X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-105-23691"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-105-23691
 
| Well ID: 34-105-23691
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.18833327, -82.27222095 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.188259734, -82.27234896 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Meigs County, Ohio|Meigs]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name: [[BANCEQUITY PETROLEUM CORP]]
+
| County: [[Meigs_County,_Ohio|Meigs]]
 +
|-
 +
| Municipality: [[Columbia,_Meigs_County,_Ohio|Columbia]]
 +
|-
 +
| Operator Name: [[BANCEQUITY PETROLEUM CORPORATI]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: PL LAWSON
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2013-04-04
 
|-
 
|-
 
| Spud Date: 2012-02-23
 
| Spud Date: 2012-02-23
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[BOWMAN DRILLING]]
 +
|-
 +
| Final Drill Date: 2012-02-25
 +
|-
 +
| Well Total Depth: 1465 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 39.188259734
 
|-
 
|-
| Violations: 0
+
| Longitude: -82.27234896
 +
|}
 +
For data sources see<ref name=RBDMS>{{cite web
 +
| title = RBDMS
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" style="width: 50%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Latitude: 39.18833327
+
| 2013-04-03
|-
+
| style="text-align: right;" | 1260
| Longitude: -82.27222095
+
| style="text-align: right;" | 1269
 +
| style="text-align: right;" | 10
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref name = RBDMS/>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Period
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Oil Quantity (bbl)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2011-0
+
| 2011
| style="text-align:right;" | 0.0
+
| [[BANCEQUITY PETROLEUM CORPORATI]]
|  
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
|-
|  
+
| 2012
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| style="text-align: right;" | 154
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 115
 +
|-
 +
| 2013
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| style="text-align: right;" | 1908
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 115
 +
|-
 +
| 2014
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| style="text-align: right;" | 2348
 +
| style="text-align: right;" | 74
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| style="text-align: right;" | 1142
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 76
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 +
|-
 +
|}
 +
For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web
 +
| title = Ohio Combined Annual Production Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2011
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" |
 +
|-
 +
| 2012
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| Brine
 +
| style="text-align: right;" | 326
 +
| style="text-align: right;" | 115
 
|-
 
|-
 +
| 2013
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| Brine
 +
| style="text-align: right;" | 1375
 +
| style="text-align: right;" | 115
 
|-
 
|-
| 2012-0
+
| 2014
| style="text-align:right;" | 154.0
+
| [[BANCEQUITY PETROLEUM CORPORATI]]
|
+
| Brine
|
+
| style="text-align: right;" | 20240
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2015
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| Brine
 +
| style="text-align: right;" | 7830
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2013-0
+
| 2016
| style="text-align:right;" | 1908.0
+
| [[BANCEQUITY PETROLEUM CORPORATI]]
|
+
| Brine
|
+
| style="text-align: right;" | 1354
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2017
 +
| [[BANCEQUITY PETROLEUM CORPORATI]]
 +
| Brine
 +
| style="text-align: right;" | 1357
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2014-0
+
| 2018
| style="text-align:right;" | 2348.0
+
| [[BANCEQUITY PETROLEUM CORPORATI]]
| style="text-align:right;" | 365.0
+
| Brine
|  
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 74.0
 
| style="text-align:right;" | 365.0
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
For data sources see<ref name=RBDMS/><ref name=Annual_Prod/>
| title = Ohio Department of Natural Resources RBDMS
 
| publisher = [http://oilandgas.ohiodnr.gov/]
 
| date = 2015-06-19
 
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
 
| accessdate = 2015-06-20 }}</ref>
 
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| 0085498506
 +
| 2012-08-02
 +
| Preliminary Restoration
 +
| No Violations
 +
| Area graded, and pits closed. Two joints of 7 remain on site and vegetative cover has not been established yet. The 7 and the 4 1/2 are shut-in and no lines or pumping unit is at the site.
 +
|-
 +
| 0545658887
 +
| 2012-02-24
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Drilling status check. A mud pump was on site and a large pit had been dug to handle the water from the Big Injun. Sixty feet of blow line was being used. Currently down to 925 and plan to set surface tonight.
 
|-
 
|-
 
| 1329927866
 
| 1329927866
 
| 2012-02-22
 
| 2012-02-22
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Verifying location of well.
 
