X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23028"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-23028
 
| Well ID: 34-153-23028
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.34200528, -81.40241628 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.342027969, -81.40217460 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Summit County, Ohio|Summit]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Summit_County,_Ohio|Summit]]
 +
|-
 +
| Municipality: [[Twinsburg,_Ohio|Twinsburg]]
 
|-
 
|-
 
| Operator Name: [[SUMMIT PETROLEUM INC]]
 
| Operator Name: [[SUMMIT PETROLEUM INC]]
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: VILLAGE OF REMINDERVILLE
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2008-05-23
 
|-
 
|-
 
| Spud Date: 2008-01-17
 
| Spud Date: 2008-01-17
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[POULSON DRILLING]]
 +
|-
 +
| Final Drill Date: 2008-01-21
 +
|-
 +
| Well Total Depth: 3902 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 41.342027969
 +
|-
 +
| Longitude: -81.40217460
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
| Violations: 0
+
| APP
 +
| 2007-11-26
 +
| Proposed Formations:CLINTON, Issued Date:11/26/2007, Expired Date:11/25/2008 6:00:00 AM, Drilling unit acres:35.8, Proposed Well Type:OG, Proposed Well Class:POOL
 
|-
 
|-
| Latitude: 41.34200528
+
| APP
 +
| 2008-01-02
 +
| Proposed Formations:CLINTON, Issued Date:1/2/2008, Expired Date:1/1/2009 6:00:00 AM, Drilling unit acres:35.8, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Reached Total Depth
 +
| 2008-01-21
 +
 +
|-
 +
| Completion Report Received
 +
| 2008-02-19
 +
 +
|-
 +
| Construction Permit Expires
 +
| 2009-01-01
 +
 +
|-
 +
| Record Last Modified
 +
| 2017-02-15
 +
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Longitude: -81.40241628
+
| 2008-05-23
 +
| style="text-align: right;" | 3711
 +
| style="text-align: right;" | 3773
 +
| style="text-align: right;" | 20
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Stimulation Date
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Chemical Agent
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Fracking Fluid Volume
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
!scope="col" | OIL QUANTITY
+
!scope="col" style="text-align: center"| Fracking Company
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| 2008-0
 
| style="text-align:right;" | 10382.0
 
|
 
 
|  
 
|  
 +
| H2O
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 78500 Gal
 +
| style="text-align: right;" | 40000
 
|  
 
|  
| style="text-align:right;" | 236.0
 
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
| 2009-0
+
| 2008
| style="text-align:right;" | 5401.0
+
| [[SUMMIT PETROLEUM INC]]
|  
+
| style="text-align: right;" | 10382
|
+
| style="text-align: right;" | 236
|  
+
| style="text-align: right;" | 306
| style="text-align:right;" | 148.0
 
|
 
 
|-
 
|-
 +
| 2009
 +
| [[SUMMIT PETROLEUM INC]]
 +
| style="text-align: right;" | 5401
 +
| style="text-align: right;" | 148
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2010-0
+
| 2010
| style="text-align:right;" | 2571.0
+
| [[SUMMIT PETROLEUM INC]]
|  
+
| style="text-align: right;" | 2571
|
+
| style="text-align: right;" | 82
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 82.0
 
|
 
 
|-
 
|-
 +
| 2011
 +
| [[SUMMIT PETROLEUM INC]]
 +
| style="text-align: right;" | 3675
 +
| style="text-align: right;" | 129
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2011-0
+
| 2012
| style="text-align:right;" | 3675.0
+
| [[SUMMIT PETROLEUM INC]]
|  
+
| style="text-align: right;" | 2181
|
+
| style="text-align: right;" | 60
|  
+
| style="text-align: right;" | 366
| style="text-align:right;" | 129.0
 
|
 
 
|-
 
|-
 +
| 2013
 +
| [[SUMMIT PETROLEUM INC]]
 +
| style="text-align: right;" | 1804
 +
| style="text-align: right;" | 64
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2012-0
+
| 2014
| style="text-align:right;" | 2181.0
+
| [[SUMMIT PETROLEUM INC]]
|  
+
| style="text-align: right;" | 1699
|
+
| style="text-align: right;" | 59
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 60.0
 
