X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0524263416000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0524263416000
 
| Well ID: 0524263416000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.53931099999999788, -113.74126300000000356 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.539311, -113.741263 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-34-052-26W4/0
 
| Location: 00/16-34-052-26W4/0
 
|-
 
|-
| Well Name: 1107882 ACC ACHESON 16-34-52-26
+
| Location Alias: 00/16-34-52-26 W4M
 +
|-
 +
| Location Alias 2: 00/16-34-052-26 W4/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Parkland County,_Alberta|Parkland County]]
 +
|-
 +
| Well Name: CEDAR CREEK ACH 16-34-52-26
 +
|-
 +
| Operator Name:
 +
|-
 +
| License Number: 0003378
 
|-
 
|-
 
| License Date: 1951-08-24
 
| License Date: 1951-08-24
 
|-
 
|-
| Final Drilling Date: 1951-10-07
+
| License Status: Issued
 +
|-
 +
| Spud Date: 1951-08-28
 +
|-
 +
| Final Drill Date: 1951-10-07
 +
|-
 +
| Well Total Depth: 1560.3 m
 +
|-
 +
| Surface Hole Latitude: 53.539311
 +
|-
 +
| Surface Hole Longitude: -113.741263
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1951-10-07
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1542.9
 +
| style="text-align: right;" | 1560.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1971-10-29
 +
| Cement Plug
 +
| style="text-align: right;" | 1551.4
 +
| style="text-align: right;" | 1560.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1971-10-29
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1542.9
 +
| style="text-align: right;" | 1551.4
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-10-15
 +
| Cement Plug
 +
| style="text-align: right;" | 1550.2
 +
| style="text-align: right;" | 1551.4
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1975-10-16
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1542.9
 +
| style="text-align: right;" | 1550.2
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-07-30
 +
| Perforation
 +
| style="text-align: right;" | 518
 +
| style="text-align: right;" | 518.3
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1994-07-31
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 518
 +
| style="text-align: right;" | 518.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-08-05
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1517
 +
| style="text-align: right;" | 1525
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1994-08-05
 +
| Perforation
 +
| style="text-align: right;" | 1242
 +
| style="text-align: right;" | 1245.5
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1994-08-07
 +
| Fracture
 +
| style="text-align: right;" | 1242
 +
| style="text-align: right;" | 1245.5
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 1560.3m
+
| 2004-02-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1242
 +
| style="text-align: right;" | 1245.5
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2004-02-27
 +
| Perforation
 +
| style="text-align: right;" | 518
 +
| style="text-align: right;" | 518.3
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Status: Abandoned Zone
+
| 2004-02-27
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 518
 +
| style="text-align: right;" | 518.3
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2004-03-05
 +
| Perforation
 +
| style="text-align: right;" | 1308
 +
| style="text-align: right;" | 1311
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Configuration: Vertical
+
| 2006-02-13
 +
| Perforation
 +
| style="text-align: right;" | 1329.5
 +
| style="text-align: right;" | 1333.2
 +
| style="text-align: right;" | 20
 
|-
 
|-
| Latitude: 53.53931099999999788
+
| 2010-02-13
 +
| Perforation
 +
| style="text-align: right;" | 1319
 +
| style="text-align: right;" | 1321
 +
| style="text-align: right;" | 20
 
