If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-153-23028 | | Well ID: 34-153-23028 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.342027969, -81.40217460 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: | + | | State: Ohio |
+ | |- | ||
+ | | County: [[Summit_County,_Ohio|Summit]] | ||
+ | |- | ||
+ | | Municipality: [[Twinsburg,_Ohio|Twinsburg]] | ||
|- | |- | ||
| Operator Name: [[SUMMIT PETROLEUM INC]] | | Operator Name: [[SUMMIT PETROLEUM INC]] | ||
Line 13: | Line 17: | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: VILLAGE OF REMINDERVILLE |
|- | |- | ||
− | | | + | | License Status: Producing |
|- | |- | ||
− | | | + | | License Date: 2008-05-23 |
|- | |- | ||
| Spud Date: 2008-01-17 | | Spud Date: 2008-01-17 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[POULSON DRILLING]] |
+ | |- | ||
+ | | Final Drill Date: 2008-01-21 | ||
+ | |- | ||
+ | | Well Total Depth: 3902 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Well Status: | + | | Latitude: 41.342027969 |
+ | |- | ||
+ | | Longitude: -81.40217460 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
|- | |- | ||
− | | | + | | APP |
+ | | 2007-11-26 | ||
+ | | Proposed Formations:CLINTON, Issued Date:11/26/2007, Expired Date:11/25/2008 6:00:00 AM, Drilling unit acres:35.8, Proposed Well Type:OG, Proposed Well Class:POOL | ||
|- | |- | ||
− | | | + | | APP |
+ | | 2008-01-02 | ||
+ | | Proposed Formations:CLINTON, Issued Date:1/2/2008, Expired Date:1/1/2009 6:00:00 AM, Drilling unit acres:35.8, Proposed Well Type:OG, Proposed Well Class:POOL | ||
+ | |- | ||
+ | | Reached Total Depth | ||
+ | | 2008-01-21 | ||
+ | | | ||
+ | |- | ||
+ | | Completion Report Received | ||
+ | | 2008-02-19 | ||
+ | | | ||
+ | |- | ||
+ | | Construction Permit Expires | ||
+ | | 2009-01-01 | ||
+ | | | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-02-15 | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
|- | |- | ||
− | | | + | | 2008-05-23 |
+ | | style="text-align: right;" | 3711 | ||
+ | | style="text-align: right;" | 3773 | ||
+ | | style="text-align: right;" | 20 | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Risk Based Data Management System - Perfs Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | == Stimulations Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Stimulation Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Fluid Volume |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Company |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Comments |
|- | |- | ||
− | |||
− | |||
− | |||
| | | | ||
+ | | H2O | ||
+ | | style="text-align: right;" | 15 | ||
+ | | style="text-align: right;" | 78500 Gal | ||
+ | | style="text-align: right;" | 40000 | ||
| | | | ||
− | |||
| | | | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblStimulation Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
|- | |- | ||
− | | | + | | 2008 |
− | | style="text-align:right;" | | + | | [[SUMMIT PETROLEUM INC]] |
− | | | + | | style="text-align: right;" | 10382 |
− | + | | style="text-align: right;" | 236 | |
− | | | + | | style="text-align: right;" | 306 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2009 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | style="text-align: right;" | 5401 | ||
+ | | style="text-align: right;" | 148 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | style="text-align:right;" | 2571 | + | | [[SUMMIT PETROLEUM INC]] |
− | | | + | | style="text-align: right;" | 2571 |
− | + | | style="text-align: right;" | 82 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2011 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | style="text-align: right;" | 3675 | ||
+ | | style="text-align: right;" | 129 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2012 |
− | | style="text-align:right;" | | + | | [[SUMMIT PETROLEUM INC]] |
− | | | + | | style="text-align: right;" | 2181 |
− | + | | style="text-align: right;" | 60 | |
− | | | + | | style="text-align: right;" | 366 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2013 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | style="text-align: right;" | 1804 | ||
+ | | style="text-align: right;" | 64 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2014 |
− | | style="text-align:right;" | | + | | [[SUMMIT PETROLEUM INC]] |
− | | | + | | style="text-align: right;" | 1699 |
