If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-167-29753 | | Well ID: 34-167-29753 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.579251754, -81.28076585 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | Operator Name: | + | | County: [[Washington_County,_Ohio|Washington]] |
+ | |- | ||
+ | | Municipality: [[Liberty_Township,_Washington_County,_Ohio|Liberty Township]] | ||
+ | |- | ||
+ | | Operator Name: [[GAS ENTERPRISE COMPANY INC]] | ||
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: K-GOEBEL |
|- | |- | ||
− | | | + | | License Status: Drilling |
|- | |- | ||
− | | | + | | License Date: 2014-11-12 |
|- | |- | ||
| Spud Date: 2014-11-12 | | Spud Date: 2014-11-12 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: |
+ | |- | ||
+ | | Final Drill Date: | ||
+ | |- | ||
+ | | Well Total Depth: | ||
+ | |- | ||
+ | | Configuration: Vertical | ||
|- | |- | ||
− | | | + | | Latitude: 39.579251754 |
|- | |- | ||
− | | Well Status: | + | | Longitude: -81.28076585 |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
|- | |- | ||
− | | | + | | APP |
+ | | 2014-10-27 | ||
+ | | Proposed Formations:OHIO SHALE, Issued Date:10/27/2014, Expired Date:10/26/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL | ||
|- | |- | ||
− | | | + | | Construction Permit Expires |
+ | | 2016-10-26 | ||
+ | | | ||
|- | |- | ||
− | | | + | | Record Last Modified |
+ | | 2017-10-23 | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Stimulations Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Stimulation Date | ||
+ | !scope="col" style="text-align: center"| Chemical Agent | ||
+ | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) | ||
+ | !scope="col" style="text-align: center"| Fracking Fluid Volume | ||
+ | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) | ||
+ | !scope="col" style="text-align: center"| Fracking Company | ||
+ | !scope="col" style="text-align: center"| Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | |}--> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | ||
− | |||
|- | |- | ||
| 1415844879 | | 1415844879 | ||
| 2014-11-12 | | 2014-11-12 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | On location to witness cementing of 9.625 conductor casing. Upon arrival, Monroe Drilling had run 107 | + | | No Violations |
− | + | | On location to witness cementing of 9.625 conductor casing. Upon arrival, Monroe Drilling had run 107 of 9.625 conductor casing into 120 of 12 hole. Formation Cementing began pumping at 4:18 pm and good circulation was achieved at 4:24 pm. 50 sks of class A cement was pumped in and good cement returns were seen at the surface at 4:30 pm. The cement did not drop below surface level after pumping was stopped. | |
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2033554458 |
| 2014-11-18 | | 2014-11-18 | ||
− | | | + | | Drill / Deepen / Reopen |
− | | On location at 2:30 pm to witness the cementing of 7 surface casing for this well. Upon arrival, Monroe Drilling was running the last few joints of surface casing into the hole. Formation Cementing was on location rigging up. Hole depth was 1632 | + | | No Violations |
− | + | | On location at 2:30 pm to witness the cementing of 7 surface casing for this well. Upon arrival, Monroe Drilling was running the last few joints of surface casing into the hole. Formation Cementing was on location rigging up. Hole depth was 1632 and was drilled with an 8.75 bit. There was 1575 of 7 surface casing run into the hole. Formation Cementing began pumping at 5:15 pm and achieved good circulation at 5:35 pm. The hole was conditioned with 150 lbs of gel and cellophane flake as LCM. Good cement returns were seen 51 bbls into displacement at 6:02 pm. The wiper plug was landed at 6:08 pm and the casing was pressured up to 1050 psi and held for 5 minutes. There was no pressure bleed-off during this time frame, indicating a successful pressure test. 230 sks of 2% gel cement were used for this surface job. | |
− | |||
− | |||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-167-29753 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.579251754,"lon":-81.28076585,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Washington | |
Municipality: Liberty Township | |
Operator Name: GAS ENTERPRISE COMPANY INC | |
Well Pad ID: | |
Farm/Lease Name: K-GOEBEL | |
License Status: Drilling | |
License Date: 2014-11-12 | |
Spud Date: 2014-11-12 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.579251754 | |
Longitude: -81.28076585 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-10-27 | Proposed Formations:OHIO SHALE, Issued Date:10/27/2014, Expired Date:10/26/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Construction Permit Expires | 2016-10-26 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1415844879 | 2014-11-12 | Drill / Deepen / Reopen | No Violations | On location to witness cementing of 9.625 conductor casing. Upon arrival, Monroe Drilling had run 107 of 9.625 conductor casing into 120 of 12 hole. Formation Cementing began pumping at 4:18 pm and good circulation was achieved at 4:24 pm. 50 sks of class A cement was pumped in and good cement returns were seen at the surface at 4:30 pm. The cement did not drop below surface level after pumping was stopped. |
2033554458 | 2014-11-18 | Drill / Deepen / Reopen | No Violations | On location at 2:30 pm to witness the cementing of 7 surface casing for this well. Upon arrival, Monroe Drilling was running the last few joints of surface casing into the hole. Formation Cementing was on location rigging up. Hole depth was 1632 and was drilled with an 8.75 bit. There was 1575 of 7 surface casing run into the hole. Formation Cementing began pumping at 5:15 pm and achieved good circulation at 5:35 pm. The hole was conditioned with 150 lbs of gel and cellophane flake as LCM. Good cement returns were seen 51 bbls into displacement at 6:02 pm. The wiper plug was landed at 6:08 pm and the casing was pressured up to 1050 psi and held for 5 minutes. There was no pressure bleed-off during this time frame, indicating a successful pressure test. 230 sks of 2% gel cement were used for this surface job. |
For data sources see[3]