X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-111-24493"

m
m
Line 11: Line 11:
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
| County: [[Monroe_County,_Ohio|Monroe]]
 
|-
 
|-
| Municipality: [[Seneca,_Monroe_County,_Ohio|Seneca]]
+
| Municipality: [[Seneca_Township,_Monroe_County,_Ohio|Seneca Township]]
 
|-
 
|-
 
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
| Operator Name: [[ANTERO RESOURCES  CORPORATION]]
 
|-
 
|-
| Well Pad ID: [[1063]]
+
| Well Pad ID: [[001063]]
 
|-
 
|-
 
| Farm/Lease Name: LORADITCH SOUTH UNIT
 
| Farm/Lease Name: LORADITCH SOUTH UNIT
Line 37: Line 37:
 
| Longitude: -81.26112113
 
| Longitude: -81.26112113
 
|}
 
|}
For data sources see<ref name=RBDMS>{{cite web
+
For data sources see<ref>{{cite web
  | title = RBDMS
+
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2014-06-16
 +
| Proposed Formations:POINT PLEASANT, Issued Date:6/16/2014, Expired Date:6/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
 +
|-
 +
| APP
 +
| 2014-11-10
 +
| Proposed Formations:POINT PLEASANT, Issued Date:11/10/2014, Expired Date:11/9/2016 12:00:00 PM, Drilling unit acres:659.424, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Reached Total Depth
 +
| 2014-11-12
 +
|
 +
|-
 +
| APP
 +
| 2016-01-27
 +
| Proposed Formations:POINT PLEASANT, Issued Date:1/27/2016, Expired Date:1/26/2018 12:00:00 PM, Drilling unit acres:594.967, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Completion Report Received
 +
| 2018-08-22
 +
|
 +
|-
 +
| APP
 +
| 2018-11-29
 +
| Proposed Formations:POINT PLEASANT, Issued Date:11/29/2018, Expired Date:11/28/2020 12:00:00 PM, Drilling unit acres:594.967, Proposed Well Type:OG, Proposed Well Class:
 +
|-
 +
| Plugged/Abandoned
 +
| 2019-01-17
 +
|
 +
|-
 +
| Record Last Modified
 +
| 2019-04-30
 +
|
 +
|-
 +
| Construction Permit Expires
 +
| 2020-11-28
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  | date =  2019-05-07  
 
  | date =  2019-05-07  
Line 44: Line 93:
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 
<!--== Perforation Treatments ==
 
<!--== Perforation Treatments ==
{| class="wikitable sortable" style="width: 50%"
+
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Perforation Date
 
!scope="col" style="text-align: center"| Interval Top (ft)
 
!scope="col" style="text-align: center"| Interval Top (ft)
Line 51: Line 100:
 
|-
 
|-
 
|}-->
 
|}-->
 
+
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 
<!--== Production Data ==
 
<!--== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 61: Line 144:
 
|-
 
|-
 
|}-->
 
|}-->
 
 
<!--== Waste Data ==
 
<!--== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 71: Line 153:
 
|-
 
|-
 
|}-->
 
|}-->
 
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 133: Line 214:
 
|-
 
|-
 
|}-->
 
|}-->
For data sources see<ref name=RBDMS/>
+
For data sources see<ref>{{cite web
<!--== Fracking Activities ==
+
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
==== Fracking Jobs ====
+
|publisher = [[Ohio Department of Natural Resources]]
{| class="wikitable sortable" width="95%"
+
| date = 2019-05-07
!scope="col" style="text-align: center"| Job Number
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
!scope="col" style="text-align: center"| Job Start Date
+
| accessdate = 2019-05-21 }}</ref>
!scope="col" style="text-align: center"| Job End Date
 
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 
!scope="col" style="text-align: center"| Total Water Volume (gal)
 
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" style="width: 100%"
 
!scope="col" style="text-align: center"| Job Number
 
!scope="col" style="text-align: center"| Trade Name
 
!scope="col" style="text-align: center"| Supplier
 
!scope="col" style="text-align: center"| Purpose
 
!scope="col" style="text-align: center"| Ingredient Name
 
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 
!scope="col" style="text-align: center"| Additive Percentage by Mass
 