− | + | | style="text-align: right;" | 59 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2015 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | style="text-align: right;" | 1374 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | style="text-align:right;" | | + | | [[SUMMIT PETROLEUM INC]] |
− | | | + | | style="text-align: right;" | 1095 |
− | + | | style="text-align: right;" | 69 | |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2017 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | style="text-align: right;" | 1022 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2018 |
− | | | + | | [[SUMMIT PETROLEUM INC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 810 |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | 365 | ||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Ohio Department of Natural Resources | + | | title = Risk Based Data Management System - Production Table - Oil and Gas Data |
− | | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == | + | <ref>{{cite web |
− | {| class="wikitable sortable" | + | | title = Combined Production - Oil and Gas Data |
− | !scope="col" | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | !scope="col" | | + | | date = 2019-05-07 |
− | !scope="col" | | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | !scope="col" | | + | | accessdate = 2019-05-21 }}</ref> |
− | + | == Waste Data == | |
− | + | {| class="wikitable sortable" | |
− | + | !scope="col" style="text-align: center"| Period | |
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2008 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 835 | ||
+ | | style="text-align: right;" | 306 | ||
+ | |- | ||
+ | | 2009 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 139 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 300 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 230 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 74 | ||
+ | | style="text-align: right;" | 366 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 138 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 142 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2015 |
− | | | + | | [[SUMMIT PETROLEUM INC]] |
− | | | + | | Brine |
− | | | + | | style="text-align: right;" | 83 |
− | | | + | | style="text-align: right;" | 365 |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 2016 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 61 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2017 |
− | | | + | | [[SUMMIT PETROLEUM INC]] |
− | | | + | | Brine |
− | | | + | | style="text-align: right;" | 0 |
− | | | + | | style="text-align: right;" | 365 |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 2018 | ||
+ | | [[SUMMIT PETROLEUM INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 74 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | |} |
− | | | + | For data sources see<ref>{{cite web |
− | | | + | | title = Risk Based Data Management System - Production Table - Brine Data |
− | | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | | + | | date = 2019-05-07 |
− | | | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | | + | | accessdate = 2019-05-21 }}</ref> |
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Inspection Date | ||
+ | !scope="col" style="text-align: center"| Inspection Type | ||
+ | !scope="col" style="text-align: center"| Inspection Result | ||
+ | !scope="col" style="text-align: center"| Inspection Comments | ||
|- | |- | ||
+ | | 0179890330 | ||
+ | | 2008-04-02 | ||
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | The well has been turned on. Additional work still needs to be completed for preliminary restoration approval. | ||
|- | |- | ||
− | | | + | | 0323314744 |
| 2008-01-04 | | 2008-01-04 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| The drilling location has been cleared and graded. A decision as to pit requirements will be made after the pits are dug. | | The drilling location has been cleared and graded. A decision as to pit requirements will be made after the pits are dug. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 0325807941 |
− | |||
| 2008-01-22 | | 2008-01-22 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| Poulson Drilling has moved off. The pits are fenced, lined and in good condition with sufficient freeboard to contain any precipitation. | | Poulson Drilling has moved off. The pits are fenced, lined and in good condition with sufficient freeboard to contain any precipitation. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 0415103270 |