| Verifying location of well.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1330146322
 
| 1330146322
 
| 2012-02-25
 
| 2012-02-25
|  
+
| Drill / Deepen /  Reopen
| Witnessed the surface cement job. 1017' of new 17 lb/ft  7 casing set in 1035' of borehole with 158 sacks of class A cement, 400 lbs gel, 450 lb calcium, and 165 lb lost circulation material.. Circulation established and good returns seen at the surface. The cement top dropped roughly 60' and was grouted to the surface.
+
| No Violations
|
+
| Witnessed the surface cement job. 1017 of new 17 lb/ft  7 casing set in 1035 of borehole with 158 sacks of class A cement, 400 lbs gel, 450 lb calcium, and 165 lb lost circulation material.. Circulation established and good returns seen at the surface. The cement top dropped roughly 60 and was grouted to the surface.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1346780990
 
| 1346780990
 
| 2012-09-04
 
| 2012-09-04
|  
+
| Completion Testing
 +
| No Violations
 
| Witnessed perforation of production casing. 10 shots from 1260-1269 feet through 4 1/2 casing.
 
| Witnessed perforation of production casing. 10 shots from 1260-1269 feet through 4 1/2 casing.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1346789717
 
| 1346789717
 
| 2012-09-04
 
| 2012-09-04
|  
+
| Production Wells
 +
| No Violations
 
| Arrived at 0930 hrs on location and met Josh Garland and Jake Glascock to witness frac job on this well.  Appalachian Well Services had already run the Cement Bond/Casing Collar logs to locate Berea sandstone before perforations.  They then perfed the Berea.  Producer Services Corp was preparing to frac the perfs.  They were using 20% gel, sand proppant, and water.  Did not witness the frac.  Had to move with Josh to the next project, a mechanical integrity test on J D Drillings ERP #7 (API 3410521995). Before we left, said hello to Mike McPeak, Bankequity Petroleum and his helper, Jesse.
 
| Arrived at 0930 hrs on location and met Josh Garland and Jake Glascock to witness frac job on this well.  Appalachian Well Services had already run the Cement Bond/Casing Collar logs to locate Berea sandstone before perforations.  They then perfed the Berea.  Producer Services Corp was preparing to frac the perfs.  They were using 20% gel, sand proppant, and water.  Did not witness the frac.  Had to move with Josh to the next project, a mechanical integrity test on J D Drillings ERP #7 (API 3410521995). Before we left, said hello to Mike McPeak, Bankequity Petroleum and his helper, Jesse.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -2124149206
+
| 2124149206
 
| 2012-04-23
 
| 2012-04-23
|  
+
| Preliminary Restoration
 +
| No Violations
 
| Pits have been closed.
 
| Pits have been closed.
|
 
|
 
|
 
 
|-
 
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref name=RBDMS/>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
| 2012-08-04
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 34543 Gal
 +
| style="text-align: right;" | 17000
 +
| [[Producers Service Corporation]]
 +
| Frac job not witnessed. Witnessed perforation of production casing from 1260-1269 with 10 shots.
 
|-
 
|-
| -545658887
+
|}
| 2012-02-24
+
For data sources see<ref name = RBDMS/>
|
+
== Well History ==
| Drilling status check. A mud pump was on site and a large pit had been dug to handle the water from the Big Injun. Sixty feet of blow line was being used. Currently down to 925' and plan to set surface tonight.
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" style="text-align: center"| Well Status
|  
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
|  
+
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
 +
| APP
 +
| 2011-12-06
 +
| Proposed Formations:BEREA, Issued Date:12/6/2011, Expired Date:12/5/2013 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:EOUT
 
|-
 
|-
| 85498506
+
| Reached Total Depth
| 2012-08-02
+
| 2012-02-25
 
|  
 
|  
| Area graded, and pits closed. Two joints of 7 remain on site and vegetative cover has not been established yet. The 7 and the 4 1/2 are shut-in and no lines or pumping unit is at the site.
+
|-
 +
| Completion Report Received
 +
| 2013-04-02
 
|  
 
|  
 +
|-
 +
| Construction Permit Expires
 +
| 2013-12-05
 
|  
 
|  
 +
|-
 +
| Record Last Modified
 +
| 2017-02-15
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
For data sources see<ref name=RBDMS/>
| title = Ohio Department of Natural Resources RBDMS
+
==References==
| publisher = [http://oilandgas.ohiodnr.gov/]
+
<references/>
| date = 2015-06-19
 
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 
| accessdate = 2015-06-20 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 17:42, 19 July 2019

