If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-051-24208 | | Well ID: 37-051-24208 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 39.769181, -79.807842 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Pennsylvania |
|- | |- | ||
− | | | + | | County: [[Fayette_County,_Pennsylvania|Fayette]] |
|- | |- | ||
− | | | + | | Municipality: [[Springhill Township,_Fayette_County,_Pennsylvania|Springhill Township]] |
|- | |- | ||
− | | | + | | Operator Name: [[DIVERSIFIED OIL & GAS LLC]] |
|- | |- | ||
− | | | + | | Well Pad ID: [[147169]] |
|- | |- | ||
− | | | + | | Farm/Lease Name: ROBINSON 29 |
|- | |- | ||
− | | | + | | License Status: Active |
|- | |- | ||
− | | | + | | Spud Date: 06/04/2009 |
|- | |- | ||
− | | | + | | Permit Date: 5/7/2009 |
|- | |- | ||
− | | Well | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Vertical Well |
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.769181 |
|- | |- | ||
| Longitude: -79.807842 | | Longitude: -79.807842 | ||
− | |||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
− | + | !scope="col" | Water Production Days | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
− | | | + | | 2009 |
− | | style="text-align:right;" | | + | | [[ATLAS RESOURCES LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 13,955.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 109 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | | ||
|- | |- | ||
+ | | 2010 | ||
+ | | [[ATLAS RESOURCES LLC]] | ||
+ | | style="text-align: right;" | 34,659.00 | ||
+ | | style="text-align: right;" | 329 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | style="text-align:right;" | | + | | [[ATLAS RESOURCES LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 19,411.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2012 | ||
+ | | [[ATLAS RESOURCES LLC]] | ||
+ | | style="text-align: right;" | 15,023.00 | ||
+ | | style="text-align: right;" | 356 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2013 |
− | | style="text-align:right;" | | + | | [[ATLAS RESOURCES LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 13,508.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2014 | ||
+ | | [[ATLAS RESOURCES LLC]] | ||
+ | | style="text-align: right;" | 13,801.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2015 |
− | | style="text-align:right;" | | + | | [[ATLAS RESOURCES LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 10,212.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2016 | ||
+ | | [[ATLAS RESOURCES LLC]] | ||
+ | | style="text-align: right;" | 5,551.00 | ||
+ | | style="text-align: right;" | 353 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2017 |
− | | style="text-align:right;" | | + | | [[ATLAS RESOURCES LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 4,095.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2018 | ||
+ | | [[ATLAS RESOURCES LLC]] | ||
+ | | style="text-align: right;" | 3,207.00 | ||
+ | | style="text-align: right;" | 304 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2019 |
− | + | | [[DIVERSIFIED OIL & GAS LLC]] | |
− | + | | style="text-align: right;" | 823.00 | |
− | + | | style="text-align: right;" | 90 | |
− | + | | style="text-align: right;" | 0.00 | |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 0.00 | |
− | + | | style="text-align: right;" | 0 | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | 0. | ||
− | | style="text-align:right;" | 0 | ||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | | ||
− | |||
− | | style="text-align:right;" | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Production Reports |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-03-31 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | | + | !scope="col" | Waste Facility ID |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2009-A00 |
− | | | + | | Brine |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 415.00 Bbl |
− | + | | Municipal Sewage Treatment Plant | |
− | | | + | | |
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
+ | | 2009-A00 | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 1,085.00 Bbl | ||
+ | | Other | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2009-A00 |
− | | | + | | Brine |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 115.00 Bbl |
− | + | | Reuse other than road spreading | |
− | | | ||
| | | | ||
− | | | + | |- |
+ | | 2009-A00 | ||
+ | | Drilling | ||
+ | | style="text-align: right;" | 1,780.00 Bbl | ||
+ | | Brine or Industrial Waste Treatment Plt | ||
+ | | PA0091472 | ||
+ | |- | ||
+ | | 2009-A00 | ||
+ | | Drilling | ||
+ | | style="text-align: right;" | 395.00 Bbl | ||
+ | | Municipal Sewage Treatment Plant | ||
| | | | ||
− | |||
|- | |- | ||
+ | | 2009-A00 | ||
+ | | Drilling | ||
+ | | style="text-align: right;" | 100.00 Bbl | ||
+ | | Other | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2009-A00 |
− | | | + | | Fracking Fluid |
