If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m (Maintenance script moved page 42-129-27587 to 37-129-27587: -i0) |
m |
||
| Line 28: | Line 28: | ||
|} | |} | ||
__TOC__ | __TOC__ | ||
| − | == | + | == Inspection Data == |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | INSPECTION ID | !scope="col" | INSPECTION ID | ||
| Well ID: 42-129-27587 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.204828,"lon":-79.733285,"icon":""}]} |
| County: Westmoreland | |
| Municipality: South Huntingdon Township | |
| Operator Name: ATLAS RESOURCES LLC | |
| First Permit Date: 2008-09-15 | |
| Last Permit Date: 2008-09-15 | |
| Spud Date: None | |
| Unconventional: Yes | |
| Horizontal: No | |
| Violations: None | |
| Latitude: 40.204828 | |
| Longitude: -79.733285 |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
|---|---|---|---|---|
| 1739878 | 2008-10-01 | No Violations Noted | Well staked, site not constructed. Inspection performed as a result of an after the fact waiver request for the site. After a site visit spoke with operator representative Shawn Smith he agreed to have the E&S plan drawing revised to show filter fabric fence backed with hay bales.at the foot of the fill slope. With this revision the E&S plan as compiled should minimize accelerated erosion & sedimentation, provided the plan is properly implemented and maintained. |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2009-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2008-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|