If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0474212706003 | | Well ID: 0474212706003 | ||
− | | style="height=100%; align=center" rowspan="14" | {{#display_map: 53. | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 53.080624, -112.994009 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/06-27-047-21W4/3 | | Location: 00/06-27-047-21W4/3 | ||
|- | |- | ||
− | | Well Name: | + | | Location Alias: 00/06-27-47-21 W4M |
+ | |- | ||
+ | | Location Alias 2: 00/06-27-047-21 W4/03 | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | County/Municipality: [[Camrose County,_Alberta|Camrose County]] | ||
+ | |- | ||
+ | | Well Name: PINE CLIFF BITTRNLK 6-27-47-21 | ||
+ | |- | ||
+ | | Operator Name: | ||
+ | |- | ||
+ | | License Number: 0079580 | ||
|- | |- | ||
| License Date: 1979-11-29 | | License Date: 1979-11-29 | ||
|- | |- | ||
− | | Final | + | | License Status: RecCertified |
+ | |- | ||
+ | | Spud Date: 1979-12-10 | ||
+ | |- | ||
+ | | Final Drill Date: 1979-12-22 | ||
+ | |- | ||
+ | | Well Total Depth: 1312 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 53.080624 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -112.994009 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 1980-02-02 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1083 | ||
+ | | style="text-align: right;" | 1085.5 | ||
+ | | style="text-align: right;" | 4 | ||
+ | |- | ||
+ | | 1980-02-02 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1084.5 | ||
+ | | style="text-align: right;" | 1086.5 | ||
+ | | style="text-align: right;" | 4 | ||
+ | |- | ||
+ | | 1980-02-05 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1075 | ||
+ | | style="text-align: right;" | 1075 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1980-02-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1037 | ||
+ | | style="text-align: right;" | 1038.3 | ||
+ | | style="text-align: right;" | 4 | ||
+ | |- | ||
+ | | 1980-02-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1039 | ||
+ | | style="text-align: right;" | 1040 | ||
+ | | style="text-align: right;" | 4 | ||
|- | |- | ||
− | | | + | | 1980-02-06 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1021 | ||
+ | | style="text-align: right;" | 1022 | ||
+ | | style="text-align: right;" | 4 | ||
|- | |- | ||
− | | | + | | 1980-02-06 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1023.5 | ||
+ | | style="text-align: right;" | 1024.5 | ||
+ | | style="text-align: right;" | 4 | ||
|- | |- | ||
− | | | + | | 1980-02-07 |
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1015 | ||
+ | | style="text-align: right;" | 1015 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1981-01-19 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 299 | ||
+ | | style="text-align: right;" | 301 | ||
+ | | style="text-align: right;" | 6 | ||
|- | |- | ||
− | | | + | | 1995-01-21 |
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 299 | ||
+ | | style="text-align: right;" | 301 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1995-01-21 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1039 | ||
+ | | style="text-align: right;" | 1040 | ||
+ | | style="text-align: right;" | 4 | ||
|- | |- | ||
− | | | + | | 1995-01-21 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 1037 | ||
+ | | style="text-align: right;" | 1038.3 | ||
+ | | style="text-align: right;" | 4 | ||
|- | |- | ||
+ | | 1995-01-21 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1023.5 | ||
+ | | style="text-align: right;" | 1024.5 | ||
+ | | style="text-align: right;" | 4 | ||
+ | |- | ||
+ | | 1995-01-21 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1021 | ||
+ | | style="text-align: right;" | 1022 | ||
+ | | style="text-align: right;" | 4 | ||
+ | |- | ||
+ | | 1995-01-22 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 1021 | ||
+ | | style="text-align: right;" | 1040 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1995-01-24 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1044.5 | ||
+ | | style="text-align: right;" | 1045.5 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1995-01-25 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 1033.5 | ||
+ | | style="text-align: right;" | 1035 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 2000-08-08 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 1020 | ||
+ | | style="text-align: right;" | 1028 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" | End Date | ||
+ | !scope="col" | Chemical Name | ||
+ | !scope="col" style="text-align: right;" | CAS Number | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" style="text-align: right;" | Job Percentage | ||
+ | !scope="col" | Supplier | ||
+ | |}--> | ||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 1995 | ||
+ | | style="text-align: right;" | 5931 | ||
+ | | style="text-align: right;" | 102.8 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 15.0 | ||
+ | |- | ||
+ | | 1996 | ||
+ | | style="text-align: right;" | 5148 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 4.7 | ||
+ | |- | ||
+ | | 1997 | ||
+ | | style="text-align: right;" | 24 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Well Production Data - All Alberta |
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2018-04-24 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2018-05-14 }}</ref> |
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta]][[Category:Wells]] |
Well ID: 0474212706003 | |
Location: 00/06-27-047-21W4/3 | |
Location Alias: 00/06-27-47-21 W4M | |
Location Alias 2: 00/06-27-047-21 W4/03 | |
Province: Alberta | |
County/Municipality: Camrose County | |
Well Name: PINE CLIFF BITTRNLK 6-27-47-21 | |
Operator Name: | |
License Number: 0079580 | |
License Date: 1979-11-29 | |
License Status: RecCertified | |
Spud Date: 1979-12-10 | |
Final Drill Date: 1979-12-22 | |
Well Total Depth: 1312 m | |
Surface Hole Latitude: 53.080624 | |
Surface Hole Longitude: -112.994009 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-02-02 | Perforation | 1083 | 1085.5 | 4 |
1980-02-02 | Perforation | 1084.5 | 1086.5 | 4 |
1980-02-05 | Packing Device Capped w/Cement | 1075 | 1075 | 0 |
1980-02-05 | Perforation | 1037 | 1038.3 | 4 |
1980-02-05 | Perforation | 1039 | 1040 | 4 |
1980-02-06 | Perforation | 1021 | 1022 | 4 |
1980-02-06 | Perforation | 1023.5 | 1024.5 | 4 |
1980-02-07 | Packing Device Capped w/Cement | 1015 | 1015 | 0 |
1981-01-19 | Perforation | 299 | 301 | 6 |
1995-01-21 | Cement Squeeze | 299 | 301 | 0 |
1995-01-21 | Perforation | 1039 | 1040 | 4 |
1995-01-21 | Perforation | 1037 | 1038.3 | 4 |
1995-01-21 | Perforation | 1023.5 | 1024.5 | 4 |
1995-01-21 | Perforation | 1021 | 1022 | 4 |
1995-01-22 | Cement Squeeze | 1021 | 1040 | 0 |
1995-01-24 | Perforation | 1044.5 | 1045.5 | 13 |
1995-01-25 | Perforation | 1033.5 | 1035 | 13 |
2000-08-08 | Packing Device Capped w/Cement | 1020 | 1028 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 5931 | 102.8 | 0.0 | 15.0 |
1996 | 5148 | 0.0 | 0.0 | 4.7 |
1997 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[4]