X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-115-24671"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-115-24671
 
| Well ID: 34-115-24671
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.73090573, -81.91418226 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.730836149, -81.91432322 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Morgan County, Ohio|Morgan]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Morgan_County,_Ohio|Morgan]]
 +
|-
 +
| Municipality: [[Bloom,_Morgan_County,_Ohio|Bloom]]
 
|-
 
|-
 
| Operator Name: [[ARTEX OIL COMPANY]]
 
| Operator Name: [[ARTEX OIL COMPANY]]
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: DETWEILER UNIT
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2013-03-21
 
|-
 
|-
 
| Spud Date: 2013-03-15
 
| Spud Date: 2013-03-15
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[KILBARGER DRLG]]
 +
|-
 +
| Final Drill Date: 2013-03-31
 +
|-
 +
| Well Total Depth: 6665 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 39.730836149
 
|-
 
|-
| Violations: 0
+
| Longitude: -81.91432322
 +
|}
 +
For data sources see<ref name=RBDMS>{{cite web
 +
| title = RBDMS
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" style="width: 50%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Latitude: 39.73090573
+
| 2014-03-07
|-
+
| style="text-align: right;" | 6364
| Longitude: -81.91418226
+
| style="text-align: right;" | 6584
 +
| style="text-align: right;" | 117
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref name = RBDMS/>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Period
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Oil Quantity (bbl)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | OIL QUANTITY
+
|-
!scope="col" | OIL PRODUCTION DAYS
+
| 2013
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 21
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 30098
 +
| style="text-align: right;" | 639
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 50760
 +
| style="text-align: right;" | 815
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 17413
 +
| style="text-align: right;" | 173
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2013-0
+
| 2017
| style="text-align:right;" | 0.0
+
| [[ARTEX OIL COMPANY]]
|  
+
| style="text-align: right;" | 7929
|  
+
| style="text-align: right;" | 121
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 21.0
+
|-
|  
+
| 2018
 +
| [[ARTEX OIL COMPANY]]
 +
| style="text-align: right;" | 9973
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 365
 +
|-
 +
|}
 +
For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web
 +
| title = Ohio Combined Annual Production Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2013
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 3680
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 16634
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 13072
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 12994
 +
| style="text-align: right;" | 365
 
|-
 
|-
 +
| 2017
 +
| [[ARTEX OIL COMPANY]]
 +
| Brine
 +
| style="text-align: right;" | 8556
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2014-0
+
| 2018
| style="text-align:right;" | 30098.0
+
| [[ARTEX OIL COMPANY]]
| style="text-align:right;" | 365.0
+
| Brine
|  
+
| style="text-align: right;" | 24106
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 639.0
 
| style="text-align:right;" | 365.0
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
For data sources see<ref name=RBDMS/><ref name=Annual_Prod/>
| title = Ohio Department of Natural Resources RBDMS
 
| publisher = [http://oilandgas.ohiodnr.gov/]
 
| date = 2015-06-19
 
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
 
| accessdate = 2015-06-20 }}</ref>
 
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| 0172534849
 +
| 2013-06-18
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Artex had dug ditches for the placement of the production lines and there was straw stacked on location. They are in the process of seeding and mulching the lcoation.
 +
|-
 +
| 0587186355
 +
| 2013-10-30
 +
| Preliminary Restoration
 +
| No Violations
 +
| Preliminary restoration is passed in accordance to 1509.072.
 +
|-
 +
| 0603729202
 +
| 2013-06-03
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artexs most recently drilled wells. The access road and well location have been recently graded and the operator will be out in the next few weeks to disc till, seed and mulch the access road and well location.
 
