitude: -112.171026
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 1992-04-11
 +
| style="text-align: right;" | 425
 +
 
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1992-06-02
 +
| Perforation
 +
| style="text-align: right;" | 1133
 +
| style="text-align: right;" | 1135.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1992-06-02
 +
| Perforation
 +
| style="text-align: right;" | 1137
 +
| style="text-align: right;" | 1139
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1992-06-06
 +
| Acid Treatment
 +
| style="text-align: right;" | 1133
 +
| style="text-align: right;" | 1139
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 1182.0m
+
| 1994-07-26
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1133
 +
| style="text-align: right;" | 1139
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 1994-07-31
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 1153
 +
| style="text-align: right;" | 1155
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Abandoned Zone
+
| 1994-07-31
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 1155.5
 +
| style="text-align: right;" | 1157.5
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 1994-07-31
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 1158.5
 +
| style="text-align: right;" | 1160
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Horizontal
+
| 1994-08-04
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 1153
 +
| style="text-align: right;" | 1160
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 49.60539600000004157
+
| 1994-08-06
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 1153
 +
| style="text-align: right;" | 1160
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -112.17102599999998347
+
| 1994-08-06
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 1153
 +
| style="text-align: right;" | 1160
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 1994-08-12
 +
| Casing Patch
 +
| style="text-align: right;" | 1133
 +
| style="text-align: right;" | 1139
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-11-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1147
 +
| style="text-align: right;" | 1150
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-11-16
 +
| Perforation
 +
| style="text-align: right;" | 1136
 +
| style="text-align: right;" | 1139
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-11-16
 +
| Perforation
 +
| style="text-align: right;" | 1133
 +
| style="text-align: right;" | 1136
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-11-20
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 1133
 +
| style="text-align: right;" | 1139
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2002-01-10
 +
| Chemical Squeeze
 +
| style="text-align: right;" | 1133
 +
| style="text-align: right;" | 1139
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1994
 +
| style="text-align: right;" | 3537
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 282.0
 +
|-
 +
| 1995
 +
| style="text-align: right;" | 7996
 +
| style="text-align: right;" | 2.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 160.5
 +
|-
 +
| 1996
 +
| style="text-align: right;" | 7099
 +
| style="text-align: right;" | 14.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 157.0
 +
|-
 +
| 1997
 +
| style="text-align: right;" | 8518
 +
| style="text-align: right;" | 16.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 175.0
 +
|-
 +
| 1998
 +
| style="text-align: right;" | 2879
 +
| style="text-align: right;" | 1.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 43.3
 +
|-
 +
| 1999
 +
| style="text-align: right;" | 3264
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 100.0
 +
|-
 +
| 2000
 +
| style="text-align: right;" | 7966
 +
| style="text-align: right;" | 13.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 196.4
 +
|-
 +
| 2001
 +
| style="text-align: right;" | 7237
 +
| style="text-align: right;" | 15.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 138.5
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 16:31, 5 June 2019

Well Details

Well ID: 0074163105003
Loading map...
Location: 00/05-31-007-16W4/3
Location Alias: 00/05-31-07-16 W4M
Location Alias 2: 00/05-31-007-16 W4/03
Province: Alberta
County/Municipality: Municipal District of Taber
Well Name: ZARGON ET AL TABERS 5-31-7-16
Operator Name:
License Number: 0152070
License Date: 1992-03-23
License Status: Issued
Spud Date: 1992-03-30
Final Drill Date: 1992-04-16
Well Total Depth: 1182 m
Surface Hole Latitude: 49.605396
Surface Hole Longitude: -112.171026

For data sources see[1][2]

Directional Drilling

Start Date Depth (m) Reason
1992-04-11 425

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-06-02 Perforation 1133 1135.5 13
1992-06-02 Perforation 1137 1139 13
1992-06-06 Acid Treatment 1133 1139 0
1994-07-26 Cement Squeeze 1133 1139 0
1994-07-31 Hydra Jet Perforation 1153 1155 0
1994-07-31 Hydra Jet Perforation 1155.5 1157.5 0
1994-07-31 Hydra Jet Perforation 1158.5 1160 0
1994-08-04 Chemical Squeeze 1153 1160 0
1994-08-06 Chemical Squeeze 1153 1160 0
1994-08-06 Chemical Squeeze 1153 1160 0
1994-08-12 Casing Patch 1133 1139 0
2001-11-16 Packing Device Capped w/Cement 1147 1150 0
2001-11-16 Perforation 1136 1139 17
2001-11-16 Perforation 1133 1136 17
2001-11-20 Chemical Squeeze 1133 1139 0
2002-01-10 Chemical Squeeze 1133 1139 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3537 0.0 0.0 282.0
1995 7996 2.9 0.0 160.5
1996 7099 14.0 0.0 157.0
1997 8518 16.5 0.0 175.0
1998 2879 1.8 0.0 43.3
1999 3264 0.0 0.0 100.0
2000 7966 13.0 0.0 196.4
2001 7237 15.4 0.0 138.5

For data sources see[5]

References