If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-115-24675 | | Well ID: 34-115-24675 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.667811670, -81.98501117 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: | + | | State: Ohio |
+ | |- | ||
+ | | County: [[Morgan_County,_Ohio|Morgan]] | ||
+ | |- | ||
+ | | Municipality: [[Deerfield,_Morgan_County,_Ohio|Deerfield]] | ||
|- | |- | ||
| Operator Name: [[ARTEX OIL COMPANY]] | | Operator Name: [[ARTEX OIL COMPANY]] | ||
Line 13: | Line 17: | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: PATTERSON-REED UNIT |
|- | |- | ||
− | | | + | | License Status: Final Restoration |
|- | |- | ||
− | | | + | | License Date: 2015-08-28 |
|- | |- | ||
| Spud Date: 2013-07-03 | | Spud Date: 2013-07-03 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[KILBARGER DRLG]] |
+ | |- | ||
+ | | Final Drill Date: 2013-07-25 | ||
+ | |- | ||
+ | | Well Total Depth: 6395 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | | + | | Latitude: 39.667811670 |
|- | |- | ||
− | | | + | | Longitude: -81.98501117 |
+ | |} | ||
+ | For data sources see<ref name=RBDMS>{{cite web | ||
+ | | title = RBDMS | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" style="width: 50%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | | | + | | 2014-11-12 |
− | |- | + | | style="text-align: right;" | 6251 |
− | | | + | | style="text-align: right;" | 6307 |
+ | | style="text-align: right;" | 96 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref name = RBDMS/> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Period |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Operator Name |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Production Days |
− | !scope="col" | | + | |- |
− | !scope="col" | | + | | 2013 |
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 23 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | style="text-align: right;" | 3025 | ||
+ | | style="text-align: right;" | 84 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | style="text-align: right;" | 1151 | ||
+ | | style="text-align: right;" | 112 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref name=RBDMS/><ref name = Annual_Prod>{{cite web | ||
+ | | title = Ohio Combined Annual Production Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
|- | |- | ||
− | | 2013 | + | | 2013 |
− | | style="text-align:right;" | | + | | [[ARTEX OIL COMPANY]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 5850 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2014 | ||
+ | | [[ARTEX OIL COMPANY]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 6177 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2015 |
− | + | | [[ARTEX OIL COMPANY]] | |
− | + | | Brine | |
− | | | + | | style="text-align: right;" | 1290 |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | 365 | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/><ref name=Annual_Prod/> |
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | + | |- |
− | + | | 0168104051 | |
+ | | 2013-07-24 | ||
+ | | Casing String Witnessed | ||
+ | | No Violations | ||
+ | | I was on location to witness the cementing of the 4.5 production casing. The TVD of the well was 6400 and the casing shoe was at 6395. Universal Well Services were on lcoation and set 97 sacks of Class A/Type 1 cement. | ||
+ | |- | ||
+ | | 0302644408 | ||
+ | | 2014-10-03 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Complaince Action Follow-up 2092618484: Area has been reseeded in order to better establish vegetation. Most areas have grass however not enough to pass restoration. I will continue to monitor this location. | ||
+ | |- | ||
+ | | 0315366260 | ||
+ | | 2015-08-06 | ||
+ | | Plug / Plug Back | ||
+ | | No Violations | ||
+ | | I was on location to finish out the plug job. We tagged the Berea plug first thin and it had slipped down hole 250ft so we ran tubing back to the Berea to reset the plug. After we pumped the Berea plug we waited an hour for cement to set up then established circulation again then pumped the bottom of the surface plug. We then pulled the tubing up to set the 200ft surface plug. The cement stayed at the surface. The well is now plugged. | ||
+ | |- | ||
+ | | 0356192585 | ||
+ | | 2013-09-09 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | There was a dozer grading the area when I arrived on location. The pit has been filled and all drilling equipment has been removed from the area. I will return again in a few weeks to check the preliminary restoration status. | ||
+ | |- | ||
+ | | 0508307694 | ||
+ | | 2015-07-30 | ||
+ | | Plug / Plug Back | ||
+ | | No Violations | ||
+ | | Bishop Well Services has moved there service rig in on this well to plug it. The bottom plug will be set through the 2 tubing. Formation Cementing arrived on site to pump on the well. We established circulation after 20bbl then pumped the 400ft plug to bottom using Class A cement. | ||
+ | |- | ||
+ | | 0937621360 | ||