!scope="col" style="text-align: center"| Job Percentage by Mass
 
!scope="col" style="text-align: center"| Mass Used (lb)
 
|-
 
|}-->
 
 
 
<!--== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Stimulation Date
 
!scope="col" style="text-align: center"| Chemical Agent
 
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 
!scope="col" style="text-align: center"| Fracking Fluid Volume
 
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 
!scope="col" style="text-align: center"| Fracking Company
 
!scope="col" style="text-align: center"| Comments
 
|-
 
|}-->
 
 
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" style="text-align: center"| Well Status
 
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 
!scope="col" style="text-align: center"| Comment
 
|-
 
| APP
 
| 2014-06-16
 
| Proposed Formations:POINT PLEASANT, Issued Date:6/16/2014, Expired Date:6/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
 
|-
 
| APP
 
| 2014-11-10
 
| Proposed Formations:POINT PLEASANT, Issued Date:11/10/2014, Expired Date:11/9/2016 12:00:00 PM, Drilling unit acres:659.424, Proposed Well Type:OG, Proposed Well Class:POOL
 
|-
 
| Reached Total Depth
 
| 2014-11-12
 
|
 
|-
 
| APP
 
| 2016-01-27
 
| Proposed Formations:POINT PLEASANT, Issued Date:1/27/2016, Expired Date:1/26/2018 12:00:00 PM, Drilling unit acres:594.967, Proposed Well Type:OG, Proposed Well Class:POOL
 
|-
 
| Completion Report Received
 
| 2018-08-22
 
|
 
|-
 
| APP
 
| 2018-11-29
 
| Proposed Formations:POINT PLEASANT, Issued Date:11/29/2018, Expired Date:11/28/2020 12:00:00 PM, Drilling unit acres:594.967, Proposed Well Type:OG, Proposed Well Class:
 
|-
 
| Plugged/Abandoned
 
| 2019-01-17
 
|
 
|-
 
| Record Last Modified
 
| 2019-04-30
 
|
 
|-
 
| Construction Permit Expires
 
| 2020-11-28
 
|
 
|-
 
|}
 
For data sources see<ref name=RBDMS/>
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Revision as of 22:16, 23 July 2019

Well Details

Well ID: 34-111-24493
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: 001063
Farm/Lease Name: LORADITCH SOUTH UNIT
License Status: Final Restoration
License Date: 2019-03-01
Spud Date: 2014-09-15
Spud Drilling Contractor:
Final Drill Date: 2014-11-12
Well Total Depth: 2133 ft
Configuration: Horizontal
Latitude: 39.832124579
Longitude: -81.26112113

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-16 Proposed Formations:POINT PLEASANT, Issued Date:6/16/2014, Expired Date:6/15/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2014-11-10 Proposed Formations:POINT PLEASANT, Issued Date:11/10/2014, Expired Date:11/9/2016 12:00:00 PM, Drilling unit acres:659.424, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-11-12
APP 2016-01-27 Proposed Formations:POINT PLEASANT, Issued Date:1/27/2016, Expired Date:1/26/2018 12:00:00 PM, Drilling unit acres:594.967, Proposed Well Type:OG, Proposed Well Class:POOL
Completion Report Received 2018-08-22
APP 2018-11-29 Proposed Formations:POINT PLEASANT, Issued Date:11/29/2018, Expired Date:11/28/2020 12:00:00 PM, Drilling unit acres:594.967, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2019-01-17
Record Last Modified 2019-04-30
Construction Permit Expires 2020-11-28