|
 
 
|-
 
|-
 +
| 2015
 +
| [[SUMMIT PETROLEUM INC]]
 +
| style="text-align: right;" | 1374
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2013-0
+
| 2016
| style="text-align:right;" | 1804.0
+
| [[SUMMIT PETROLEUM INC]]
|  
+
| style="text-align: right;" | 1095
|
+
| style="text-align: right;" | 69
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 64.0
 
|
 
 
|-
 
|-
 +
| 2017
 +
| [[SUMMIT PETROLEUM INC]]
 +
| style="text-align: right;" | 1022
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2014-0
+
| 2018
| style="text-align:right;" | 1699.0
+
| [[SUMMIT PETROLEUM INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 810
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 59.0
 
| style="text-align:right;" | 365.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
|publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
| date =  2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
| accessdate = 2019-05-21 }}</ref>
== Inspection Data ==
+
<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title = Combined Production - Oil and Gas Data
!scope="col" | INSPECTION ID
+
|publisher = [[Ohio Department of Natural Resources]]
!scope="col" | DATE
+
  | date = 2019-05-07
!scope="col" | DESCRIPTION
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
!scope="col" | COMMENT
+
  | accessdate = 2019-05-21 }}</ref>
!scope="col" | VIOLATION ID
+
== Waste Data ==
!scope="col" | VIOLATION CODE
+
{| class="wikitable sortable"
!scope="col" | VIOLATION COMMENT
+
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2008
 +
| [[SUMMIT PETROLEUM INC]]
 +
| Brine
 +
| style="text-align: right;" | 835
 +
| style="text-align: right;" | 306
 +
|-
 +
| 2009
 +
| [[SUMMIT PETROLEUM INC]]
 +
| Brine
 +
| style="text-align: right;" | 139
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2010
 +
| [[SUMMIT PETROLEUM INC]]
 +
| Brine
 +
| style="text-align: right;" | 300
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2011
 +
| [[SUMMIT PETROLEUM INC]]
 +
| Brine
 +
| style="text-align: right;" | 230
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2012
 +
| [[SUMMIT PETROLEUM INC]]
 +
| Brine
 +
| style="text-align: right;" | 74
 +
| style="text-align: right;" | 366
 +
|-
 +
| 2013
 +
| [[SUMMIT PETROLEUM INC]]
 +
| Brine
 +
| style="text-align: right;" | 138
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[SUMMIT PETROLEUM INC]]
 +
| Brine
 +
| style="text-align: right;" | 142
 +
| style="text-align: right;" | 365
 
|-
 
|-
| -1318802646
+
| 2015
| 2008-09-30
+
| [[SUMMIT PETROLEUM INC]]
|  
+
| Brine
| Preliminary restoration is approved.
+
| style="text-align: right;" | 83
|  
+
| style="text-align: right;" | 365
|  
 
|  
 
 
|-
 
|-
 +
| 2016
 +
| [[SUMMIT PETROLEUM INC]]
 +
| Brine
 +
| style="text-align: right;" | 61
 +
| style="text-align: right;" | 365
 
|-
 
|-
| -179890330
+
| 2017
| 2008-04-02
+
| [[SUMMIT PETROLEUM INC]]
|  
+
| Brine
| The well has been turned on. Additional work still needs to be completed for preliminary restoration approval.
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
|  
 
|  
 
 
|-
 
|-
 +
| 2018
 +
| [[SUMMIT PETROLEUM INC]]
 +
| Brine
 +
| style="text-align: right;" | 74
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1928099990
+
|}
| 2008-02-13
+
For data sources see<ref>{{cite web
|  
+
| title = Risk Based Data Management System - Production Table - Brine Data
| Moore Well Service rig is on site to correct a casing leak that has resulted in natural gas on the backside of the 4-1/2 casing. Summit has plumbed the 8-5/8 casing head to a frac tank in order to leave the valve open and prevent pressurization of the annulus. The company intends to run a Halliburton R-4 packer on tubing and to set the packer above the perforations in order to isolate the gas leak. The work is scheduled for 2/14.
+
|publisher = [[Ohio Department of Natural Resources]]
|  
+
| date =  2019-05-07
|  
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
|  
+
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 
|-
 
|-
 +
| 0179890330
 +
| 2008-04-02
 +
| Production Wells
 +
| No Violations
 +
| The well has been turned on. Additional work still needs to be completed for preliminary restoration approval.
 
