X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0275043613000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0275043613000
 
| Well ID: 0275043613000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.34033400000004121, -114.43685099999999011 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.340334, -114.436851 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/13-36-027-04W5/0
 
| Location: 00/13-36-027-04W5/0
 
|-
 
|-
| Well Name: PBN ET AL HZ COCHRANE 13-36-27-4
+
| Location Alias: 00/13-36-27-04 W5M
 +
|-
 +
| Location Alias 2: 00/13-36-027-04 W5/00
 +
|-
 +
| Province: Alberta
 +
|-
 +
| County/Municipality: [[Rocky View County,_Alberta|Rocky View County]]
 +
|-
 +
| Well Name: RIDGEBACK LOCHEND 13-36-27-4
 +
|-
 +
| Operator Name: [[Bonavista Energy Corporation]]
 +
|-
 +
| License Number: 0446981
 
|-
 
|-
 
| License Date: 2012-07-03
 
| License Date: 2012-07-03
 
|-
 
|-
| Final Drilling Date: 2012-08-09
+
| License Status: Issued
 
|-
 
|-
| Total Depth: 4199.0m
+
| Spud Date: 2012-07-26
 
|-
 
|-
| Fluid Type: Crude Oil
+
| Final Drill Date: 2012-08-09
 
|-
 
|-
| Status: Pumping
+
| Well Total Depth: 4199 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 51.340334
 
|-
 
|-
| Configuration: Horizontal
+
| Surface Hole Longitude: -114.436851
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 
|-
 
|-
| Latitude: 51.34033400000004121
+
| 26 Jul 2012
 +
| [[Precision Drilling Corporation]]
 +
| style="text-align: right;" | 379
 +
| style="text-align: right;" | N/A
 +
| Drill To LD
 
|-
 
|-
| Longitude: -114.43685099999999011
+
|}
 +
For data sources see<ref>{{cite web
 +
| title =ST49: Daily Spud and Drilling Activity List
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-04-30
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 
|-
 
|-
 +
| 2012-08-01
 +
| style="text-align: right;" | 1853
  
 +
|-
 +
| 2012-08-03
 +
| style="text-align: right;" | 2710
 +
| Horizontal
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Direction Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2018-05-09
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2018-05-14 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2012-08-14
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 4194
 +
| style="text-align: right;" | 4199
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 4167.9
 +
| style="text-align: right;" | 4168
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 4100
 +
| style="text-align: right;" | 4100.1
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 4041.8
 +
| style="text-align: right;" | 4041.9
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3967.1
 +
| style="text-align: right;" | 3967.2
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3906.2
 +
| style="text-align: right;" | 3906.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3832.2
 +
| style="text-align: right;" | 3832.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3771.7
 +
| style="text-align: right;" | 3771.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3697.4
 +
| style="text-align: right;" | 3697.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3636.3
 +
| style="text-align: right;" | 3636.4
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3564.8
 +
| style="text-align: right;" | 3564.9
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3503.8
 +
| style="text-align: right;" | 3503.9
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3428.7
 +
| style="text-align: right;" | 3428.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3368.2
 +
| style="text-align: right;" | 3368.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3293.7
 +
| style="text-align: right;" | 3293.8
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3232
 +
| style="text-align: right;" | 3232.1
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3170.8
 +
| style="text-align: right;" | 3170.9
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3096.2
 +
| style="text-align: right;" | 3096.3
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3023.5
 +
| style="text-align: right;" | 3023.6
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2963.4
 +
| style="text-align: right;" | 2963.5
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-17
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2888.6
 +
| style="text-align: right;" | 2888.7
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
<!--== Fracking Activities ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" | End Date
 +
!scope="col" | Chemical Name
 +
!scope="col" style="text-align: right;" | CAS Number
 +
!scope="col" | Purpose
 +
!scope="col" style="text-align: right;" | Job Percentage
 +
!scope="col" | Supplier
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 243
 +
| style="text-align: right;" | 74.5
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 7052
 +
| style="text-align: right;" | 1270.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8122
 +
| style="text-align: right;" | 2580.4
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8278
 +
| style="text-align: right;" | 2169.3
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8345
 +
| style="text-align: right;" | 1724.2
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 8.2
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8541
 +
| style="text-align: right;" | 1260.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 17.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8491
 +
| style="text-align: right;" | 875.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 15.5
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 2159
 +
| style="text-align: right;" | 158.1
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 3.7
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-04-24
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-08-14
 +
| No Incident
 +
| style="text-align: right;" | N/A
 +
| style="text-align: right;" | N/A
 +
|-
 +
| 2012-09-23
 +
| No Incident
 +
| style="text-align: right;" | N/A
 +
| style="text-align: right;" | N/A
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2018-05-09
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2018-05-14 }}</ref>
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta]][[Category:Wells]]

Revision as of 10:23, 9 June 2019

Well Details

Well ID: 0275043613000
Loading map...
Location: 00/13-36-027-04W5/0
Location Alias: 00/13-36-27-04 W5M
Location Alias 2: 00/13-36-027-04 W5/00
Province: Alberta
County/Municipality: Rocky View County
Well Name: RIDGEBACK LOCHEND 13-36-27-4
Operator Name: Bonavista Energy Corporation
License Number: 0446981
License Date: 2012-07-03
License Status: Issued
Spud Date: 2012-07-26
Final Drill Date: 2012-08-09
Well Total Depth: 4199 m
Surface Hole Latitude: 51.340334
Surface Hole Longitude: -114.436851

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
26 Jul 2012 Precision Drilling Corporation 379 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-08-01 1853
2012-08-03 2710 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-14 Open Hole/Barefoot Completion 4194 4199 0
2012-09-17 Multi-Stage Fracture 4167.9 4168 0
2012-09-17 Multi-Stage Fracture 4100 4100.1 0
2012-09-17 Multi-Stage Fracture 4041.8 4041.9 0
2012-09-17 Multi-Stage Fracture 3967.1 3967.2 0
2012-09-17 Multi-Stage Fracture 3906.2 3906.3 0
2012-09-17 Multi-Stage Fracture 3832.2 3832.3 0
2012-09-17 Multi-Stage Fracture 3771.7 3771.8 0
2012-09-17 Multi-Stage Fracture 3697.4 3697.5 0
2012-09-17 Multi-Stage Fracture 3636.3 3636.4 0
2012-09-17 Multi-Stage Fracture 3564.8 3564.9 0
2012-09-17 Multi-Stage Fracture 3503.8 3503.9 0
2012-09-17 Multi-Stage Fracture 3428.7 3428.8 0
2012-09-17 Multi-Stage Fracture 3368.2 3368.3 0
2012-09-17 Multi-Stage Fracture 3293.7 3293.8 0
2012-09-17 Multi-Stage Fracture 3232 3232.1 0
2012-09-17 Multi-Stage Fracture 3170.8 3170.9 0
2012-09-17 Multi-Stage Fracture 3096.2 3096.3 0
2012-09-17 Multi-Stage Fracture 3023.5 3023.6 0
2012-09-17 Multi-Stage Fracture 2963.4 2963.5 0
2012-09-17 Multi-Stage Fracture 2888.6 2888.7 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 243 74.5 0.0 0.0
2013 7052 1270.2 0.0 0.0
2014 8122 2580.4 0.0 0.0
2015 8278 2169.3 0.0 0.0
2016 8345 1724.2 0.0 8.2
2017 8541 1260.1 0.0 17.0
2018 8491 875.1 0.0 15.5
2019 2159 158.1 0.0 3.7

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-14 No Incident N/A N/A
2012-09-23 No Incident N/A N/A

For data sources see[7]

References