− | | style="text-align:right;" | 1. | + | | style="text-align: right;" | 1,618.00 Bbl |
− | + | | Brine or Industrial Waste Treatment Plt | |
− | | | ||
| PA0091472 | | PA0091472 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2009-A00 | ||
+ | | Fracking Fluid | ||
+ | | style="text-align: right;" | 355.00 Bbl | ||
+ | | Brine or Industrial Waste Treatment Plt | ||
+ | | PA0101508 | ||
|- | |- | ||
− | | | + | | 2009-A00 |
− | | | + | | Fracking Fluid |
− | | style="text-align:right;" | 9. | + | | style="text-align: right;" | 9,000.00 Bbl |
− | + | | Municipal Sewage Treatment Plant | |
− | | | + | | |
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
+ | | 2009-A00 | ||
+ | | Fracking Fluid | ||
+ | | style="text-align: right;" | 310.00 Bbl | ||
+ | | Other | ||
+ | | | ||
|- | |- | ||
− | | 2010- | + | | 2010-A01 |
− | | | + | | Drilling Fluid Waste (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 395.00 Bbl |
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | 301353 |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2010- | + | | 2010-A01 |
− | | | + | | Drilling Fluid Waste (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 1,780.00 Bbl |
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0091472 |
− | |||
− | |||
− | |||
|- | |- | ||
− | + | | 2010-A01 | |
− | | 2010- | + | | Drilling Fluid Waste (in Barrels) |
− | | | + | | style="text-align: right;" | 100.00 Bbl |
− | | style="text-align:right;" | | ||
− | |||
| IDENTIFY METHOD IN COMMENTS | | IDENTIFY METHOD IN COMMENTS | ||
| | | | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2010-A01 | ||
+ | | Fracing Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 9,000.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 101674 | ||
+ | |- | ||
+ | | 2010-A01 | ||
+ | | Fracing Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 9,280.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 301353 | ||
|- | |- | ||
− | | 2010- | + | | 2010-A01 |
− | | | + | | Fracing Fluid Waste (in Barrels) |
− | | style="text-align:right;" | 1. | + | | style="text-align: right;" | 1,618.00 Bbl |
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0091472 | | PA0091472 | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | + | | 2010-A01 | |
− | | 2010- | + | | Fracing Fluid Waste (in Barrels) |
− | | | + | | style="text-align: right;" | 355.00 Bbl |
− | | style="text-align:right;" | | ||
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0101508 |
− | |||
− | |||
− | |||
|- | |- | ||
− | + | | 2010-A01 | |
− | | 2010- | + | | Fracing Fluid Waste (in Barrels) |
− | | | + | | style="text-align: right;" | 310.00 Bbl |
− | | style="text-align:right;" | | ||
− | |||
| IDENTIFY METHOD IN COMMENTS | | IDENTIFY METHOD IN COMMENTS | ||
| | | | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2010-A01 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 515.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 301353 | ||
|- | |- | ||
− | | | + | | 2010-A01 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 3,874.00 Bbl |
− | + | | IDENTIFY METHOD IN COMMENTS | |
− | | | ||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
+ | | 2010-S01 | ||
+ | | Drilling Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 197.50 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 301353 | ||
|- | |- | ||
− | | | + | | 2010-S01 |
− | | | + | | Drilling Fluid Waste (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 890.00 Bbl |
− | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
− | | | + | | PA0091472 |
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
− | |- | + | | 2010-S01 |
− | | | + | | Drilling Fluid Waste (in Barrels) |
− | + | | style="text-align: right;" | 50.00 Bbl | |
− | | style="text-align:right;" | | + | | IDENTIFY METHOD IN COMMENTS |
− | |||
− | | | ||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
+ | | 2010-S01 | ||
+ | | Fracing Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 4,500.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 101674 | ||
|- | |- | ||
− | | | + | | 2010-S01 |
− | | | + | | Fracing Fluid Waste (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 4,640.00 Bbl |
− | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
− | | | + | | 301353 |
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
− | |- | + | | 2010-S01 |
− | | | + | | Fracing Fluid Waste (in Barrels) |
− | + | | style="text-align: right;" | 809.00 Bbl | |
− | | style="text-align:right;" | | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| PA0091472 | | PA0091472 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2010-S01 | ||
+ | | Fracing Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 177.50 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0101508 | ||
|- | |- | ||
− | | | + | | 2010-S01 |
− | | | + | | Fracing Fluid Waste (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 155.00 Bbl |
