If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-105-23691 | | Well ID: 34-105-23691 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.188259734, -82.27234896 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | Operator Name: [[BANCEQUITY PETROLEUM | + | | County: [[Meigs_County,_Ohio|Meigs]] |
+ | |- | ||
+ | | Municipality: [[Columbia,_Meigs_County,_Ohio|Columbia]] | ||
+ | |- | ||
+ | | Operator Name: [[BANCEQUITY PETROLEUM CORPORATI]] | ||
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: PL LAWSON |
|- | |- | ||
− | | | + | | License Status: Producing |
|- | |- | ||
− | | | + | | License Date: 2013-04-04 |
|- | |- | ||
| Spud Date: 2012-02-23 | | Spud Date: 2012-02-23 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[BOWMAN DRILLING]] |
+ | |- | ||
+ | | Final Drill Date: 2012-02-25 | ||
+ | |- | ||
+ | | Well Total Depth: 1465 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | | + | | Latitude: 39.188259734 |
|- | |- | ||
− | | | + | | Longitude: -82.27234896 |
+ | |} | ||
+ | For data sources see<ref name=RBDMS>{{cite web | ||
+ | | title = RBDMS | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" style="width: 50%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | | | + | | 2013-04-03 |
− | |- | + | | style="text-align: right;" | 1260 |
− | | | + | | style="text-align: right;" | 1269 |
+ | | style="text-align: right;" | 10 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref name = RBDMS/> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Period |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Operator Name |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Gas Quantity (mcf) |
− | !scope="col" | + | !scope="col" style="text-align: center"| Oil Quantity (bbl) |
− | + | !scope="col" style="text-align: center"| Production Days | |
− | !scope="col" | ||
− | |||
|- | |- | ||
− | | 2011-0 | + | | 2011 |
− | | style="text-align:right;" | 0 | + | | [[BANCEQUITY PETROLEUM CORPORATI]] |
− | | | + | | style="text-align: right;" | 0 |
− | | | + | | style="text-align: right;" | 0 |
− | | | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | 0.0 | + | |- |
− | | | + | | 2012 |
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | style="text-align: right;" | 154 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 115 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | style="text-align: right;" | 1908 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 115 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | style="text-align: right;" | 2348 | ||
+ | | style="text-align: right;" | 74 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | style="text-align: right;" | 1142 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 76 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web | ||
+ | | title = Ohio Combined Annual Production Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 326 | ||
+ | | style="text-align: right;" | 115 | ||
|- | |- | ||
+ | | 2013 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 1375 | ||
+ | | style="text-align: right;" | 115 | ||
|- | |- | ||
− | | | + | | 2014 |
− | | style="text-align:right;" | | + | | [[BANCEQUITY PETROLEUM CORPORATI]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 20240 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2015 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 7830 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | style="text-align:right;" | | + | | [[BANCEQUITY PETROLEUM CORPORATI]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 1354 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2017 | ||
+ | | [[BANCEQUITY PETROLEUM CORPORATI]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 1357 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2018 |
− | + | | [[BANCEQUITY PETROLEUM CORPORATI]] | |
− | + | | Brine | |
− | | | + | | style="text-align: right;" | 0 |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | 365 | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/><ref name=Annual_Prod/> |
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | + | |- |
− | + | | 0085498506 | |
+ | | 2012-08-02 | ||
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | Area graded, and pits closed. Two joints of 7 remain on site and vegetative cover has not been established yet. The 7 and the 4 1/2 are shut-in and no lines or pumping unit is at the site. | ||
