If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0866033210002 | | Well ID: 0866033210002 | ||
− | | style="height=100%; align=center" rowspan="14" | {{#display_map: 56. | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 56.504739, -118.430676 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/10-32-086-03W6/2 | | Location: 00/10-32-086-03W6/2 | ||
+ | |- | ||
+ | | Location Alias: 00/10-32-86-03 W6M | ||
+ | |- | ||
+ | | Location Alias 2: 00/10-32-086-03 W6/02 | ||
+ | |- | ||
+ | | Province: Alberta | ||
+ | |- | ||
+ | | County/Municipality: [[Clear Hills County,_Alberta|Clear Hills County]] | ||
|- | |- | ||
| Well Name: DEVON HINES 10-32-86-3 | | Well Name: DEVON HINES 10-32-86-3 | ||
+ | |- | ||
+ | | Operator Name: | ||
+ | |- | ||
+ | | License Number: 0099856 | ||
|- | |- | ||
| License Date: 1982-12-20 | | License Date: 1982-12-20 | ||
|- | |- | ||
− | | Final | + | | License Status: Suspension |
+ | |- | ||
+ | | Spud Date: 1982-12-31 | ||
+ | |- | ||
+ | | Final Drill Date: 1983-01-05 | ||
+ | |- | ||
+ | | Well Total Depth: 1098 m | ||
+ | |- | ||
+ | | Surface Hole Latitude: 56.504739 | ||
+ | |- | ||
+ | | Surface Hole Longitude: -118.430676 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Licensing Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref><ref>{{cite web | ||
+ | | title = General Well Data File - Drilling Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Spud Table == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Spud Date | ||
+ | !scope="col" | Contractor | ||
+ | !scope="col" style="text-align: right;" | Rig Number | ||
+ | !scope="col" style="text-align: right;" | New Projected Depth (m) | ||
+ | !scope="col" | Activity Type | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Directional Drilling == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" style="text-align: right;" | Depth (m) | ||
+ | !scope="col" | Reason | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Perforation Date | ||
+ | !scope="col" | Perforation Type | ||
+ | !scope="col" style="text-align: right;" | Interval Top (m) | ||
+ | !scope="col" style="text-align: right;" | Interval Base (m) | ||
+ | !scope="col" style="text-align: right;" | Number of Shots | ||
+ | |- | ||
+ | | 1984-10-22 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 966 | ||
+ | | style="text-align: right;" | 967 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1984-10-22 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 968.5 | ||
+ | | style="text-align: right;" | 971.5 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1984-10-24 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 942.5 | ||
+ | | style="text-align: right;" | 946.5 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1992-05-13 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 969 | ||
+ | | style="text-align: right;" | 972 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1992-10-08 | ||
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 942.5 | ||
+ | | style="text-align: right;" | 946.5 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1992-10-08 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 942.5 | ||
+ | | style="text-align: right;" | 946.5 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1992-10-11 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 942 | ||
+ | | style="text-align: right;" | 943.5 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1992-10-13 |
+ | | Acid Treatment | ||
+ | | style="text-align: right;" | 942 | ||
+ | | style="text-align: right;" | 943.5 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1992-10-13 |
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 942 | ||
+ | | style="text-align: right;" | 943.5 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 1992-10-17 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 759.5 | ||
+ | | style="text-align: right;" | 761.5 | ||
+ | | style="text-align: right;" | 13 | ||
|- | |- | ||
− | | | + | | 1994-03-19 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 759.5 | ||
+ | | style="text-align: right;" | 761.5 | ||
+ | | style="text-align: right;" | 14 | ||
|- | |- | ||
− | | | + | | 1994-03-19 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 763 | ||
+ | | style="text-align: right;" | 765 | ||
+ | | style="text-align: right;" | 14 | ||
|- | |- | ||
− | | | + | | 1994-03-30 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 966 | ||
+ | | style="text-align: right;" | 967 | ||
+ | | style="text-align: right;" | 14 | ||
|- | |- | ||
− | | | + | | 1994-03-30 |
+ | | Perforation | ||
+ | | style="text-align: right;" | 968.5 | ||
+ | | style="text-align: right;" | 972 | ||
+ | | style="text-align: right;" | 14 | ||
|- | |- | ||
+ | | 1999-02-01 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 952 | ||
+ | | style="text-align: right;" | 960 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-02-02 | ||
+ | | Packing Device Capped w/Cement | ||
+ | | style="text-align: right;" | 927 | ||
+ | | style="text-align: right;" | 935 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-02-02 | ||
+ | | Cement Squeeze | ||
+ | | style="text-align: right;" | 759.5 | ||
+ | | style="text-align: right;" | 765 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 1999-02-05 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 786.5 | ||