|-
 
|-
 
| 1363295307
 
| 1363295307
 
| 2013-03-14
 
| 2013-03-14
|  
+
| Drill / Deepen /  Reopen
| I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 739'. The casing shoe depth was 687'. Centralizers were not run on the surface casing and the baffle insert was at a depth of 654'. There was an issue with casing length which did not allow enough room for wellhead and placement of the BOP. Operator had to head to Logan for a pup joint. Formation cement on location. Once the pup joint arrived and was connected to the casing, formation set up and began cement job. The plug was down at 9:21pm with good cement returns, and casing pressure was held at 600 psi for 5 minutes.
+
| No Violations
|
+
| I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 739. The casing shoe depth was 687. Centralizers were not run on the surface casing and the baffle insert was at a depth of 654. There was an issue with casing length which did not allow enough room for wellhead and placement of the BOP. Operator had to head to Logan for a pup joint. Formation cement on location. Once the pup joint arrived and was connected to the casing, formation set up and began cement job. The plug was down at 9:21pm with good cement returns, and casing pressure was held at 600 psi for 5 minutes.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1369850646
 
| 1369850646
 
| 2013-05-29
 
| 2013-05-29
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Contract dozer operator was on location grading the access road. He previously graded the wellhead location. I went back to well location and the operator had filled the pit and graded the area. I will come back when operator is finished with restoration.
 
| Contract dozer operator was on location grading the access road. He previously graded the wellhead location. I went back to well location and the operator had filled the pit and graded the area. I will come back when operator is finished with restoration.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1492187248
 
| 1492187248
 
| 2013-04-03
 
| 2013-04-03
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| All drilling equipment has been removed from location. There is still an open pit filled with drilling fluid. Well was logged on Sunday and Artex has not yet stimulated well.
 
| All drilling equipment has been removed from location. There is still an open pit filled with drilling fluid. Well was logged on Sunday and Artex has not yet stimulated well.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 +
For data sources see<ref name=RBDMS/>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
| 2013-04-09
 +
| ACID
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 21950 Gal
 +
| style="text-align: right;" | 0
 
|  
 
|  
 
|  
 
|  
|
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref name = RBDMS/>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2013-02-27
 +
| Proposed Formations:QUEENSTON THRU KNOX, Issued Date:2/27/2013, Expired Date:2/27/2015 12:00:00 PM, Drilling unit acres:72, Proposed Well Type:OG, Proposed Well Class:EDPW
 
|-
 
|-
| 172534849
+
| Reached Total Depth
| 2013-06-18
+
| 2013-03-31
|
+
| GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
| Artex had dug ditches for the placement of the production lines and there was straw stacked on location. They are in the process of seeding and mulching the lcoation.
 
|
 
|
 
|  
 
 
|-
 
|-
 +
| Completion Report Received
 +
| 2013-08-27
 +
| GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
 
|-
 
|-
| 587186355
+
| APP
| 2013-10-30
+
| 2019-06-11
|
+
| Proposed Formations:BEEKMANTOWN, Issued Date:6/11/2019, Expired Date:6/10/2021 12:00:00 PM, Drilling unit acres:72, Proposed Well Type:OG, Proposed Well Class:
| Preliminary restoration is passed in accordance to 1509.072.
 
|
 
|
 
|  
 
 
|-
 
|-
 +
| Record Last Modified
 +
| 2019-06-14
 +
| GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
 
|-
 
|-
| 603729202
+
| Construction Permit Expires
| 2013-06-03
+
| 2021-06-10
|
+
| GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
| I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artex's most recently drilled wells. The access road and well location have been recently graded and the operator will be out in the next few weeks to disc till, seed and mulch the access road and well location.
 
|
 
|
 
|  
 
 
|-
 
|-
 
|}
 
|}
For data sources see<ref>{{cite web
+
For data sources see<ref name=RBDMS/>
| title = Ohio Department of Natural Resources RBDMS
+
==References==
| publisher = [http://oilandgas.ohiodnr.gov/]
+
<references/>
| date = 2015-06-19
 