+ | |- | ||
+ | | 0545658887 | ||
+ | | 2012-02-24 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Drilling status check. A mud pump was on site and a large pit had been dug to handle the water from the Big Injun. Sixty feet of blow line was being used. Currently down to 925 and plan to set surface tonight. | ||
|- | |- | ||
| 1329927866 | | 1329927866 | ||
| 2012-02-22 | | 2012-02-22 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| Verifying location of well. | | Verifying location of well. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1330146322 | | 1330146322 | ||
| 2012-02-25 | | 2012-02-25 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | Witnessed the surface cement job. 1017 | + | | No Violations |
− | + | | Witnessed the surface cement job. 1017 of new 17 lb/ft 7 casing set in 1035 of borehole with 158 sacks of class A cement, 400 lbs gel, 450 lb calcium, and 165 lb lost circulation material.. Circulation established and good returns seen at the surface. The cement top dropped roughly 60 and was grouted to the surface. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1346780990 | | 1346780990 | ||
| 2012-09-04 | | 2012-09-04 | ||
− | | | + | | Completion Testing |
+ | | No Violations | ||
| Witnessed perforation of production casing. 10 shots from 1260-1269 feet through 4 1/2 casing. | | Witnessed perforation of production casing. 10 shots from 1260-1269 feet through 4 1/2 casing. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1346789717 | | 1346789717 | ||
| 2012-09-04 | | 2012-09-04 | ||
− | | | + | | Production Wells |
+ | | No Violations | ||
| Arrived at 0930 hrs on location and met Josh Garland and Jake Glascock to witness frac job on this well. Appalachian Well Services had already run the Cement Bond/Casing Collar logs to locate Berea sandstone before perforations. They then perfed the Berea. Producer Services Corp was preparing to frac the perfs. They were using 20% gel, sand proppant, and water. Did not witness the frac. Had to move with Josh to the next project, a mechanical integrity test on J D Drillings ERP #7 (API 3410521995). Before we left, said hello to Mike McPeak, Bankequity Petroleum and his helper, Jesse. | | Arrived at 0930 hrs on location and met Josh Garland and Jake Glascock to witness frac job on this well. Appalachian Well Services had already run the Cement Bond/Casing Collar logs to locate Berea sandstone before perforations. They then perfed the Berea. Producer Services Corp was preparing to frac the perfs. They were using 20% gel, sand proppant, and water. Did not witness the frac. Had to move with Josh to the next project, a mechanical integrity test on J D Drillings ERP #7 (API 3410521995). Before we left, said hello to Mike McPeak, Bankequity Petroleum and his helper, Jesse. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2124149206 |
| 2012-04-23 | | 2012-04-23 | ||
− | | | + | | Preliminary Restoration |
+ | | No Violations | ||
| Pits have been closed. | | Pits have been closed. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref name=RBDMS/> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | == Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
+ | |- | ||
+ | | 2012-08-04 | ||
+ | | H2O | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 34543 Gal | ||
+ | | style="text-align: right;" | 17000 | ||
+ | | [[Producers Service Corporation]] | ||
+ | | Frac job not witnessed. Witnessed perforation of production casing from 1260-1269 with 10 shots. | ||
|- | |- | ||
− | | | + | |} |
− | + | For data sources see<ref name = RBDMS/> | |
− | + | == Well History == | |
− | | | + | {| class="wikitable sortable" width="95%" |
− | | | + | !scope="col" style="text-align: center"| Well Status |
− | | | + | !scope="col" style="width: 15%;text-align: center"| Well Status Date |
− | | | + | !scope="col" style="text-align: center"| Comment |
|- | |- | ||
+ | | APP | ||
+ | | 2011-12-06 | ||
+ | | Proposed Formations:BEREA, Issued Date:12/6/2011, Expired Date:12/5/2013 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:EOUT | ||
|- | |- | ||
− | | | + | | Reached Total Depth |
− | | 2012- | + | | 2012-02-25 |
| | | | ||
− | | | + | |- |
+ | | Completion Report Received | ||
+ | | 2013-04-02 | ||
| | | | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2013-12-05 | ||
| | | | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-02-15 | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/> |