− | + | | IDENTIFY METHOD IN COMMENTS | |
− | | | ||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
+ | | 2010-S01 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 257.50 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 301353 | ||
|- | |- | ||
− | | | + | | 2010-S01 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 1,937.00 Bbl |
− | + | | IDENTIFY METHOD IN COMMENTS | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | |||
− | |||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 302.00 Bbl |
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | 301353 |
− | |||
− | |||
− | |||
|- | |- | ||
− | + | | 2010-S02 | |
− | | 2010- | + | | Produced Fluid (in Barrels) |
− | | | + | | style="text-align: right;" | 1,325.00 Bbl |
− | | style="text-align:right;" | 1. | ||
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | + | | 2010-S02 | |
− | | 2010- | + | | Produced Fluid (in Barrels) |
− | | | + | | style="text-align: right;" | 93.00 Bbl |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | 93. | ||
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| WMGR123SW001 | | WMGR123SW001 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2010-S02 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 165.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WVR000521948 | ||
|- | |- | ||
− | | 2010- | + | | 2010-S02 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | 197. | + | | style="text-align: right;" | 197.00 Bbl |
− | |||
| IDENTIFY METHOD IN COMMENTS | | IDENTIFY METHOD IN COMMENTS | ||
| 34-167-29359 | | 34-167-29359 | ||
− | | | + | |- |
+ | | 2010-S02 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 916.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
− | | 2011- | + | | 2011-S01 |
− | | | + | | Fracing Fluid Waste (in Barrels) |
− | | style="text-align:right;" | 388. | + | | style="text-align: right;" | 388.00 Bbl |
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
+ | | 2011-S01 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 100.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 301353 | ||
|- | |- | ||
− | | 2011- | + | | 2011-S01 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 179.00 Bbl |
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | 34-099-23127 |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2011- | + | | 2011-S01 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | 376. | + | | style="text-align: right;" | 376.00 Bbl |
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095273 | | PA0095273 | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2011- | + | | 2011-S01 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | 477. | + | | style="text-align: right;" | 477.00 Bbl |
− | |||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-121-2-3995 | | 34-121-2-3995 | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | + | | 2011-S02 | |
− | | 2011- | + | | Fracing Fluid Waste (in Barrels) |
− | | | + | | style="text-align: right;" | 240.00 Bbl |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | 240. | ||
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2011- | + | | 2011-S02 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | 989. | + | | style="text-align: right;" | 989.00 Bbl |
− | |||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-121-2-3995 | | 34-121-2-3995 | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | + | | 2012-S01 | |
− | | 2012- | + | | Fracing Fluid Waste (in Barrels) |
− | | | + | | style="text-align: right;" | 1,088.00 Bbl |
− | | style="text-align:right;" | 1. | ||
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2012- | + | | 2012-S01 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | 481. | + | | style="text-align: right;" | 481.00 Bbl |
− | |||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-121-2-3995 | | 34-121-2-3995 | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | 2012- | + | | 2012-S01 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | 265. | + | | style="text-align: right;" | 265.00 Bbl |
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
− | + | | 2012-S02 | |
− | | 2012- | + | | Produced Fluid (in Barrels) |
− | | | + | | style="text-align: right;" | 80.00 Bbl |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | style="text-align:right;" | 80. | ||
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| WMGR123SW001 | | WMGR123SW001 | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | + | | 2012-S02 | |
− | | 2012- | + | | Produced Fluid (in Barrels) |
− | | | + | | style="text-align: right;" | 86.00 Bbl |
− | | style="text-align:right;" | 86. | ||
− | |||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-121-23995 | | 34-121-23995 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2012-S02 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 1,055.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