+ | | 2013-10-21 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | The pumpjack, separator, and tanks are on location, however they are not hooked up yet to the wellhead. The operator has graded and seeded the area and the grass is just starting to grow around the location. Site does no quite meet preliminary restoration requirements so I will return in a few weeks to check up on their progress. | ||
+ | |- | ||
+ | | 0944235068 | ||
+ | | 2015-08-28 | ||
+ | | Final Restoration | ||
+ | | No Violations | ||
+ | | Final restoration meets 1509.072B. | ||
|- | |- | ||
| 1254450310 | | 1254450310 | ||
| 2014-10-21 | | 2014-10-21 | ||
− | | | + | | Preliminary Restoration |
+ | | No Violations | ||
| Site now correctly meets 1509.072 preliminary requirements. | | Site now correctly meets 1509.072 preliminary requirements. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1255740208 | | 1255740208 | ||
| 2013-07-09 | | 2013-07-09 | ||
− | | | + | | Casing String Witnessed |
− | | I was called to location to witness the cementing of the surface casing by Formation Cement CO at 430am. Due to heavy rain and flooding cementers arrived around 500am and the location was in very rough condition. Artex is using the Kilbarger Patterson #17 rig. The Kilbarger drilled a 12 1/4 hole to a TD of 740 | + | | No Violations |
− | + | | I was called to location to witness the cementing of the surface casing by Formation Cement CO at 430am. Due to heavy rain and flooding cementers arrived around 500am and the location was in very rough condition. Artex is using the Kilbarger Patterson #17 rig. The Kilbarger drilled a 12 1/4 hole to a TD of 740. Artex had miscalculated the casing and had to send of for a landing joint from Miller supply. They sent cementers and inspector off location. We arrived back on location around 900am and due to the thick amounts of mud and clay at the location, the cement truck ended up stuck for some time until a dozer could get it to proper spot for cement job. The casing shoe depth was 689. Centralizers were not run on the surface casing and the baffle insert was at a depth of 646. The plug was down at 12:30pm with good cement returns and pressure was held at 500psi for 5 minutes. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1372855519 | | 1372855519 | ||
| 2013-07-03 | | 2013-07-03 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | I arrived, after only given a 25 minute notice, to see cement trucks leaving location. Artex is using the Kilbarger Patterson #17 rig and Formation Cement Co. The hole was drilled to 90 | + | | No Violations |
− | + | | I arrived, after only given a 25 minute notice, to see cement trucks leaving location. Artex is using the Kilbarger Patterson #17 rig and Formation Cement Co. The hole was drilled to 90 and the conductor was set at 84. Heath told me it was a good cement job with good returns. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1373367730 | | 1373367730 | ||
| 2013-07-09 | | 2013-07-09 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | I was called to location in order to witness the cementing of the surface casing. There were multiple areas of flash flooding in and around the area. Artex had finished placing casing in the hole upon arrival, however when the cement trucks arrived it was determined by the operator that they had miscalculated casing by about 14 | + | | No Violations |
− | + | | I was called to location in order to witness the cementing of the surface casing. There were multiple areas of flash flooding in and around the area. Artex had finished placing casing in the hole upon arrival, however when the cement trucks arrived it was determined by the operator that they had miscalculated casing by about 14 and needed to obtain a pup joint from Miller Supply. Artex then told us the cement job will not happen for another 4-5 hours. | |
− | |||
− | |||
|- | |- | ||
+ | | 1438695541 | ||
+ | | 2015-08-04 | ||
+ | | Plug / Plug Back | ||
+ | | No Violations | ||
+ | | I was onsite to witness the rip plug for the 4.5 today. The 4.5 was ripped at 2981ft so we set a 400ft plug. The Clinton was behind pipe but we still set 400 plug for good isolation at the bottom of the 7. The 4.5 will be pulled then the rig crew will go back in and rip the 7. | ||
|- | |- | ||
− | | | + | | 1438778258 |
− | | | + | | 2015-08-05 |
− | | | + | | Plug / Plug Back |
− | | I was on | + | | No Violations |
− | + | | I was on site to witness the plugging of the well. Today Artex had Formation cementing on location to set the 7 rip plug and the Berea plug. We set 100ft plug at the 7 rip (2098-1998) then pulled the tubing up to set the Berea. Berea plug was set from (1367-1217). The tubing was then pulled out of the well to let the cement set up. The rig crew will run tools down hole to tag the plug in the morning. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 2092618484 | | 2092618484 | ||
| 2014-06-04 | | 2014-06-04 | ||
− | | | + | | Preliminary Restoration |