− | + | ==References== | |
− | + | <references/> | |
− | |||
− | |||
− | |||
− | == References == | ||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-105-23691 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.188259734,"lon":-82.27234896,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Columbia | |
Operator Name: BANCEQUITY PETROLEUM CORPORATI | |
Well Pad ID: | |
Farm/Lease Name: PL LAWSON | |
License Status: Producing | |
License Date: 2013-04-04 | |
Spud Date: 2012-02-23 | |
Spud Drilling Contractor: BOWMAN DRILLING | |
Final Drill Date: 2012-02-25 | |
Well Total Depth: 1465 ft | |
Configuration: Vertical | |
Latitude: 39.188259734 | |
Longitude: -82.27234896 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-04-03 | 1260 | 1269 | 10 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BANCEQUITY PETROLEUM CORPORATI | 0 | 0 | 0 |
2012 | BANCEQUITY PETROLEUM CORPORATI | 154 | 0 | 115 |
2013 | BANCEQUITY PETROLEUM CORPORATI | 1908 | 0 | 115 |
2014 | BANCEQUITY PETROLEUM CORPORATI | 2348 | 74 | 365 |
2015 | BANCEQUITY PETROLEUM CORPORATI | 1142 | 0 | 365 |
2016 | BANCEQUITY PETROLEUM CORPORATI | 0 | 76 | 365 |
2017 | BANCEQUITY PETROLEUM CORPORATI | 0 | 0 | 365 |
2018 | BANCEQUITY PETROLEUM CORPORATI | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BANCEQUITY PETROLEUM CORPORATI | Brine | 0 | |
2012 | BANCEQUITY PETROLEUM CORPORATI | Brine | 326 | 115 |
2013 | BANCEQUITY PETROLEUM CORPORATI | Brine | 1375 | 115 |
2014 | BANCEQUITY PETROLEUM CORPORATI | Brine | 20240 | 365 |
2015 | BANCEQUITY PETROLEUM CORPORATI | Brine | 7830 | 365 |
2016 | BANCEQUITY PETROLEUM CORPORATI | Brine | 1354 | 365 |
2017 | BANCEQUITY PETROLEUM CORPORATI | Brine | 1357 | 365 |
2018 | BANCEQUITY PETROLEUM CORPORATI | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0085498506 | 2012-08-02 | Preliminary Restoration | No Violations | Area graded, and pits closed. Two joints of 7 remain on site and vegetative cover has not been established yet. The 7 and the 4 1/2 are shut-in and no lines or pumping unit is at the site. |
0545658887 | 2012-02-24 | Drill / Deepen / Reopen | No Violations | Drilling status check. A mud pump was on site and a large pit had been dug to handle the water from the Big Injun. Sixty feet of blow line was being used. Currently down to 925 and plan to set surface tonight. |
1329927866 | 2012-02-22 | Drill / Deepen / Reopen | No Violations | Verifying location of well. |
1330146322 | 2012-02-25 | Drill / Deepen / Reopen | No Violations | Witnessed the surface cement job. 1017 of new 17 lb/ft 7 casing set in 1035 of borehole with 158 sacks of class A cement, 400 lbs gel, 450 lb calcium, and 165 lb lost circulation material.. Circulation established and good returns seen at the surface. The cement top dropped roughly 60 and was grouted to the surface. |
1346780990 | 2012-09-04 | Completion Testing | No Violations | Witnessed perforation of production casing. 10 shots from 1260-1269 feet through 4 1/2 casing. |
1346789717 | 2012-09-04 | Production Wells | No Violations | Arrived at 0930 hrs on location and met Josh Garland and Jake Glascock to witness frac job on this well. Appalachian Well Services had already run the Cement Bond/Casing Collar logs to locate Berea sandstone before perforations. They then perfed the Berea. Producer Services Corp was preparing to frac the perfs. They were using 20% gel, sand proppant, and water. Did not witness the frac. Had to move with Josh to the next project, a mechanical integrity test on J D Drillings ERP #7 (API 3410521995). Before we left, said hello to Mike McPeak, Bankequity Petroleum and his helper, Jesse. |
2124149206 | 2012-04-23 | Preliminary Restoration | No Violations | Pits have been closed. |
For data sources see[1]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-08-04 | H2O | 0 | 34543 Gal | 17000 | Producers Service Corporation | Frac job not witnessed. Witnessed perforation of production casing from 1260-1269 with 10 shots. |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-12-06 | Proposed Formations:BEREA, Issued Date:12/6/2011, Expired Date:12/5/2013 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2012-02-25 | |
Completion Report Received | 2013-04-02 | |
Construction Permit Expires | 2013-12-05 | |
Record Last Modified | 2017-02-15 |
For data sources see[1]