+ | | style="text-align: right;" | 787.5 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | | 1999-02-06 | ||
+ | | Perforation | ||
+ | | style="text-align: right;" | 673 | ||
+ | | style="text-align: right;" | 673.5 | ||
+ | | style="text-align: right;" | 13 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2018-05-09 | ||
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2018-05-14 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Start Date | ||
+ | !scope="col" | End Date | ||
+ | !scope="col" | Chemical Name | ||
+ | !scope="col" style="text-align: right;" | CAS Number | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" style="text-align: right;" | Job Percentage | ||
+ | !scope="col" | Supplier | ||
+ | |}--> | ||
+ | <!--== Water Sources == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Water Diversion Start Date | ||
+ | !scope="col" | Water Diversion End Date | ||
+ | !scope="col" | Water Source Type | ||
+ | !scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" style="text-align: right;" | Total Production Hours | ||
+ | !scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>) | ||
+ | !scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>) | ||
+ | |- | ||
+ | | 1985 | ||
+ | | style="text-align: right;" | 5028 | ||
+ | | style="text-align: right;" | 22452.1 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 72.4 | ||
+ | |- | ||
+ | | 1986 | ||
+ | | style="text-align: right;" | 7620 | ||
+ | | style="text-align: right;" | 28038.1 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 83.9 | ||
+ | |- | ||
+ | | 1987 | ||
+ | | style="text-align: right;" | 7954 | ||
+ | | style="text-align: right;" | 10463.3 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 20.3 | ||
+ | |- | ||
+ | | 1988 | ||
+ | | style="text-align: right;" | 6690 | ||
+ | | style="text-align: right;" | 7799.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 23.9 | ||
+ | |- | ||
+ | | 1989 | ||
+ | | style="text-align: right;" | 7325 | ||
+ | | style="text-align: right;" | 7113.2 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 13.5 | ||
+ | |- | ||
+ | | 1990 | ||
+ | | style="text-align: right;" | 6653 | ||
+ | | style="text-align: right;" | 5680.0 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 6.4 | ||
+ | |- | ||
+ | | 1991 | ||
+ | | style="text-align: right;" | 5128 | ||
+ | | style="text-align: right;" | 5997.9 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 5.8 | ||
+ | |- | ||
+ | | 1992 | ||
+ | | style="text-align: right;" | 5681 | ||
+ | | style="text-align: right;" | 14843.9 | ||
+ | | style="text-align: right;" | 0.0 | ||
+ | | style="text-align: right;" | 2680.3 | ||
+ | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Well Production Data - All Alberta |
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2018-04-24 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2018-05-14 }}</ref> |
+ | <!--== Occurences == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Occurence Date | ||
+ | !scope="col" | Occurence Type | ||
+ | !scope="col" style="text-align: right;" | Occurence Depth (m) | ||
+ | !scope="col" style="text-align: right;" | Occurence Control Depth (m) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
==References== | ==References== | ||
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Alberta]][[Category:Wells]] |
Well ID: 0866033210002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.504739,"lon":-118.430676,"icon":""}]} |
Location: 00/10-32-086-03W6/2 | |
Location Alias: 00/10-32-86-03 W6M | |
Location Alias 2: 00/10-32-086-03 W6/02 | |
Province: Alberta | |
County/Municipality: Clear Hills County | |
Well Name: DEVON HINES 10-32-86-3 | |
Operator Name: | |
License Number: 0099856 | |
License Date: 1982-12-20 | |
License Status: Suspension | |
Spud Date: 1982-12-31 | |
Final Drill Date: 1983-01-05 | |
Well Total Depth: 1098 m | |
Surface Hole Latitude: 56.504739 | |
Surface Hole Longitude: -118.430676 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-10-22 | Perforation | 966 | 967 | 13 |
1984-10-22 | Perforation | 968.5 | 971.5 | 13 |
1984-10-24 | Perforation | 942.5 | 946.5 | 13 |
1992-05-13 | Perforation | 969 | 972 | 13 |
1992-10-08 | Acid Treatment | 942.5 | 946.5 | 0 |
1992-10-08 | Cement Squeeze | 942.5 | 946.5 | 0 |
1992-10-11 | Perforation | 942 | 943.5 | 13 |
1992-10-13 | Acid Treatment | 942 | 943.5 | 0 |
1992-10-13 | Cement Squeeze | 942 | 943.5 | 0 |
1992-10-17 | Perforation | 759.5 | 761.5 | 13 |
1994-03-19 | Perforation | 759.5 | 761.5 | 14 |
1994-03-19 | Perforation | 763 | 765 | 14 |
1994-03-30 | Perforation | 966 | 967 | 14 |
1994-03-30 | Perforation | 968.5 | 972 | 14 |
1999-02-01 | Packing Device Capped w/Cement | 952 | 960 | 0 |
1999-02-02 | Packing Device Capped w/Cement | 927 | 935 | 0 |
1999-02-02 | Cement Squeeze | 759.5 | 765 | 0 |
1999-02-05 | Perforation | 786.5 | 787.5 | 13 |
1999-02-06 | Perforation | 673 | 673.5 | 13 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 5028 | 22452.1 | 0.0 | 72.4 |
1986 | 7620 | 28038.1 | 0.0 | 83.9 |
1987 | 7954 | 10463.3 | 0.0 | 20.3 |
1988 | 6690 | 7799.0 | 0.0 | 23.9 |
1989 | 7325 | 7113.2 | 0.0 | 13.5 |
1990 | 6653 | 5680.0 | 0.0 | 6.4 |
1991 | 5128 | 5997.9 | 0.0 | 5.8 |
1992 | 5681 | 14843.9 | 0.0 | 2680.3 |
For data sources see[4]