+ | | Violations Noted | ||
| The location has erosion issues and the operator needs to work on rebuilding the dike. There are two 210 bbl tanks in the dike. The well is currently shut in due to mechanical problems. I talked with Joe Schneider and he said he would have someone come out and till, seed, and mulch the location. He will also correct any dike and erosion issues. Site does not meet preliminary restoration requirements. | | The location has erosion issues and the operator needs to work on rebuilding the dike. There are two 210 bbl tanks in the dike. The well is currently shut in due to mechanical problems. I talked with Joe Schneider and he said he would have someone come out and till, seed, and mulch the location. He will also correct any dike and erosion issues. Site does not meet preliminary restoration requirements. | ||
+ | |- | ||
+ | |} | ||
+ | ==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | | 2092618484 | ||
+ | | US-OH-121373 | ||
+ | | 2014-10-28 | ||
| | | | ||
− | | | + | | Failure to restore within six months |
− | | | + | |- |
+ | |} | ||
+ | For data sources see<ref name=RBDMS/> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
|- | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
|- | |- | ||
− | | - | + | |}--> |
− | + | ||
− | | | + | == Well History == |
− | + | {| class="wikitable sortable" width="95%" | |
− | | | + | !scope="col" style="text-align: center"| Well Status |
− | | | + | !scope="col" style="width: 15%;text-align: center"| Well Status Date |
− | | | + | !scope="col" style="text-align: center"| Comment |
|- | |- | ||
+ | | APP | ||
+ | | 2013-04-18 | ||
+ | | Proposed Formations:BASE OF TRENTON TO BASE OF COPPER RIDGE, Issued Date:4/18/2013, Expired Date:4/18/2015 12:00:00 PM, Drilling unit acres:53.63, Proposed Well Type:OG, Proposed Well Class:POOL | ||
|- | |- | ||
− | | | + | | Reached Total Depth |
− | | 2013- | + | | 2013-07-25 |
− | |||
− | |||
− | |||
| | | | ||
+ | |- | ||
+ | | Completion Report Received | ||
+ | | 2014-11-21 | ||
| | | | ||
|- | |- | ||
+ | | APP | ||
+ | | 2015-07-31 | ||
+ | | Proposed Formations:BEEKMANTOWN, Issued Date:7/31/2015, Expired Date:7/30/2017 12:00:00 PM, Drilling unit acres:53.63, Proposed Well Type:OG, Proposed Well Class: | ||
|- | |- | ||
− | | | + | | Plugged/Abandoned |
− | | | + | | 2015-08-06 |
− | |||
− | |||
| | | | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-02-10 | ||
| | | | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2017-07-30 | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref | + | For data sources see<ref name=RBDMS/> |
− | + | ==References== | |
− | + | <references/> | |
− | |||
− | |||
− | |||
− | == References == | ||
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-115-24675 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.66781167,"lon":-81.98501117,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Deerfield | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: PATTERSON-REED UNIT | |
License Status: Final Restoration | |
License Date: 2015-08-28 | |
Spud Date: 2013-07-03 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2013-07-25 | |
Well Total Depth: 6395 ft | |
Configuration: Vertical | |
Latitude: 39.667811670 | |
Longitude: -81.98501117 |
For data sources see[1]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-11-12 | 6251 | 6307 | 96 |
For data sources see[1]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ARTEX OIL COMPANY | 0 | 23 | 365 |
2014 | ARTEX OIL COMPANY | 3025 | 84 | 365 |
2015 | ARTEX OIL COMPANY | 1151 | 112 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ARTEX OIL COMPANY | Brine | 5850 | 365 |
2014 | ARTEX OIL COMPANY | Brine | 6177 | 365 |
2015 | ARTEX OIL COMPANY | Brine | 1290 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0168104051 | 2013-07-24 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 4.5 production casing. The TVD of the well was 6400 and the casing shoe was at 6395. Universal Well Services were on lcoation and set 97 sacks of Class A/Type 1 cement. |
0302644408 | 2014-10-03 | Drill / Deepen / Reopen | No Violations | Complaince Action Follow-up 2092618484: Area has been reseeded in order to better establish vegetation. Most areas have grass however not enough to pass restoration. I will continue to monitor this location. |
0315366260 | 2015-08-06 | Plug / Plug Back | No Violations | I was on location to finish out the plug job. We tagged the Berea plug first thin and it had slipped down hole 250ft so we ran tubing back to the Berea to reset the plug. After we pumped the Berea plug we waited an hour for cement to set up then established circulation again then pumped the bottom of the surface plug. We then pulled the tubing up to set the 200ft surface plug. The cement stayed at the surface. The well is now plugged. |
0356192585 | 2013-09-09 | Drill / Deepen / Reopen | No Violations | There was a dozer grading the area when I arrived on location. The pit has been filled and all drilling equipment has been removed from the area. I will return again in a few weeks to check the preliminary restoration status. |