− | | 2013- | + | | 2013-S01 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | 1. | + | | style="text-align: right;" | 1,209.00 Bbl |
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
+ | | 2013-S02 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 58.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
|- | |- | ||
− | | 2013- | + | | 2013-S02 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | 1. | + | | style="text-align: right;" | 1,475.00 Bbl |
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
− | |- | + | | 2014-S01 |
− | | | + | | Produced Fluid (in Barrels) |
− | + | | style="text-align: right;" | 426.00 Bbl | |
− | | style="text-align:right;" | | ||
− | |||
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| 34-121-23995 | | 34-121-23995 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2014-S01 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 1,035.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
− | | 2014- | + | | 2014-S02 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | 1. | + | | style="text-align: right;" | 1,150.00 Bbl |
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
− | | | + | |- |
− | | | + | | 2015-S01 |
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 725.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
+ | | 2015-S02 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 232.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW001 | ||
|- | |- | ||
− | | | + | | 2015-S02 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 495.00 Bbl |
− | + | | REUSE OTHER THAN ROAD SPREADING | |
− | | | + | | |
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
+ | | 2016-S01 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 91.00 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW001 | ||
|- | |- | ||
− | | | + | | 2016-S01 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 87.00 Bbl |
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
− | | | + | |- |
− | | | + | | 2017-M03 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
+ | | style="text-align: right;" | 70.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2017-M04 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 70.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW001 | ||
+ | |- | ||
+ | | 2018-M08 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 44.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW010 | ||
+ | |- | ||
+ | | 2018-M10 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 50.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW010 | ||
+ | |- | ||
+ | | 2019-M02 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 15.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW010 | ||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Waste Reports |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-03-31 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
− | + | !scope="col" | Inspection Comments | |
− | !scope="col" | | ||
|- | |- | ||
| 1808130 | | 1808130 | ||
− | | | + | | Primary Facility |
+ | | 06/04/2009 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| MARCELLUS E&S CONTROLS IN PLACE. SITE STILL UNDER CONSTRUCTION. NO RIG ON LOCATION YET, PITS STILL NEED TO BE LINED | | MARCELLUS E&S CONTROLS IN PLACE. SITE STILL UNDER CONSTRUCTION. NO RIG ON LOCATION YET, PITS STILL NEED TO BE LINED | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1809952 | | 1809952 | ||
− | | | + | | Primary Facility |
+ | | 06/30/2009 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| MARCELLUS.YOST209 DROPPED 40KLBS ST. WT. NOBODY NOTIFIED DEP. TOP OF FISH@6802 BOTTOM@7250 IN 5TH ELK. ALMOST 800' WAS RETRIEVED, THE REST CANNOT BE RECOVERED. SUPERIOR WAS CEMENTING THE FISH WHEN I ARRIVED ON LOC. FISH IS A BHA CONSISTING OF HAMMER BIT, 240' OF 6.5" COLLARS, 180' OF DP. CM CHARLIE HAS BEEN ON LOC. FOR 30HRS. HE SAYS THEY WILL PLUG UP TO 6000' AND DRILL AROUND. DROP OCCURED 11AM ON 6-29.ONE FISHING ATTEMPT SUCCESSFUL AT 4AM ON 6-30. PERMIT NUMBER WAS MISSING FROM SITE ID SIGN. | | MARCELLUS.YOST209 DROPPED 40KLBS ST. WT. NOBODY NOTIFIED DEP. TOP OF FISH@6802 BOTTOM@7250 IN 5TH ELK. ALMOST 800' WAS RETRIEVED, THE REST CANNOT BE RECOVERED. SUPERIOR WAS CEMENTING THE FISH WHEN I ARRIVED ON LOC. FISH IS A BHA CONSISTING OF HAMMER BIT, 240' OF 6.5" COLLARS, 180' OF DP. CM CHARLIE HAS BEEN ON LOC. FOR 30HRS. HE SAYS THEY WILL PLUG UP TO 6000' AND DRILL AROUND. DROP OCCURED 11AM ON 6-29.ONE FISHING ATTEMPT SUCCESSFUL AT 4AM ON 6-30. PERMIT NUMBER WAS MISSING FROM SITE ID SIGN. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1809975 | | 1809975 | ||
− | | | + | | Primary Facility |
