X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-151-25657"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-151-25657
 
| Well ID: 34-151-25657
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.84460146, -81.10850165 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.844542762, -81.10868130 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Stark County, Ohio|Stark]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name: [[C & T ENERGY OF EAST CANTON]]
+
| County: [[Stark_County,_Ohio|Stark]]
 +
|-
 +
| Municipality: [[Washington_Township,_Stark_County,_Ohio|Washington Township]]
 +
|-
 +
| Operator Name: [[C & T ENERGY OF EAST CANTON IN]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: CHAPMAN UNIT
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2009-09-10
 
|-
 
|-
 
| Spud Date: 2008-12-03
 
| Spud Date: 2008-12-03
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[ADVENT DRLG]]
 +
|-
 +
| Final Drill Date: 2008-12-09
 +
|-
 +
| Well Total Depth: 5510 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 40.844542762
 +
|-
 +
| Longitude: -81.10868130
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2008-10-31
 +
| Proposed Formations:CLINTON, Issued Date:10/31/2008, Expired Date:10/31/2009 6:00:00 AM, Drilling unit acres:40.21, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Reached Total Depth
 +
| 2008-12-09
 +
 +
|-
 +
| Completion Report Received
 +
| 2009-05-22
 +
 +
|-
 +
| Construction Permit Expires
 +
| 2009-10-31
 +
 
|-
 
|-
| Violations: 0
+
| Record Last Modified
 +
| 2017-02-15
 +
 
|-
 
|-
| Latitude: 40.84460146
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Longitude: -81.10850165
+
| 2009-09-10
 +
| style="text-align: right;" | 5327
 +
| style="text-align: right;" | 5388
 +
| style="text-align: right;" | 59
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Stimulation Date
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Chemical Agent
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Fracking Fluid Volume
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
!scope="col" | OIL QUANTITY
+
!scope="col" style="text-align: center"| Fracking Company
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| 2009-0
 
| style="text-align:right;" | 5638.0
 
 
|  
 
|  
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 171000 Gal
 +
| style="text-align: right;" | 100000
 
|  
 
|  
 
|  
 
|  
| style="text-align:right;" | 827.0
 
|
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2009
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 5638
 +
| style="text-align: right;" | 827
 +
| style="text-align: right;" | 214
 +
|-
 +
| 2010
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 6221
 +
| style="text-align: right;" | 630
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2011
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 3744
 +
| style="text-align: right;" | 431
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 2634
 +
| style="text-align: right;" | 405
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2013
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 2727
 +
| style="text-align: right;" | 321
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 3703
 +
| style="text-align: right;" | 228
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 3334
 +
| style="text-align: right;" | 234
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 5254
 +
| style="text-align: right;" | 287
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 4143
 +
| style="text-align: right;" | 170
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| style="text-align: right;" | 4280
 +
| style="text-align: right;" | 291
 +
| style="text-align: right;" | 365
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2009
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| Brine
 +
| style="text-align: right;" | 770
 +
| style="text-align: right;" | 214
 
|-
 
|-
| 2010-0
+
| 2010
| style="text-align:right;" | 6221.0
+
| [[C & T ENERGY OF EAST CANTON IN]]
|
+
| Brine
|
+
| style="text-align: right;" | 350
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 630.0
 
|
 
 
|-
 
|-
 +
| 2011
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| Brine
 +
| style="text-align: right;" | 280
 +
| style="text-align: right;" |
 
|-
 
|-
| 2011-0
+
| 2012
| style="text-align:right;" | 3744.0
+
| [[C & T ENERGY OF EAST CANTON IN]]
|
+
| Brine
|
+
| style="text-align: right;" | 140
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 431.0
 
|
 
 
|-
 
|-
 +
| 2013
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| Brine
 +
| style="text-align: right;" | 140
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2012-0
+
| 2014
| style="text-align:right;" | 2634.0
+
| [[C & T ENERGY OF EAST CANTON IN]]
|
+
| Brine
|
+
| style="text-align: right;" | 70
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 405.0
 
|
 
 
|-
 
|-
 +
| 2015
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| Brine
 +
| style="text-align: right;" | 70
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2013-0
+
| 2016
| style="text-align:right;" | 2727.0
+
| [[C & T ENERGY OF EAST CANTON IN]]
|
+
| Brine
|
+
| style="text-align: right;" | 140
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 321.0
 
|
 
 
|-
 
|-
 +
| 2017
 +
| [[C & T ENERGY OF EAST CANTON IN]]
 +
| Brine
 +
| style="text-align: right;" | 70
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2014-0
+
| 2018
| style="text-align:right;" | 3703.0
+
| [[C & T ENERGY OF EAST CANTON IN]]
| style="text-align:right;" | 365.0
+
| Brine
|  
+
| style="text-align: right;" | 70
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 228.0
 
| style="text-align:right;" | 365.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Production Table - Brine Data
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
|publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date =  2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date = 2019-05-07
 +
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
| -1004492564
+
| 1004492564
 
| 2009-07-29
 
| 2009-07-29
|  
+
| Preliminary Restoration
 +
| No Violations
 
| The location is reclaimed, seeded, mulched, and has emerging vegetation. I did not pass the Preliminary Restoration at this time.
 
| The location is reclaimed, seeded, mulched, and has emerging vegetation. I did not pass the Preliminary Restoration at this time.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1138488034
 
| 1138488034
 
| 2009-04-23
 
| 2009-04-23
|  
+
| Preliminary Restoration
 +
| No Violations
 
| The drilling pits are open. The well has not been fraced. There has been no reclamation done to date. I called Greg New and he said that he is fracturing the well in the next couple of  weeks and will have the pits closed in May.
 