|-
 
|-
| Longitude: -113.74126300000000356
+
| 2010-02-27
 +
| Fracture
 +
| style="text-align: right;" | 1329.5
 +
| style="text-align: right;" | 1333.2
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1961
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 3408.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 73.8
 +
|-
 +
| 1962
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 374.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1963
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 339.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1964
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 318.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1965
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 263.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1966
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 284.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1967
 +
| style="text-align: right;" | 4912
 +
| style="text-align: right;" | 311.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1968
 +
| style="text-align: right;" | 4940
 +
| style="text-align: right;" | 313.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1969
 +
| style="text-align: right;" | 5807
 +
| style="text-align: right;" | 680.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1970
 +
| style="text-align: right;" | 6026
 +
| style="text-align: right;" | 492.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1971
 +
| style="text-align: right;" | 4834
 +
| style="text-align: right;" | 435.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1972
 +
| style="text-align: right;" | 4466
 +
| style="text-align: right;" | 522.8
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1973
 +
| style="text-align: right;" | 4836
 +
| style="text-align: right;" | 886.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 18.0
 +
|-
 +
| 1974
 +
| style="text-align: right;" | 4533
 +
| style="text-align: right;" | 1050.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 23.4
 +
|-
 +
| 1975
 +
| style="text-align: right;" | 5963
 +
| style="text-align: right;" | 1179.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 1319.9
 +
|-
 +
| 1976
 +
| style="text-align: right;" | 4989
 +
| style="text-align: right;" | 1235.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 31.3
 +
|-
 +
| 1977
 +
| style="text-align: right;" | 5596
 +
| style="text-align: right;" | 1209.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 18.6
 +
|-
 +
| 1978
 +
| style="text-align: right;" | 5248
 +
| style="text-align: right;" | 1038.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 120.9
 +
|-
 +
| 1979
 +
| style="text-align: right;" | 7949
 +
| style="text-align: right;" | 1038.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 8959.6
 +
|-
 +
| 1980
 +
| style="text-align: right;" | 8133
 +
| style="text-align: right;" | 99.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 15287.2
 +
|-
 +
| 1981
 +
| style="text-align: right;" | 8421
 +
| style="text-align: right;" | 35.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 10925.3
 +
|-
 +
| 1982
 +
| style="text-align: right;" | 3889
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 4846.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 15:28, 7 June 2019

Well Details

Well ID: 0524263416000
Loading map...
Location: 00/16-34-052-26W4/0
Location Alias: 00/16-34-52-26 W4M
Location Alias 2: 00/16-34-052-26 W4/00
Province: Alberta
County/Municipality: Parkland County
Well Name: CEDAR CREEK ACH 16-34-52-26
Operator Name:
License Number: 0003378
License Date: 1951-08-24
License Status: Issued
Spud Date: 1951-08-28
Final Drill Date: 1951-10-07
Well Total Depth: 1560.3 m
Surface Hole Latitude: 53.539311
Surface Hole Longitude: -113.741263

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-10-07 Open Hole/Barefoot Completion 1542.9 1560.3 0
1971-10-29 Cement Plug 1551.4 1560.3 0
1971-10-29 Open Hole/Barefoot Completion 1542.9 1551.4 0
1975-10-15 Cement Plug 1550.2 1551.4 0
1975-10-16 Open Hole/Barefoot Completion 1542.9 1550.2 0
1994-07-30 Perforation 518 518.3 13
1994-07-31 Remedial Casing Cementing 518 518.3 0
1994-08-05 Packing Device Capped w/Cement 1517 1525 0
1994-08-05 Perforation 1242 1245.5 13
1994-08-07 Fracture 1242 1245.5 0
2004-02-20 Cement Squeeze 1242 1245.5 0
2004-02-27 Perforation 518 518.3 13
2004-02-27 Remedial Casing Cementing 518 518.3 0
2004-03-05 Perforation 1308 1311 13
2006-02-13 Perforation 1329.5 1333.2 20
2010-02-13 Perforation 1319 1321 20
2010-02-27 Fracture 1329.5 1333.2 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 3408.2 0.0 73.8
1962 0 374.8 0.0 0.0
1963 0 339.7 0.0 0.0
1964 0 318.2 0.0 0.0
1965 0 263.7 0.0 0.0
1966 0 284.3 0.0 0.0
1967 4912 311.5 0.0 0.0
1968 4940 313.9 0.0 0.0
1969 5807 680.1 0.0 0.0
1970 6026 492.9 0.0 0.0
1971 4834 435.4 0.0 0.0
1972 4466 522.8 0.0 0.0
1973 4836 886.2 0.0 18.0
1974 4533 1050.0 0.0 23.4
1975 5963 1179.7 0.0 1319.9
1976 4989 1235.1 0.0 31.3
1977 5596 1209.2 0.0 18.6
1978 5248 1038.9 0.0 120.9
1979 7949 1038.0 0.0 8959.6
1980 8133 99.0 0.0 15287.2
1981 8421 35.1 0.0 10925.3
1982 3889 0.0 0.0 4846.0

For data sources see[4]

References