+ | | 07/02/2009 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| MARCELLUS SPOKE WITH RELIEF TP MIKE. MIKE SEEMS TO BE VERY INTELLIGENT AND KNOWS HIS RIG EXTREMELY WELL. HE WAS VERY HELPFUL AND COOPERATIVE. EVEN THOUGH THE INCIDENT DIDN'T HAPPEN ON HIS WATCH, I GAVE HIM MY CARD AND ASKED HIM TO NOTIFY ME IN THE FUTURE, PRIOR TO PLUGGING BACK AND DRILLING AROUND TOOLS. I WILL STOP BACK TO TALK TO THE OTHER TOOLPUSHER MIKE, AND MAKE SURE EVERYONE UNDERSTANDS OUR POSITON ON PLUGGING BACK AND DEVIATION. | | MARCELLUS SPOKE WITH RELIEF TP MIKE. MIKE SEEMS TO BE VERY INTELLIGENT AND KNOWS HIS RIG EXTREMELY WELL. HE WAS VERY HELPFUL AND COOPERATIVE. EVEN THOUGH THE INCIDENT DIDN'T HAPPEN ON HIS WATCH, I GAVE HIM MY CARD AND ASKED HIM TO NOTIFY ME IN THE FUTURE, PRIOR TO PLUGGING BACK AND DRILLING AROUND TOOLS. I WILL STOP BACK TO TALK TO THE OTHER TOOLPUSHER MIKE, AND MAKE SURE EVERYONE UNDERSTANDS OUR POSITON ON PLUGGING BACK AND DEVIATION. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1844285 | | 1844285 | ||
− | | | + | | Primary Facility |
+ | | 11/12/2009 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
− | |||
− | |||
− | |||
| | | | ||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Compliance Report |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-05-20 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == | + | <!--== Fracking Activities == |
− | {{ | + | ==== Fracking Jobs ==== |
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | ==References== | ||
+ | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-051-24208 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.769181,"lon":-79.807842,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Springhill Township | |
Operator Name: DIVERSIFIED OIL & GAS LLC | |
Well Pad ID: 147169 | |
Farm/Lease Name: ROBINSON 29 | |
License Status: Active | |
Spud Date: 06/04/2009 | |
Permit Date: 5/7/2009 | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Latitude: 39.769181 | |
Longitude: -79.807842 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | ATLAS RESOURCES LLC | 13,955.00 | 109 | 0.00 | 0.00 | ||
2010 | ATLAS RESOURCES LLC | 34,659.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2011 | ATLAS RESOURCES LLC | 19,411.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | ATLAS RESOURCES LLC | 15,023.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2013 | ATLAS RESOURCES LLC | 13,508.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | ATLAS RESOURCES LLC | 13,801.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | ATLAS RESOURCES LLC | 10,212.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | ATLAS RESOURCES LLC | 5,551.00 | 353 | 0.00 | 0 | 0.00 | 0 |
2017 | ATLAS RESOURCES LLC | 4,095.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | ATLAS RESOURCES LLC | 3,207.00 | 304 | 0.00 | 0 | 0.00 | 0 |
2019 | DIVERSIFIED OIL & GAS LLC | 823.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2009-A00 | Brine | 415.00 Bbl | Municipal Sewage Treatment Plant | |
2009-A00 | Brine | 1,085.00 Bbl | Other | |
2009-A00 | Brine | 115.00 Bbl | Reuse other than road spreading | |
2009-A00 | Drilling | 1,780.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009-A00 | Drilling | 395.00 Bbl | Municipal Sewage Treatment Plant | |
2009-A00 | Drilling | 100.00 Bbl | Other | |
2009-A00 | Fracking Fluid | 1,618.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009-A00 | Fracking Fluid | 355.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2009-A00 | Fracking Fluid | 9,000.00 Bbl | Municipal Sewage Treatment Plant | |
2009-A00 | Fracking Fluid | 310.00 Bbl | Other | |
2010-A01 | Drilling Fluid Waste (in Barrels) | 395.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-A01 | Drilling Fluid Waste (in Barrels) | 1,780.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010-A01 | Drilling Fluid Waste (in Barrels) | 100.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010-A01 | Fracing Fluid Waste (in Barrels) | 9,000.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2010-A01 | Fracing Fluid Waste (in Barrels) | 9,280.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-A01 | Fracing Fluid Waste (in Barrels) | 1,618.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010-A01 | Fracing Fluid Waste (in Barrels) | 355.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010-A01 | Fracing Fluid Waste (in Barrels) | 310.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010-A01 | Produced Fluid (in Barrels) | 515.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-A01 | Produced Fluid (in Barrels) | 3,874.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010-S01 | Drilling Fluid Waste (in Barrels) | 197.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-S01 | Drilling Fluid Waste (in Barrels) | 890.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010-S01 | Drilling Fluid Waste (in Barrels) | 50.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010-S01 | Fracing Fluid Waste (in Barrels) | 4,500.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2010-S01 | Fracing Fluid Waste (in Barrels) | 4,640.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-S01 | Fracing Fluid Waste (in Barrels) | 809.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010-S01 | Fracing Fluid Waste (in Barrels) | 177.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010-S01 | Fracing Fluid Waste (in Barrels) | 155.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010-S01 | Produced Fluid (in Barrels) | 257.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-S01 | Produced Fluid (in Barrels) | 1,937.00 Bbl | IDENTIFY METHOD IN COMMENTS | |