0508307694 | 2015-07-30 | Plug / Plug Back | No Violations | Bishop Well Services has moved there service rig in on this well to plug it. The bottom plug will be set through the 2 tubing. Formation Cementing arrived on site to pump on the well. We established circulation after 20bbl then pumped the 400ft plug to bottom using Class A cement. |
0937621360 | 2013-10-21 | Drill / Deepen / Reopen | No Violations | The pumpjack, separator, and tanks are on location, however they are not hooked up yet to the wellhead. The operator has graded and seeded the area and the grass is just starting to grow around the location. Site does no quite meet preliminary restoration requirements so I will return in a few weeks to check up on their progress. |
0944235068 | 2015-08-28 | Final Restoration | No Violations | Final restoration meets 1509.072B. |
1254450310 | 2014-10-21 | Preliminary Restoration | No Violations | Site now correctly meets 1509.072 preliminary requirements. |
1255740208 | 2013-07-09 | Casing String Witnessed | No Violations | I was called to location to witness the cementing of the surface casing by Formation Cement CO at 430am. Due to heavy rain and flooding cementers arrived around 500am and the location was in very rough condition. Artex is using the Kilbarger Patterson #17 rig. The Kilbarger drilled a 12 1/4 hole to a TD of 740. Artex had miscalculated the casing and had to send of for a landing joint from Miller supply. They sent cementers and inspector off location. We arrived back on location around 900am and due to the thick amounts of mud and clay at the location, the cement truck ended up stuck for some time until a dozer could get it to proper spot for cement job. The casing shoe depth was 689. Centralizers were not run on the surface casing and the baffle insert was at a depth of 646. The plug was down at 12:30pm with good cement returns and pressure was held at 500psi for 5 minutes. |
1372855519 | 2013-07-03 | Drill / Deepen / Reopen | No Violations | I arrived, after only given a 25 minute notice, to see cement trucks leaving location. Artex is using the Kilbarger Patterson #17 rig and Formation Cement Co. The hole was drilled to 90 and the conductor was set at 84. Heath told me it was a good cement job with good returns. |
1373367730 | 2013-07-09 | Drill / Deepen / Reopen | No Violations | I was called to location in order to witness the cementing of the surface casing. There were multiple areas of flash flooding in and around the area. Artex had finished placing casing in the hole upon arrival, however when the cement trucks arrived it was determined by the operator that they had miscalculated casing by about 14 and needed to obtain a pup joint from Miller Supply. Artex then told us the cement job will not happen for another 4-5 hours. |
1438695541 | 2015-08-04 | Plug / Plug Back | No Violations | I was onsite to witness the rip plug for the 4.5 today. The 4.5 was ripped at 2981ft so we set a 400ft plug. The Clinton was behind pipe but we still set 400 plug for good isolation at the bottom of the 7. The 4.5 will be pulled then the rig crew will go back in and rip the 7. |
1438778258 | 2015-08-05 | Plug / Plug Back | No Violations | I was on site to witness the plugging of the well. Today Artex had Formation cementing on location to set the 7 rip plug and the Berea plug. We set 100ft plug at the 7 rip (2098-1998) then pulled the tubing up to set the Berea. Berea plug was set from (1367-1217). The tubing was then pulled out of the well to let the cement set up. The rig crew will run tools down hole to tag the plug in the morning. |
2092618484 | 2014-06-04 | Preliminary Restoration | Violations Noted | The location has erosion issues and the operator needs to work on rebuilding the dike. There are two 210 bbl tanks in the dike. The well is currently shut in due to mechanical problems. I talked with Joe Schneider and he said he would have someone come out and till, seed, and mulch the location. He will also correct any dike and erosion issues. Site does not meet preliminary restoration requirements. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
2092618484 | US-OH-121373 | 2014-10-28 | Failure to restore within six months |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-04-18 | Proposed Formations:BASE OF TRENTON TO BASE OF COPPER RIDGE, Issued Date:4/18/2013, Expired Date:4/18/2015 12:00:00 PM, Drilling unit acres:53.63, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-07-25 | |
Completion Report Received | 2014-11-21 | |
APP | 2015-07-31 | Proposed Formations:BEEKMANTOWN, Issued Date:7/31/2015, Expired Date:7/30/2017 12:00:00 PM, Drilling unit acres:53.63, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2015-08-06 | |
Record Last Modified | 2017-02-10 | |
Construction Permit Expires | 2017-07-30 |
For data sources see[1]