37-115-20466

Well Details

Well ID: 37-115-20466
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Forest Lake Township
Operator Name: BKV OPR LLC
Well Pad ID: 145322
Farm/Lease Name: BAKER 6H
License Status:
Spud Date:
Permit Date: 2010-11-17
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.884172
Longitude: -75.992253

For data sources see[1][2][3]

Well History

Date Event
2010-11-17 New Permit Application
2010-12-03 Performed Spud Operation
2011-06-02 Drilling Completion
2012-08-17 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-03-02 2012-03-02 6,238 3,828,468

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand, White, 100 Baker Hughes Proppant Quartz 14808-60-7 100.00 1.66
Sand, White, 40/70 Baker Hughes Proppant Quartz 14808-60-7 100.00 7.57
Hydrochloric Acid 5.1-7.5 Baker Hughes Acidizing Hydrochloric acid 7647-01-0 7.50 0.05
Water 7732-18-5 92.50 0.66
InFlo 250W Baker Hughes Surfactant 2-Butoxyethanol 111-76-2 5.00 0.00003000
Methanol 67-56-1 30.00 0.00018000
Surfactants 80.00 0.00049000
Sand, White, 30/50 Baker Hughes Proppant Quartz 14808-60-7 100.00 5.64
Ferrotrol 300L Baker Hughes Iron Control Citric acid 77-92-9 60.00 0.00140000
CI-14 Baker Hughes Corrosion Inhibitor Methanol 67-56-1 100.00 0.00054000
Fatty acids, tall-oil 61790-12-3 10.00 0.00005000
Propargyl alcohol 107-19-7 5.00 0.00003000
Ethoxylated C14-15 alcohols 68951-67-7 30.00 0.00016000
Alkenes, C>10 .alpha.- 64743-02-8 5.00 0.00003000
FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Ingredients shown above are subject
to 29 CFR 1910.1200(i)
and appear on Material
Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS.
Baker Hughes Surfactant
Alpha 1427 Baker Hughes Biocide Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.00 0.00120000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00240000
Ethanol 64-17-5 5.00 0.00120000
Glutaraldehyde 111-30-8 30.00 0.00721000
Scaletrol 720 Baker Hughes Scale Inhibitor Calcium chloride 10043-52-4 5.00 0.00083000
Ethylene glycol 107-21-1 30.00 0.00500000
Ingredients shown above are subject
to 29 CFR 1910.1200(i)
and appear on Material
Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS.
Formalin 50-00-0
Thiourea polymer 68527-49-1
Salt 0.00468800
Poly (acrylamide-co-acrylic acid) 0.02
Hydrochloric acid 7647-01-0
Sodium chloride 7647-14-5 0.00000500
Potassium chloride 7447-40-7 0.00000833
Sorbitan Monooleate 0.00468800
Polyacrylate 0.00333073
Ethoxylated Alcohol 0.00187520
Water 7732-18-5 0.07
mesh Hughes Proppant
Water Operator Carrier Water 7732-18-5 100.00 84.24

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2011 CARRIZO (MARCELLUS) LLC 0.00 0 0.00 0 0.00 0
2012 CARRIZO (MARCELLUS) LLC 1,195,101.00 285 0.00 0 0.00 0
2013 CARRIZO (MARCELLUS) LLC 532,476.00 279 0.00 0 0.00 0
2014 CARRIZO (MARCELLUS) LLC 6,752.25 7 0.00 0 0.00 0
2015 CARRIZO (MARCELLUS) LLC 1,046,551.07 317 0.00 0 0.00 0
2016 CARRIZO (MARCELLUS) LLC 356,398.72 268 0.00 0 0.00 0
2017 CARRIZO (MARCELLUS) LLC 213,919.01 345 0.00 0 0.00 0
2018 BKV OPR LLC 132,164.78 363 0.00 0 0.00 0
2019 BKV OPR LLC 80,811.88 319 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CARRIZO (MARCELLUS) LLC Drilling Fluid Waste 281.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 CARRIZO (MARCELLUS) LLC Drill Cuttings 756.00 Tons LANDFILL THR029
2011 CARRIZO (MARCELLUS) LLC Drill Cuttings 1,580.00 Tons LANDFILL NY STATE #32S11
2011 CARRIZO (MARCELLUS) LLC Drilling Fluid Waste 1,290.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 CARRIZO (MARCELLUS) LLC Produced Fluid 13,356.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 222.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CARRIZO (MARCELLUS) LLC Produced Fluid 215.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 147.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 735.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 CARRIZO (MARCELLUS) LLC Produced Fluid 805.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 227.99 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 151.72 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 207.31 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 600.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2015 CARRIZO (MARCELLUS) LLC Produced Fluid 1,620.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CARRIZO (MARCELLUS) LLC Other Oil & Gas Wastes 15.18 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 43.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 32.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 69.22 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 119.48 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 93.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 44.83 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CARRIZO (MARCELLUS) LLC Produced Fluid 100.87 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 48.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 230.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 31.62 Bbl REUSE (AT WELL PAD)
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 113.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2017 CARRIZO (MARCELLUS) LLC Produced Fluid 9.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 BKV OPR LLC Produced Fluid 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 59.20 Bbl REUSE (AT WELL PAD)
2018 CARRIZO (MARCELLUS) LLC Produced Fluid 199.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Produced Fluid 15.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019 BKV OPR LLC Produced Fluid 271.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 BKV OPR LLC Produced Fluid 15.00 Bbl REUSE (AT WELL PAD)
2019 BKV OPR LLC Produced Fluid 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1976951 Primary Facility 2011-05-31 Drilling/Alteration No Violations Noted nabors Rig MO5. Currently WOC trucks to cement 5 1/2 string. Rigging up to cement and should be doing that later this evening. containment in place. Excessive amount of drill mud on plastic containment near solids mixing area nd mud storage tanks. Recommended containment be cleaned to prevent material from reaching ground surface. Followed up on reported spill of 1 1/2 bbl of drill mud. Appears to have been contained on plastic. Operator in process of cleaning up spill. Spoke with Nabors Driling Mgr about keeping site cleaner.
1985319 Primary Facility 2011-06-27 Routine/Complete Inspection Pending Bubbling observed in cellar around outside of 9 5/8" casing. Operator to clean out cellar so source of bubbling can be better determined.
2007327 Primary Facility 2011-09-29 Routine/Complete Inspection No Violations Noted
2014431 Primary Facility 2011-10-25 Routine/Complete Inspection Pending DEP arrived on site at 11 am. The purpose of the inspection was to check the status of the wells and not any activity on site. At the time of inspection, crews were installing new plastic secondary containment for upcoming frac. Six wells have been drilled (1H - 6H). All six wells are currently shut in and not vented. Inspection of the Baker 6H cellar revealed steady rolling bubbling alongside the 9 5/8" casing. It is requested by the DEP that the Operator identify the source of the leak. The Operator is to notify the DEP when this work is to be completed. The Operator shall provide a summary of the findings, and a description fo what repairs need to be completed. According to Chapter 78 Section 78.86...the Operator has the option to correct the defect or submit a plan to correct the defect for approval by the Department within 30 days.
2053182 Primary Facility 2012-03-13 Routine/Complete Inspection No Violations Noted Please refer to Baker 1H 3-13-12 inspection report regarding details of the investigation. Permit number is 115-20471.
2077201 Primary Facility 2012-06-18 Routine/Complete Inspection Violation(s) Noted See inspection report for full details
2357033 Primary Facility 2015-04-01 Routine/Complete Inspection No Violations Noted
2414166 Primary Facility 2015-10-08 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:30 a.m., the wells were shut in with a crew working on the production lines, the cellar was about a quarter full of water with no bubbling detected, the (9x5) vent pipe was open and venting to a tank, there was 708psi on the production casing and 664psi on the production line. I took a walk around the site and everything looked OK.
2451828 Primary Facility 2016-01-21 Routine/Complete Inspection No Violations Noted The Department was on site to inspect the Baker well pad (ESX10-115-0029). The wells associated with the pad are as follows:

115-20471 115-20470 115-20469 115-20468 115-20467 115-20466 115-20465

The site was stable and well vegetated with no apparent erosional issues. There were no violations.

If there are any issues please feel free to contact me

2509567 Primary Facility 2016-07-28 Routine/Complete Inspection No Violations Noted The Department was on site to inspect the Baker well pad (ESX10-115-0029). The wells associated with the pad are as follows:

115-20471 115-20470 115-20469 115-20468 115-20467 115-20466 115-20465

The site was stable and well vegetated with no apparent erosional issues. There were no violations.

If there are any issues please feel free to contact me.

2511745 Primary Facility 2016-08-17 Site Restoration No Violations Noted The Department was on site to conduct a Notice of Termination on the Baker well pad (ESX10-115-0029 (1)). The wells associated with the pad are as follows:

115-20471 115-20470 115-20469 115-20468 115-20467 115-20466 115-20465

The site was rocky, but where there was enough soil for growth, vegetation was meeting or exceeding the 70% vegetative standard.  There were a few remaining BMPs (silt sock) and these were promptly removed by Carrizo employees.  Off the access road to the Impoundment and Well Site the landowner constructed an earthwork gun range, well vegetated and stable.  This is causing no impact to the site or access road.  
The area was stable and had no erosional issues at this time and it is recommended that this Notice of Termination be APPROVED. 

There were no violations.

If there are any issues please feel free to contact me.

2512490 Primary Facility 2016-08-22 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:00p.m., the cellar had water at the bottom with no bubbling noticed; the (9x5) vent pipe was open and venting into a tank. There was 649psi on the production casing and 371psi on the production line. I took a walk around the location and everything looked OK.

I left the site at 13:40p.m.

2606527 Primary Facility 2017-06-21 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:35a.m.

The cellar had water at the bottom with no bubbling noticed. The (9x5) annulus vent pipe was open and venting into the production tank. There was 472psi on the production casing and 449psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 11:20a.m.

2713029 Primary Facility 2018-03-28 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was empty and there was no gas detected. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2817019 Primary Facility 2018-12-18 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was empty and there was no gas detected with a MSA Altair 5X multi gas detector that was calibrated on 12/3/18. The permit number for the 4H on the entrance sign was incorrect (see photo #2). It was 155-20468 and should be 115-20468. I contacted Jesse Bonnice of BKV to have it corrected. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2851753 Primary Facility 2019-03-11 Routine/Complete Inspection No Violations Noted I performed a Routine Complete (RTNC) inspection of the Baker Well Pad on March 11, 2019. The weather was sunny and relatively warm, around 38 degrees.

The access road was a bit muddy but not unstable. The access road is quite long, passing some small logging operations, as well as a target shooting range situated along its length.

The well pad surface was plowed and mostly wet but stable. The wellheads were encased in a carport structure. They were surrounded by clean gravel and were properly labeled.

The containment surrounding the production tanks and apparatus was mostly empty and had sufficient freeboard.

The cut and fill slopes of the site were rocky and stable. Where there was sufficient soil, there was adequate vegetation. No areas of instability were noted.

The impoundment on site was full to capacity. It would be recommended to draw down the impoundment to prevent overflow and possible resulting E&S issues.

There were no violations noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2077201 642176 06/18/2012 2012-06-18 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety
2077201 642177 06/18/2012 2012-06-18 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety

For data sources see[8]

References