2010-S02 | Produced Fluid (in Barrels) | 302.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-S02 | Produced Fluid (in Barrels) | 1,325.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010-S02 | Produced Fluid (in Barrels) | 93.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2010-S02 | Produced Fluid (in Barrels) | 165.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WVR000521948 |
2010-S02 | Produced Fluid (in Barrels) | 197.00 Bbl | IDENTIFY METHOD IN COMMENTS | 34-167-29359 |
2010-S02 | Produced Fluid (in Barrels) | 916.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S01 | Fracing Fluid Waste (in Barrels) | 388.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S01 | Produced Fluid (in Barrels) | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011-S01 | Produced Fluid (in Barrels) | 179.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
2011-S01 | Produced Fluid (in Barrels) | 376.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011-S01 | Produced Fluid (in Barrels) | 477.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011-S02 | Fracing Fluid Waste (in Barrels) | 240.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S02 | Produced Fluid (in Barrels) | 989.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2012-S01 | Fracing Fluid Waste (in Barrels) | 1,088.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S01 | Produced Fluid (in Barrels) | 481.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2012-S01 | Produced Fluid (in Barrels) | 265.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S02 | Produced Fluid (in Barrels) | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012-S02 | Produced Fluid (in Barrels) | 86.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2012-S02 | Produced Fluid (in Barrels) | 1,055.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S01 | Produced Fluid (in Barrels) | 1,209.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 58.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2013-S02 | Produced Fluid (in Barrels) | 1,475.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Produced Fluid (in Barrels) | 426.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014-S01 | Produced Fluid (in Barrels) | 1,035.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S02 | Produced Fluid (in Barrels) | 1,150.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S01 | Produced Fluid (in Barrels) | 725.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Produced Fluid (in Barrels) | 232.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015-S02 | Produced Fluid (in Barrels) | 495.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 91.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 87.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 70.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 70.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 44.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 50.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 15.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1808130 | Primary Facility | 06/04/2009 | Drilling/Alteration | No Violations Noted | MARCELLUS E&S CONTROLS IN PLACE. SITE STILL UNDER CONSTRUCTION. NO RIG ON LOCATION YET, PITS STILL NEED TO BE LINED |
1809952 | Primary Facility | 06/30/2009 | Drilling/Alteration | No Violations Noted | MARCELLUS.YOST209 DROPPED 40KLBS ST. WT. NOBODY NOTIFIED DEP. TOP OF FISH@6802 BOTTOM@7250 IN 5TH ELK. ALMOST 800' WAS RETRIEVED, THE REST CANNOT BE RECOVERED. SUPERIOR WAS CEMENTING THE FISH WHEN I ARRIVED ON LOC. FISH IS A BHA CONSISTING OF HAMMER BIT, 240' OF 6.5" COLLARS, 180' OF DP. CM CHARLIE HAS BEEN ON LOC. FOR 30HRS. HE SAYS THEY WILL PLUG UP TO 6000' AND DRILL AROUND. DROP OCCURED 11AM ON 6-29.ONE FISHING ATTEMPT SUCCESSFUL AT 4AM ON 6-30. PERMIT NUMBER WAS MISSING FROM SITE ID SIGN. |
1809975 | Primary Facility | 07/02/2009 | Drilling/Alteration | No Violations Noted | MARCELLUS SPOKE WITH RELIEF TP MIKE. MIKE SEEMS TO BE VERY INTELLIGENT AND KNOWS HIS RIG EXTREMELY WELL. HE WAS VERY HELPFUL AND COOPERATIVE. EVEN THOUGH THE INCIDENT DIDN'T HAPPEN ON HIS WATCH, I GAVE HIM MY CARD AND ASKED HIM TO NOTIFY ME IN THE FUTURE, PRIOR TO PLUGGING BACK AND DRILLING AROUND TOOLS. I WILL STOP BACK TO TALK TO THE OTHER TOOLPUSHER MIKE, AND MAKE SURE EVERYONE UNDERSTANDS OUR POSITON ON PLUGGING BACK AND DEVIATION. |
1844285 | Primary Facility | 11/12/2009 | Routine/Complete Inspection | No Violations Noted |
For data sources see[6]