X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0364250914004"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0364250914004
 
| Well ID: 0364250914004
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.08117800000002262, -113.52142299999997022 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.081178, -113.521423 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/14-09-036-25W4/4
 
| Location: 00/14-09-036-25W4/4
 
|-
 
|-
| Well Name: ECA THREEHCK 14-9-36-25
+
| Location Alias: 00/14-09-36-25 W4M
 +
|-
 +
| Location Alias 2: 00/14-09-036-25 W4/04
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Red Deer County,_Alberta|Red Deer County]]
 +
|-
 +
| Well Name: FORGE THREEHCK 14-9-36-25
 +
|-
 +
| Operator Name: [[Forge Oil & Gas Limited]]
 +
|-
 +
| License Number: 0328246
 
|-
 
|-
 
| License Date: 2005-03-18
 
| License Date: 2005-03-18
 
|-
 
|-
| Final Drilling Date: 2005-04-01
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2005-03-25
 +
|-
 +
| Final Drill Date: 2005-04-01
 +
|-
 +
| Well Total Depth: 2011 m
 +
|-
 +
| Surface Hole Latitude: 52.081178
 +
|-
 +
| Surface Hole Longitude: -113.521423
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2005-06-01
 +
| Perforation
 +
| style="text-align: right;" | 1962.2
 +
| style="text-align: right;" | 1963.2
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Total Depth: 2011.0m
+
| 2005-08-29
 +
| Fracture
 +
| style="text-align: right;" | 1962.2
 +
| style="text-align: right;" | 1963.2
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2005-09-19
 +
| Perforation
 +
| style="text-align: right;" | 1958.5
 +
| style="text-align: right;" | 1959.5
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Status: Flowing
+
| 2005-10-24
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1947
 +
| style="text-align: right;" | 1955
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2005-10-30
 +
| Perforation
 +
| style="text-align: right;" | 1779.3
 +
| style="text-align: right;" | 1780.1
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Configuration: Vertical
+
| 2005-10-30
 +
| Perforation
 +
| style="text-align: right;" | 1765.5
 +
| style="text-align: right;" | 1766
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Latitude: 52.08117800000002262
+
| 2005-10-30
 +
| Perforation
 +
| style="text-align: right;" | 1747.5
 +
| style="text-align: right;" | 1748
 +
| style="text-align: right;" | 17
 
|-
 
|-
| Longitude: -113.52142299999997022
+
| 2005-11-05
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1735.5
 +
| style="text-align: right;" | 1743.5
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2005-11-05
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1769
 +
| style="text-align: right;" | 1777
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-11-05
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1754
 +
| style="text-align: right;" | 1762
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2005-11-13
 +
| Perforation
 +
| style="text-align: right;" | 1723
 +
| style="text-align: right;" | 1725
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2005-11-13
 +
| Perforation
 +
| style="text-align: right;" | 1720
 +
| style="text-align: right;" | 1722
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2005-11-17
 +
| Fracture
 +
| style="text-align: right;" | 1720
 +
| style="text-align: right;" | 1725
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011-09-28
 +
| Perforation
 +
| style="text-align: right;" | 1584
 +
| style="text-align: right;" | 1588
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-10-07
 +
| Perforation
 +
| style="text-align: right;" | 1569
 +
| style="text-align: right;" | 1574
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2011-10-30
 +
| Fracture
 +
| style="text-align: right;" | 1569
 +
| style="text-align: right;" | 1588
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 6629
 +
| style="text-align: right;" | 109.9
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 614.6
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 261.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 392.3
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8660
 +
| style="text-align: right;" | 447.7
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 215.5
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8759
 +
| style="text-align: right;" | 487.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 262.7
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8400
 +
| style="text-align: right;" | 527.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 259.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8495
 +
| style="text-align: right;" | 531.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 247.4
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8379
 +
| style="text-align: right;" | 527.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 174.5
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 2159
 +
| style="text-align: right;" | 142.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 50.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-04-24
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 03:14, 8 June 2019

Well Details

Well ID: 0364250914004
Loading map...
Location: 00/14-09-036-25W4/4
Location Alias: 00/14-09-36-25 W4M
Location Alias 2: 00/14-09-036-25 W4/04
Province: Alberta
County/Municipality: Red Deer County
Well Name: FORGE THREEHCK 14-9-36-25
Operator Name: Forge Oil & Gas Limited
License Number: 0328246
License Date: 2005-03-18
License Status: Issued
Spud Date: 2005-03-25
Final Drill Date: 2005-04-01
Well Total Depth: 2011 m
Surface Hole Latitude: 52.081178
Surface Hole Longitude: -113.521423

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-01 Perforation 1962.2 1963.2 17
2005-08-29 Fracture 1962.2 1963.2 0
2005-09-19 Perforation 1958.5 1959.5 17
2005-10-24 Packing Device Capped w/Cement 1947 1955 0
2005-10-30 Perforation 1779.3 1780.1 17
2005-10-30 Perforation 1765.5 1766 17
2005-10-30 Perforation 1747.5 1748 17
2005-11-05 Packing Device Capped w/Cement 1735.5 1743.5 0
2005-11-05 Packing Device Capped w/Cement 1769 1777 0
2005-11-05 Packing Device Capped w/Cement 1754 1762 0
2005-11-13 Perforation 1723 1725 20
2005-11-13 Perforation 1720 1722 20
2005-11-17 Fracture 1720 1725 0
2011-09-28 Perforation 1584 1588 17
2011-10-07 Perforation 1569 1574 17
2011-10-30 Fracture 1569 1588 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6629 109.9 0.0 614.6
2013 8759 261.1 0.0 392.3
2014 8660 447.7 0.0 215.5
2015 8759 487.1 0.0 262.7
2016 8400 527.2 0.0 259.0
2017 8495 531.1 0.0 247.4
2018 8379 527.0 0.0 174.5
2019 2159 142.4 0.0 50.0

For data sources see[4]

References