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
 
| accessdate = 2015-06-20 }}</ref>
 
== References ==
 
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 01:44, 21 July 2019

Well Details

Well ID: 34-115-24671
Loading map...
Country: United States
State: Ohio
County: Morgan
Municipality: Bloom
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: DETWEILER UNIT
License Status: Producing
License Date: 2013-03-21
Spud Date: 2013-03-15
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2013-03-31
Well Total Depth: 6665 ft
Configuration: Vertical
Latitude: 39.730836149
Longitude: -81.91432322

For data sources see[1]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-03-07 6364 6584 117

For data sources see[1]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ARTEX OIL COMPANY 0 21 365
2014 ARTEX OIL COMPANY 30098 639 365
2015 ARTEX OIL COMPANY 50760 815 365
2016 ARTEX OIL COMPANY 17413 173 365
2017 ARTEX OIL COMPANY 7929 121 365
2018 ARTEX OIL COMPANY 9973 100 365

For data sources see[1][2]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ARTEX OIL COMPANY Brine 3680 365
2014 ARTEX OIL COMPANY Brine 16634 365
2015 ARTEX OIL COMPANY Brine 13072 365
2016 ARTEX OIL COMPANY Brine 12994 365
2017 ARTEX OIL COMPANY Brine 8556 365
2018 ARTEX OIL COMPANY Brine 24106 365

For data sources see[1][2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0172534849 2013-06-18 Drill / Deepen / Reopen No Violations Artex had dug ditches for the placement of the production lines and there was straw stacked on location. They are in the process of seeding and mulching the lcoation.
0587186355 2013-10-30 Preliminary Restoration No Violations Preliminary restoration is passed in accordance to 1509.072.
0603729202 2013-06-03 Drill / Deepen / Reopen No Violations I accompanied Joe Schneider and Frank Riggle in the field to review the restoration work at all of Artexs most recently drilled wells. The access road and well location have been recently graded and the operator will be out in the next few weeks to disc till, seed and mulch the access road and well location.
1363295307 2013-03-14 Drill / Deepen / Reopen No Violations I was on location to witness the cementing of the 9 5/8 surface casing. The Killbarger IDECO Rig #17 drilled a 12 1/4 hole to a TD of 739. The casing shoe depth was 687. Centralizers were not run on the surface casing and the baffle insert was at a depth of 654. There was an issue with casing length which did not allow enough room for wellhead and placement of the BOP. Operator had to head to Logan for a pup joint. Formation cement on location. Once the pup joint arrived and was connected to the casing, formation set up and began cement job. The plug was down at 9:21pm with good cement returns, and casing pressure was held at 600 psi for 5 minutes.
1369850646 2013-05-29 Drill / Deepen / Reopen No Violations Contract dozer operator was on location grading the access road. He previously graded the wellhead location. I went back to well location and the operator had filled the pit and graded the area. I will come back when operator is finished with restoration.
1492187248 2013-04-03 Drill / Deepen / Reopen No Violations All drilling equipment has been removed from location. There is still an open pit filled with drilling fluid. Well was logged on Sunday and Artex has not yet stimulated well.

For data sources see[1]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-04-09 ACID 15 21950 Gal 0

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-02-27 Proposed Formations:QUEENSTON THRU KNOX, Issued Date:2/27/2013, Expired Date:2/27/2015 12:00:00 PM, Drilling unit acres:72, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-03-31 GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
Completion Report Received 2013-08-27 GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
APP 2019-06-11 Proposed Formations:BEEKMANTOWN, Issued Date:6/11/2019, Expired Date:6/10/2021 12:00:00 PM, Drilling unit acres:72, Proposed Well Type:OG, Proposed Well Class:
Record Last Modified 2019-06-14 GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A
Construction Permit Expires 2021-06-10 GMM FIRST PRODUCTION DATE UPDATED TO 06/27/2014 PER FORM 6A

For data sources see[1]

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "RBDMS". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21. 
  2. 2.0 2.1 "Ohio Combined Annual Production Data". Ohio Department of Natural Resources. 2019-05-07. Retrieved 2019-05-21.