Well Details

Well ID: 34-105-23691
Loading map...
Country: United States
State: Ohio
County: Meigs
Municipality: Columbia
Operator Name: BANCEQUITY PETROLEUM CORPORATI
Well Pad ID:
Farm/Lease Name: PL LAWSON
License Status: Producing
License Date: 2013-04-04
Spud Date: 2012-02-23
Spud Drilling Contractor: BOWMAN DRILLING
Final Drill Date: 2012-02-25
Well Total Depth: 1465 ft
Configuration: Vertical
Latitude: 39.188259734
Longitude: -82.27234896

For data sources see[1]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-04-03 1260 1269 10

For data sources see[1]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 BANCEQUITY PETROLEUM CORPORATI 0 0 0
2012 BANCEQUITY PETROLEUM CORPORATI 154 0 115
2013 BANCEQUITY PETROLEUM CORPORATI 1908 0 115
2014 BANCEQUITY PETROLEUM CORPORATI 2348 74 365
2015 BANCEQUITY PETROLEUM CORPORATI 1142 0 365
2016 BANCEQUITY PETROLEUM CORPORATI 0 76 365
2017 BANCEQUITY PETROLEUM CORPORATI 0 0 365
2018 BANCEQUITY PETROLEUM CORPORATI 0 0 365

For data sources see[1][2]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 BANCEQUITY PETROLEUM CORPORATI Brine 0
2012 BANCEQUITY PETROLEUM CORPORATI Brine 326 115
2013 BANCEQUITY PETROLEUM CORPORATI Brine 1375 115
2014 BANCEQUITY PETROLEUM CORPORATI Brine 20240 365
2015 BANCEQUITY PETROLEUM CORPORATI Brine 7830 365
2016 BANCEQUITY PETROLEUM CORPORATI Brine 1354 365
2017 BANCEQUITY PETROLEUM CORPORATI Brine 1357 365
2018 BANCEQUITY PETROLEUM CORPORATI Brine 0 365

For data sources see[1][2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0085498506 2012-08-02 Preliminary Restoration No Violations Area graded, and pits closed. Two joints of 7 remain on site and vegetative cover has not been established yet. The 7 and the 4 1/2 are shut-in and no lines or pumping unit is at the site.
0545658887 2012-02-24 Drill / Deepen / Reopen No Violations Drilling status check. A mud pump was on site and a large pit had been dug to handle the water from the Big Injun. Sixty feet of blow line was being used. Currently down to 925 and plan to set surface tonight.
1329927866 2012-02-22 Drill / Deepen / Reopen No Violations Verifying location of well.
1330146322 2012-02-25 Drill / Deepen / Reopen No Violations Witnessed the surface cement job. 1017 of new 17 lb/ft 7 casing set in 1035 of borehole with 158 sacks of class A cement, 400 lbs gel, 450 lb calcium, and 165 lb lost circulation material.. Circulation established and good returns seen at the surface. The cement top dropped roughly 60 and was grouted to the surface.
1346780990 2012-09-04 Completion Testing No Violations Witnessed perforation of production casing. 10 shots from 1260-1269 feet through 4 1/2 casing.
1346789717 2012-09-04 Production Wells No Violations Arrived at 0930 hrs on location and met Josh Garland and Jake Glascock to witness frac job on this well. Appalachian Well Services had already run the Cement Bond/Casing Collar logs to locate Berea sandstone before perforations. They then perfed the Berea. Producer Services Corp was preparing to frac the perfs. They were using 20% gel, sand proppant, and water. Did not witness the frac. Had to move with Josh to the next project, a mechanical integrity test on J D Drillings ERP #7 (API 3410521995). Before we left, said hello to Mike McPeak, Bankequity Petroleum and his helper, Jesse.
2124149206 2012-04-23 Preliminary Restoration No Violations Pits have been closed.

For data sources see[1]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-08-04 H2O 0 34543 Gal 17000 Producers Service Corporation Frac job not witnessed. Witnessed perforation of production casing from 1260-1269 with 10 shots.

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-12-06 Proposed Formations:BEREA, Issued Date:12/6/2011, Expired Date:12/5/2013 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2012-02-25
Completion Report Received 2013-04-02
Construction Permit Expires 2013-12-05
Record Last Modified 2017-02-15

For data sources see[1]

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "RBDMS". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21. 
  2. 2.0 2.1 "Ohio Combined Annual Production Data". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21.