|-
 
|-
| -323314744
+
| 0323314744
 
| 2008-01-04
 
| 2008-01-04
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The drilling location has been cleared and graded. A decision as to pit requirements will be made after the pits are dug.
 
| The drilling location has been cleared and graded. A decision as to pit requirements will be made after the pits are dug.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 0325807941
| -325807941
 
 
| 2008-01-22
 
| 2008-01-22
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Poulson Drilling has moved off. The pits are fenced, lined and in good condition with sufficient freeboard to contain any precipitation.
 
| Poulson Drilling has moved off. The pits are fenced, lined and in good condition with sufficient freeboard to contain any precipitation.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| 415103270
+
| 0415103270
 
| 2008-02-04
 
| 2008-02-04
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Recent heavy rains have washed the majority of the lime off of the nearby trees. Only the trees closest to the pits still have residual coverage.
 
| Recent heavy rains have washed the majority of the lime off of the nearby trees. Only the trees closest to the pits still have residual coverage.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -729542406
+
| 0729542406
 
| 2008-01-23
 
| 2008-01-23
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The surface hole annulus between the 8-5/8 surface casing and the ground has been topped of with 4 cubic yards of 9 sack grout.
 
| The surface hole annulus between the 8-5/8 surface casing and the ground has been topped of with 4 cubic yards of 9 sack grout.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 0829171259
| -829171259
 
 
| 2008-03-14
 
| 2008-03-14
|  
+
| Production Wells
 +
| No Violations
 
| The well has been turned on before the fences were installed around the wellhead and the tank battery. I called Bill Kinney and told him to shut the well in immediately and to keep it shut in until the fences have been installed.
 
| The well has been turned on before the fences were installed around the wellhead and the tank battery. I called Bill Kinney and told him to shut the well in immediately and to keep it shut in until the fences have been installed.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -928614344
+
| 0928614344
 
| 2008-02-01
 
| 2008-02-01
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| On site to solidify pits with quick lime obtained from a plant in Huron Ohio. The material was very hot and easily became airborn during off loading and mixing. The material was blown into the shale pit only after the entire pit was covered with another pit liner. The lime was hot enough to melt portions of the cover liner. Plumes of steam and dust extented some 30 feet into the air while mixing the pit. The location is fairly remote and the only area affected by the plumes were nearby trees. This material is not suitable for use in developed areas unless an alternate method of applying and mixing is used.
 
| On site to solidify pits with quick lime obtained from a plant in Huron Ohio. The material was very hot and easily became airborn during off loading and mixing. The material was blown into the shale pit only after the entire pit was covered with another pit liner. The lime was hot enough to melt portions of the cover liner. Plumes of steam and dust extented some 30 feet into the air while mixing the pit. The location is fairly remote and the only area affected by the plumes were nearby trees. This material is not suitable for use in developed areas unless an alternate method of applying and mixing is used.
|  
+
|-
|  
+
| 1318802646
|  
+
| 2008-09-30
 +
| Preliminary Restoration
 +
| No Violations
 +
| Preliminary restoration is approved.
 +
|-
 +
| 1928099990
 +
| 2008-02-13
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Moore Well Service rig is on site to correct a casing leak that has resulted in natural gas on the backside of the 4-1/2 casing. Summit has plumbed the 8-5/8 casing head to a frac tank in order to leave the valve open and prevent pressurization of the annulus. The company intends to run a Halliburton R-4 packer on tubing and to set the packer above the perforations in order to isolate the gas leak. The work is scheduled for 2/14.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 10:48, 24 July 2019

Well Details

Well ID: 34-153-23028
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Twinsburg
Operator Name: SUMMIT PETROLEUM INC
Well Pad ID:
Farm/Lease Name: VILLAGE OF REMINDERVILLE
License Status: Producing
License Date: 2008-05-23
Spud Date: 2008-01-17
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2008-01-21
Well Total Depth: 3902 ft
Configuration: Vertical
Latitude: 41.342027969
Longitude: -81.40217460