| The drilling pits are open. The well has not been fraced. There has been no reclamation done to date. I called Greg New and he said that he is fracturing the well in the next couple of  weeks and will have the pits closed in May.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1193115578
 
| 1193115578
 
| 2008-11-20
 
| 2008-11-20
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Located the access to the drilling location.
 
| Located the access to the drilling location.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1228769618
 
| 1228769618
 
| 2008-12-08
 
| 2008-12-08
|  
+
| Drill / Deepen /  Reopen
| Drilling at 3540', Dusting, pits and liners are intact. Picked up the 8-5/8'' dia cement job log.
+
| No Violations
|
+
| Drilling at 3540, Dusting, pits and liners are intact. Picked up the 8-5/8 dia cement job log.
|
 
|
 
|-
 
 
|-
 
|-
| -1415293191
+
| 1415293191
 
| 2008-12-04
 
| 2008-12-04
|  
+
| Drill / Deepen /  Reopen
| Drilling at 146'. Pits and liners are intact. While running conductor casing, the 11-3/4'' dia casing parted at the collar. 79' of casing was in the hole and dropped to 20' below ground level. The casing will be left in the hole and the surface hole will be drilled on mud.
+
| No Violations
|
+
| Drilling at 146. Pits and liners are intact. While running conductor casing, the 11-3/4 dia casing parted at the collar. 79 of casing was in the hole and dropped to 20 below ground level. The casing will be left in the hole and the surface hole will be drilled on mud.
|
 
|
 
|-
 
 
|-
 
|-
 
| 2024329873
 
| 2024329873
 
| 2010-04-20
 
| 2010-04-20
|  
+
| Preliminary Restoration
 +
| No Violations
 
| The well is in production and the reclamation is completed at the site. The Preliminary Restoration is PASSED.
 
| The well is in production and the reclamation is completed at the site. The Preliminary Restoration is PASSED.
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 03:50, 24 July 2019

Well Details

Well ID: 34-151-25657
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Washington Township
Operator Name: C & T ENERGY OF EAST CANTON IN
Well Pad ID:
Farm/Lease Name: CHAPMAN UNIT
License Status: Producing
License Date: 2009-09-10
Spud Date: 2008-12-03
Spud Drilling Contractor: ADVENT DRLG
Final Drill Date: 2008-12-09
Well Total Depth: 5510 ft
Configuration: Vertical
Latitude: 40.844542762
Longitude: -81.10868130

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-10-31 Proposed Formations:CLINTON, Issued Date:10/31/2008, Expired Date:10/31/2009 6:00:00 AM, Drilling unit acres:40.21, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-12-09
Completion Report Received 2009-05-22
Construction Permit Expires 2009-10-31
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-09-10 5327 5388 59

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 171000 Gal 100000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 C & T ENERGY OF EAST CANTON IN 5638 827 214
2010 C & T ENERGY OF EAST CANTON IN 6221 630 365
2011 C & T ENERGY OF EAST CANTON IN 3744 431 0
2012 C & T ENERGY OF EAST CANTON IN 2634 405 365
2013 C & T ENERGY OF EAST CANTON IN 2727 321 365
2014 C & T ENERGY OF EAST CANTON IN 3703 228 365
2015 C & T ENERGY OF EAST CANTON IN 3334 234 365
2016 C & T ENERGY OF EAST CANTON IN 5254 287 365
2017 C & T ENERGY OF EAST CANTON IN 4143 170 365
2018 C & T ENERGY OF EAST CANTON IN 4280 291 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 C & T ENERGY OF EAST CANTON IN Brine 770 214
2010 C & T ENERGY OF EAST CANTON IN Brine 350 365
2011 C & T ENERGY OF EAST CANTON IN Brine 280
2012 C & T ENERGY OF EAST CANTON IN Brine 140 365
2013 C & T ENERGY OF EAST CANTON IN Brine 140 365
2014 C & T ENERGY OF EAST CANTON IN Brine 70 365
2015 C & T ENERGY OF EAST CANTON IN Brine 70 365
2016 C & T ENERGY OF EAST CANTON IN Brine 140 365
2017 C & T ENERGY OF EAST CANTON IN Brine 70 365
2018 C & T ENERGY OF EAST CANTON IN Brine 70 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1004492564 2009-07-29 Preliminary Restoration No Violations The location is reclaimed, seeded, mulched, and has emerging vegetation. I did not pass the Preliminary Restoration at this time.
1138488034 2009-04-23 Preliminary Restoration No Violations The drilling pits are open. The well has not been fraced. There has been no reclamation done to date. I called Greg New and he said that he is fracturing the well in the next couple of weeks and will have the pits closed in May.
1193115578 2008-11-20 Drill / Deepen / Reopen No Violations Located the access to the drilling location.
1228769618 2008-12-08 Drill / Deepen / Reopen No Violations Drilling at 3540, Dusting, pits and liners are intact. Picked up the 8-5/8 dia cement job log.
1415293191 2008-12-04 Drill / Deepen / Reopen No Violations Drilling at 146. Pits and liners are intact. While running conductor casing, the 11-3/4 dia casing parted at the collar. 79 of casing was in the hole and dropped to 20 below ground level. The casing will be left in the hole and the surface hole will be drilled on mud.
2024329873 2010-04-20 Preliminary Restoration No Violations The well is in production and the reclamation is completed at the site. The Preliminary Restoration is PASSED.

For data sources see[9]

References