| 2008-02-04 | | 2008-02-04 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| Recent heavy rains have washed the majority of the lime off of the nearby trees. Only the trees closest to the pits still have residual coverage. | | Recent heavy rains have washed the majority of the lime off of the nearby trees. Only the trees closest to the pits still have residual coverage. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 0729542406 |
| 2008-01-23 | | 2008-01-23 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| The surface hole annulus between the 8-5/8 surface casing and the ground has been topped of with 4 cubic yards of 9 sack grout. | | The surface hole annulus between the 8-5/8 surface casing and the ground has been topped of with 4 cubic yards of 9 sack grout. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 0829171259 |
− | |||
| 2008-03-14 | | 2008-03-14 | ||
− | | | + | | Production Wells |
+ | | No Violations | ||
| The well has been turned on before the fences were installed around the wellhead and the tank battery. I called Bill Kinney and told him to shut the well in immediately and to keep it shut in until the fences have been installed. | | The well has been turned on before the fences were installed around the wellhead and the tank battery. I called Bill Kinney and told him to shut the well in immediately and to keep it shut in until the fences have been installed. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 0928614344 |
| 2008-02-01 | | 2008-02-01 | ||
− | | | + | | Drill / Deepen / Reopen |
+ | | No Violations | ||
| On site to solidify pits with quick lime obtained from a plant in Huron Ohio. The material was very hot and easily became airborn during off loading and mixing. The material was blown into the shale pit only after the entire pit was covered with another pit liner. The lime was hot enough to melt portions of the cover liner. Plumes of steam and dust extented some 30 feet into the air while mixing the pit. The location is fairly remote and the only area affected by the plumes were nearby trees. This material is not suitable for use in developed areas unless an alternate method of applying and mixing is used. | | On site to solidify pits with quick lime obtained from a plant in Huron Ohio. The material was very hot and easily became airborn during off loading and mixing. The material was blown into the shale pit only after the entire pit was covered with another pit liner. The lime was hot enough to melt portions of the cover liner. Plumes of steam and dust extented some 30 feet into the air while mixing the pit. The location is fairly remote and the only area affected by the plumes were nearby trees. This material is not suitable for use in developed areas unless an alternate method of applying and mixing is used. | ||
− | | | + | |- |
− | | | + | | 1318802646 |
− | | | + | | 2008-09-30 |
+ | | Preliminary Restoration | ||
+ | | No Violations | ||
+ | | Preliminary restoration is approved. | ||
+ | |- | ||
+ | | 1928099990 | ||
+ | | 2008-02-13 | ||
+ | | Drill / Deepen / Reopen | ||
+ | | No Violations | ||
+ | | Moore Well Service rig is on site to correct a casing leak that has resulted in natural gas on the backside of the 4-1/2 casing. Summit has plumbed the 8-5/8 casing head to a frac tank in order to leave the valve open and prevent pressurization of the annulus. The company intends to run a Halliburton R-4 packer on tubing and to set the packer above the perforations in order to isolate the gas leak. The work is scheduled for 2/14. | ||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-153-23028 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.342027969,"lon":-81.4021746,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Twinsburg | |
Operator Name: SUMMIT PETROLEUM INC | |
Well Pad ID: | |
Farm/Lease Name: VILLAGE OF REMINDERVILLE | |
License Status: Producing | |
License Date: 2008-05-23 | |
Spud Date: 2008-01-17 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2008-01-21 | |
Well Total Depth: 3902 ft | |
Configuration: Vertical | |
Latitude: 41.342027969 | |
Longitude: -81.40217460 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-11-26 | Proposed Formations:CLINTON, Issued Date:11/26/2007, Expired Date:11/25/2008 6:00:00 AM, Drilling unit acres:35.8, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2008-01-02 | Proposed Formations:CLINTON, Issued Date:1/2/2008, Expired Date:1/1/2009 6:00:00 AM, Drilling unit acres:35.8, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-01-21 | |
Completion Report Received | 2008-02-19 | |
Construction Permit Expires | 2009-01-01 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-05-23 | 3711 | 3773 | 20 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 78500 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | SUMMIT PETROLEUM INC | 10382 | 236 | 306 |
2009 | SUMMIT PETROLEUM INC | 5401 | 148 | 365 |
2010 | SUMMIT PETROLEUM INC | 2571 | 82 | 365 |
2011 | SUMMIT PETROLEUM INC | 3675 | 129 | 365 |
2012 | SUMMIT PETROLEUM INC | 2181 | 60 | 366 |
2013 | SUMMIT PETROLEUM INC | 1804 | 64 | 365 |
2014 | SUMMIT PETROLEUM INC | 1699 | 59 | 365 |
2015 | SUMMIT PETROLEUM INC | 1374 | 0 | 365 |
2016 | SUMMIT PETROLEUM INC | 1095 | 69 | 365 |
2017 | SUMMIT PETROLEUM INC | 1022 | 0 | 365 |
2018 | SUMMIT PETROLEUM INC | 810 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | SUMMIT PETROLEUM INC | Brine | 835 | 306 |
2009 | SUMMIT PETROLEUM INC | Brine | 139 | 365 |
2010 | SUMMIT PETROLEUM INC | Brine | 300 | 365 |
2011 | SUMMIT PETROLEUM INC | Brine | 230 | 365 |
2012 | SUMMIT PETROLEUM INC | Brine | 74 | 366 |
2013 | SUMMIT PETROLEUM INC | Brine | 138 | 365 |
2014 | SUMMIT PETROLEUM INC | Brine | 142 | 365 |
2015 | SUMMIT PETROLEUM INC | Brine | 83 | 365 |
2016 | SUMMIT PETROLEUM INC | Brine | 61 | 365 |
2017 | SUMMIT PETROLEUM INC | Brine | 0 | 365 |
2018 | SUMMIT PETROLEUM INC | Brine | 74 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0179890330 | 2008-04-02 | Production Wells | No Violations | The well has been turned on. Additional work still needs to be completed for preliminary restoration approval. |
0323314744 | 2008-01-04 | Drill / Deepen / Reopen | No Violations | The drilling location has been cleared and graded. A decision as to pit requirements will be made after the pits are dug. |
0325807941 | 2008-01-22 | Drill / Deepen / Reopen | No Violations | Poulson Drilling has moved off. The pits are fenced, lined and in good condition with sufficient freeboard to contain any precipitation. |
0415103270 | 2008-02-04 | Drill / Deepen / Reopen | No Violations | Recent heavy rains have washed the majority of the lime off of the nearby trees. Only the trees closest to the pits still have residual coverage. |
0729542406 | 2008-01-23 | Drill / Deepen / Reopen | No Violations | The surface hole annulus between the 8-5/8 surface casing and the ground has been topped of with 4 cubic yards of 9 sack grout. |
0829171259 | 2008-03-14 | Production Wells | No Violations | The well has been turned on before the fences were installed around the wellhead and the tank battery. I called Bill Kinney and told him to shut the well in immediately and to keep it shut in until the fences have been installed. |
0928614344 | 2008-02-01 | Drill / Deepen / Reopen | No Violations | On site to solidify pits with quick lime obtained from a plant in Huron Ohio. The material was very hot and easily became airborn during off loading and mixing. The material was blown into the shale pit only after the entire pit was covered with another pit liner. The lime was hot enough to melt portions of the cover liner. Plumes of steam and dust extented some 30 feet into the air while mixing the pit. The location is fairly remote and the only area affected by the plumes were nearby trees. This material is not suitable for use in developed areas unless an alternate method of applying and mixing is used. |
1318802646 | 2008-09-30 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1928099990 | 2008-02-13 | Drill / Deepen / Reopen | No Violations | Moore Well Service rig is on site to correct a casing leak that has resulted in natural gas on the backside of the 4-1/2 casing. Summit has plumbed the 8-5/8 casing head to a frac tank in order to leave the valve open and prevent pressurization of the annulus. The company intends to run a Halliburton R-4 packer on tubing and to set the packer above the perforations in order to isolate the gas leak. The work is scheduled for 2/14. |
For data sources see[9]