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0311162274 2019-01-17 Plug / Plug Back No Violations On this day, I am onsite to witness the plugging operation conducted by Stalnaker Energy Corporation and Formation Cementing. Antero Representative Barney Etcher is onsite. The well was drilled to a depth of 2,153 feet with the 13.375 inch diameter intermediate casing string set at a depth of 2,133 feet, and never drilled out. 9-Energy ran a Cement Bond Log on 1/16/2019 confirming the casing was cemented to surface, and tagged bottom at a depth of 1,872 feet. Stalnaker Energy has a service rig on the hole with 2.375 inch diameter upset tubing set at a depth of 1,857 feet within the 13.375 inch diameter intermediate casing. The bottom plug covers approximately 310 feet (1857--1547) and consists of 230 sacks Class A Cement (48 barrels total volume) with 1.18 yield and a weight of 15.6 pounds per gallon. It was displaced with 6 barrels of fresh water. Then, 43 joints of tubing were pulled to a depth of 490 feet. The bottom of surface plug covers approximately 250 feet (490-240) and consists of 184 sacks Class A Cement (39 barrels total volume) with 1.18 yield and a weight of 15.6 pounds per gallon. It was displaced with 1 barrel of fresh water. Prior to the surface plug being set, the wellhead is being broken down below grade. It is welded together and will be cut off, before cementing. I spoke to ODNR Supervisor Mike Moreland, and the surface plug will be unwitnessed.
1125063932 2014-09-18 Casing String Witnessed No Violations Status check inspection found Rocky Mountain drillings top hole rig has drilled a 32 x 80 conductor borehole and set 80 of 26 conductor in place with a variance granted by the Division to set 80 of conductor due to being in solid limestone bedrock at 60 freshwater was also encountered at 27. Allied cement services are on location and cementing the casing using 228 sacks of class A-2% calcium .25 pps flake with 30% open hole excess ran and 46.5 barrels of fresh water used for cement displacement with good cement returns to surface. The hole was spudded on 09/15/14.
1415580951 2014-11-09 Casing String Witnessed No Violations On 11/09/2014 Dallas Morris rig # 24 is now on the hole and has drilled a 24x 387 surface borehole and ran 372 of 18.625 87.5# casing. Allied cement service is on location to cement the casing using 718 sacks of class A 2% calcium .25pps flake with 100 % open hole cement excess ran and 25 barrels of 6% gel ran ahead with the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug and good cement returns to surface.
1547479064 2019-01-14 Plug / Plug Back No Violations On this day, I spoke with Antero Company Representative Jayson Lukes during the inspection. The producing wells on the pad (permit numbers 4489, 4490, 4492, 4494) are being prepped per Anteros SIMOPS plan that was submitted and reviewed by the ODNR DOGRM, before Stalnaker Energy rigs-up for the plug and abandonment of permit numbers 4491 and 4493. TekSolv is currently onsite setting the back pressure valve. The producing wells have been blown down, are having back pressure valves installed in the tubing hangers, steel cages placed over the wellheads, LEL monitors in place, and concrete Jersey barriers spotted around the perimeter of the wellheads. It will be noted that a 2-way check valve will not be placed in the tubing, as the SIMOPS plan originally stated. I spoke with Jayson Lukes and ODNR Inspector Ken Frye about the amendment to the plan.
1547820812 2019-01-18 Plug / Plug Back No Violations On this day, I found that Stalnaker Energy has removed the wellhead and Formation Cementing set the surface plug from 100 back to surface with 92 sacks Class A cement weighing 15.6 pounds per gallon, and a 1.18 yield. A steel marker plate will be placed on the top of the casing, and the cellar will be filled with pea gravel. I spoke with ODNR Supervisor Brent Bear, and discussed that the cellar will be removed during the final restoration of the pad, but the company will fill the cellars with pea gravel until that process occurs.
2025321835 2018-03-07 Production Wells No Violations Status check inspection found a night cap installed on the B-section of the well head. Records indicate the well was drilled to the point of the 13.375 1st intermediate with conductor and 18.625 surface being set also. The drilling permit expired on 01/26/2018.
2093379237 2019-03-01 Final Restoration No Violations On this day, I am conducting a final restoration inspection. The pad has existing wells in production, and the cellar remains, but has been filled with gravel. Site meets ORC 1509.072 (B).

For data sources see[3]

References