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-11-26 Proposed Formations:CLINTON, Issued Date:11/26/2007, Expired Date:11/25/2008 6:00:00 AM, Drilling unit acres:35.8, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2008-01-02 Proposed Formations:CLINTON, Issued Date:1/2/2008, Expired Date:1/1/2009 6:00:00 AM, Drilling unit acres:35.8, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-01-21
Completion Report Received 2008-02-19
Construction Permit Expires 2009-01-01
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-05-23 3711 3773 20

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 78500 Gal 40000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 SUMMIT PETROLEUM INC 10382 236 306
2009 SUMMIT PETROLEUM INC 5401 148 365
2010 SUMMIT PETROLEUM INC 2571 82 365
2011 SUMMIT PETROLEUM INC 3675 129 365
2012 SUMMIT PETROLEUM INC 2181 60 366
2013 SUMMIT PETROLEUM INC 1804 64 365
2014 SUMMIT PETROLEUM INC 1699 59 365
2015 SUMMIT PETROLEUM INC 1374 0 365
2016 SUMMIT PETROLEUM INC 1095 69 365
2017 SUMMIT PETROLEUM INC 1022 0 365
2018 SUMMIT PETROLEUM INC 810 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 SUMMIT PETROLEUM INC Brine 835 306
2009 SUMMIT PETROLEUM INC Brine 139 365
2010 SUMMIT PETROLEUM INC Brine 300 365
2011 SUMMIT PETROLEUM INC Brine 230 365
2012 SUMMIT PETROLEUM INC Brine 74 366
2013 SUMMIT PETROLEUM INC Brine 138 365
2014 SUMMIT PETROLEUM INC Brine 142 365
2015 SUMMIT PETROLEUM INC Brine 83 365
2016 SUMMIT PETROLEUM INC Brine 61 365
2017 SUMMIT PETROLEUM INC Brine 0 365
2018 SUMMIT PETROLEUM INC Brine 74 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0179890330 2008-04-02 Production Wells No Violations The well has been turned on. Additional work still needs to be completed for preliminary restoration approval.
0323314744 2008-01-04 Drill / Deepen / Reopen No Violations The drilling location has been cleared and graded. A decision as to pit requirements will be made after the pits are dug.
0325807941 2008-01-22 Drill / Deepen / Reopen No Violations Poulson Drilling has moved off. The pits are fenced, lined and in good condition with sufficient freeboard to contain any precipitation.
0415103270 2008-02-04 Drill / Deepen / Reopen No Violations Recent heavy rains have washed the majority of the lime off of the nearby trees. Only the trees closest to the pits still have residual coverage.
0729542406 2008-01-23 Drill / Deepen / Reopen No Violations The surface hole annulus between the 8-5/8 surface casing and the ground has been topped of with 4 cubic yards of 9 sack grout.
0829171259 2008-03-14 Production Wells No Violations The well has been turned on before the fences were installed around the wellhead and the tank battery. I called Bill Kinney and told him to shut the well in immediately and to keep it shut in until the fences have been installed.
0928614344 2008-02-01 Drill / Deepen / Reopen No Violations On site to solidify pits with quick lime obtained from a plant in Huron Ohio. The material was very hot and easily became airborn during off loading and mixing. The material was blown into the shale pit only after the entire pit was covered with another pit liner. The lime was hot enough to melt portions of the cover liner. Plumes of steam and dust extented some 30 feet into the air while mixing the pit. The location is fairly remote and the only area affected by the plumes were nearby trees. This material is not suitable for use in developed areas unless an alternate method of applying and mixing is used.
1318802646 2008-09-30 Preliminary Restoration No Violations Preliminary restoration is approved.
1928099990 2008-02-13 Drill / Deepen / Reopen No Violations Moore Well Service rig is on site to correct a casing leak that has resulted in natural gas on the backside of the 4-1/2 casing. Summit has plumbed the 8-5/8 casing head to a frac tank in order to leave the valve open and prevent pressurization of the annulus. The company intends to run a Halliburton R-4 packer on tubing and to set the packer above the perforations in order to isolate the gas leak. The work is scheduled for 2/14.

For data sources see[9]

References