If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m (Maintenance script moved page 42-115-20466 to 37-115-20466: -i0) |
m |
||
Line 32: | Line 32: | ||
|} | |} | ||
__TOC__ | __TOC__ | ||
− | == | + | == Inspection Data == |
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | INSPECTION ID | !scope="col" | INSPECTION ID |
Well ID: 42-115-20466 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.884172,"lon":-75.992252,"icon":""}]} |
County: Susquehanna | |
Municipality: Forest Lake Township | |
Operator Name: CARRIZO (MARCELLUS) LLC | |
Farm/Lease Name: BAKER 6H | |
First Permit Date: 2010-11-17 | |
Last Permit Date: 2010-11-17 | |
Spud Date: 2010-12-03 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 2 | |
Latitude: 41.884172 | |
Longitude: -75.992252 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1976951 | 2011-05-31 | No Violations Noted | nabors Rig MO5. Currently WOC trucks to cement 5 1/2 string. Rigging up to cement and should be doing that later this evening. containment in place. Excessive amount of drill mud on plastic containment near solids mixing area nd mud storage tanks. Recommended containment be cleaned to prevent material from reaching ground surface. Followed up on reported spill of 1 1/2 bbl of drill mud. Appears to have been contained on plastic. Operator in process of cleaning up spill. Spoke with Nabors Driling Mgr about keeping site cleaner. | |
1985319 | 2011-06-27 | Pending | Bubbling observed in cellar around outside of 9 5/8" casing. Operator to clean out cellar so source of bubbling can be better determined. | |
2007327 | 2011-09-29 | No Violations Noted | ||
2014431 | 2011-10-25 | Pending | DEP arrived on site at 11 am. The purpose of the inspection was to check the status of the wells and not any activity on site. At the time of inspection, crews were installing new plastic secondary containment for upcoming frac. Six wells have been drilled (1H - 6H). All six wells are currently shut in and not vented. Inspection of the Baker 6H cellar revealed steady rolling bubbling alongside the 9 5/8" casing. It is requested by the DEP that the Operator identify the source of the leak. The Operator is to notify the DEP when this work is to be completed. The Operator shall provide a summary of the findings, and a description fo what repairs need to be completed. According to Chapter 78 Section 78.86...the Operator has the option to correct the defect or submit a plan to correct the defect for approval by the Department within 30 days. | |
2053182 | 2012-03-13 | No Violations Noted | Please refer to Baker 1H 3-13-12 inspection report regarding details of the investigation. Permit number is 42-115-20471. | |
2077201 | 2012-06-18 | Violation(s) Noted | see inspection report for full details | 642176 |
2077201 | 2012-06-18 | Violation(s) Noted | see inspection report for full details | 642177 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 615159.0 | 180.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 580225.0 | 105.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 1032.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2011-1 | DRILL CUTTINGS | 1580.0 | Tons | LANDFILL | NY STATE #32S11 | ALLIED WASTE SYSTEMS | NIAGARA FALLS | NY |
2011-1 | DRILLING FLUID WASTE | 1290.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 | EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) | WILLIAMSPORT | PA |
2011-1 | DRILL CUTTINGS | 756.0 | Tons | LANDFILL | THR029 | TUNNELL HILL RECLAMATION LANDFILL | NEWLEXINGTON | OH |
2011-1 | DRILLING FLUID WASTE | 281.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0102784 | WASTE TREATMENT CORPORATION | WARREN | PA |
2012-1 | PRODUCED FLUID | 12324.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |