X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-20256"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-099-20256
 
| Well ID: 34-099-20256
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.01445159, -80.81690598 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.014310943, -80.81707078 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Mahoning County, Ohio|Mahoning]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Mahoning_County,_Ohio|Mahoning]]
 +
|-
 +
| Municipality: [[Ellsworth_Township,_Mahoning_County,_Ohio|Ellsworth Township]]
 
|-
 
|-
 
| Operator Name: [[BAIRD BROS SAWMILL INC]]
 
| Operator Name: [[BAIRD BROS SAWMILL INC]]
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: HOWARD
 
|-
 
|-
| First Permit Date:  
+
| License Status: Final Restoration
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2010-05-11
 
|-
 
|-
 
| Spud Date: 1971-02-14
 
| Spud Date: 1971-02-14
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor:  
 +
|-
 +
| Final Drill Date: 1971-05-15
 +
|-
 +
| Well Total Depth: 5364 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Final Restoration
+
| Latitude: 41.014310943
 +
|-
 +
| Longitude: -80.81707078
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
| Violations: 0
+
| Original Spud
 +
| 1971-02-14
 +
 
|-
 
|-
| Latitude: 41.01445159
+
| CO
 +
| 1971-02-16
 +
| 1396  BAIRD BROS SAWMILL INC  GeoDate  2/16/71
 
|-
 
|-
| Longitude: -80.81690598
+
| Completed
 +
| 1971-05-15
 +
 +
|-
 +
| Reached Total Depth
 +
| 1971-05-15
 +
 +
|-
 +
| APP
 +
| 2001-10-23
 +
| Proposed Formations:ORISKANY, Issued Date:10/23/2001, Expired Date:10/23/2002 6:00:00 AM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Plugged Back
 +
| 2001-11-26
 +
 +
|-
 +
| Plugged/Abandoned
 +
| 2010-04-21
 +
 +
|-
 +
| APP
 +
| 2010-04-29
 +
| Proposed Formations:MANITOULIN DOLOMITE, Issued Date:4/29/2010, Expired Date:4/29/2011 6:00:00 AM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:
 +
|-
 +
| Construction Permit Expires
 +
| 2011-04-29
 +
 +
|-
 +
| Record Last Modified
 +
| 2013-03-14
 +
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
| 2006-09-11
 +
| style="text-align: right;" | 5235
 +
| style="text-align: right;" | 5283
 +
| style="text-align: right;" | 18
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Stimulation Date
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Chemical Agent
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Fracking Fluid Volume
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
!scope="col" | OIL QUANTITY
+
!scope="col" style="text-align: center"| Fracking Company
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| 1984-0
 
| style="text-align:right;" | 20928.0
 
 
|  
 
|  
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 4000 Bbl
 +
| style="text-align: right;" | 50000
 
|  
 
|  
 
|  
 
|  
| style="text-align:right;" | 53.0
 
|
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 1984
 +
| [[GM/DELPHI PACKARD ELEC.]]
 +
| style="text-align: right;" | 20928
 +
| style="text-align: right;" | 53
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985
 +
| [[GM/DELPHI PACKARD ELEC.]]
 +
| style="text-align: right;" | 18769
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1986
 +
| [[GM/DELPHI PACKARD ELEC.]]
 +
| style="text-align: right;" | 17306
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1988
 +
| [[GM/DELPHI PACKARD ELEC.]]
 +
| style="text-align: right;" | 16960
 +
| style="text-align: right;" | 61
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1985-0
+
| 1989
| style="text-align:right;" | 18769.0
+
| [[GM/DELPHI PACKARD ELEC.]]
|  
+
| style="text-align: right;" | 15888
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1990
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| style="text-align: right;" | 5381
 +
| style="text-align: right;" | 68
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1986-0
+
| 1992
| style="text-align:right;" | 17306.0
+
| [[GM/DELPHI PACKARD ELEC.]]
|  
+
| style="text-align: right;" | 14128
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1993
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| style="text-align: right;" | 5593
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 330
 
|-
 
|-
| 1988-0
+
| 1994
| style="text-align:right;" | 16960.0
+
| [[GM/DELPHI PACKARD ELEC.]]
|  
+
| style="text-align: right;" | 13598
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 61.0
 
|
 
 
|-
 
|-
 +
| 1995
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| style="text-align: right;" | 2609
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 120
 
|-
 
|-
| 1989-0
+
| 1996
| style="text-align:right;" | 15888.0
+
| [[BAIRD BROS SAWMILL INC]]
|  
+
| style="text-align: right;" | 770
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 65
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1997
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| style="text-align: right;" | 3087
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1990-0
+
| 1998
| style="text-align:right;" | 5381.0
+
| [[BAIRD BROS SAWMILL INC]]
|  
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 68.0
 
|
 
 
|-
 
|-
 +
| 1999
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 1992-0
+
| 2000
| style="text-align:right;" | 14128.0
+
| [[BAIRD BROS SAWMILL INC]]
|  
+
| style="text-align: right;" | 3017
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 180
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2001
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 1993-0
+
| 2002
| style="text-align:right;" | 5593.0
+
| [[BAIRD BROS SAWMILL INC]]
|  
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
| 1994-0
+
| 1984
| style="text-align:right;" | 13598.0
+
| [[GM/DELPHI PACKARD ELEC.]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1985
 +
| [[GM/DELPHI PACKARD ELEC.]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1995-0
+
| 1986
| style="text-align:right;" | 2609.0
+
| [[GM/DELPHI PACKARD ELEC.]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1988
 +
| [[GM/DELPHI PACKARD ELEC.]]
 +
| Brine
 +
| style="text-align: right;" | 14
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1996-0
+
| 1989
| style="text-align:right;" | 770.0
+
| [[GM/DELPHI PACKARD ELEC.]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1990
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| Brine
 +
| style="text-align: right;" | 1128
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1997-0
+
| 1992
| style="text-align:right;" | 3087.0
+
| [[GM/DELPHI PACKARD ELEC.]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1993
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| Brine
 +
| style="text-align: right;" | 118
 +
| style="text-align: right;" | 330
 
|-
 
|-
| 1998-0
+
| 1994
| style="text-align:right;" | 0.0
+
| [[GM/DELPHI PACKARD ELEC.]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1995
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| Brine
 +
| style="text-align: right;" | 120
 +
| style="text-align: right;" | 120
 
|-
 
|-
| 1999-0
+
| 1996
| style="text-align:right;" | 0.0
+
| [[BAIRD BROS SAWMILL INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 220
|
+
| style="text-align: right;" | 65
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1997
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2000-0
+
| 1998
| style="text-align:right;" | 3017.0
+
| [[BAIRD BROS SAWMILL INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 50
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1999
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2001-0
+
| 2000
| style="text-align:right;" | 0.0
+
| [[BAIRD BROS SAWMILL INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 210
|
+
| style="text-align: right;" | 180
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2001
 +
| [[BAIRD BROS SAWMILL INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2002-0
+
| 2002
| style="text-align:right;" | 0.0
+
| [[BAIRD BROS SAWMILL INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Production Table - Brine Data
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
|publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date =  2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date = 2019-05-07
 +
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
| -1021960481
+
| 1021960481
 
| 2010-05-11
 
| 2010-05-11
|  
+
| Final Restoration
 +
| No Violations
 
| I performed a final restoration.  The lease road has been reclaimed.  The well site is now part of the corn field.  This well PASSES FINAL RESTORATION.
 
| I performed a final restoration.  The lease road has been reclaimed.  The well site is now part of the corn field.  This well PASSES FINAL RESTORATION.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1096603685
| -1096603685
 
 
| 2010-04-13
 
| 2010-04-13
|  
+
| Final Restoration
 +
| No Violations
 
| I talked to Paul Baird about the status on getting the rest of this well plugged.  He is going to get a rig to plug the well in 2 to 3 weeks.  I asked about a plugging permit.  He had not filed yet. But he will.  See the past history of this well for more details.  This final restoration continues.
 
| I talked to Paul Baird about the status on getting the rest of this well plugged.  He is going to get a rig to plug the well in 2 to 3 weeks.  I asked about a plugging permit.  He had not filed yet. But he will.  See the past history of this well for more details.  This final restoration continues.
|
 
|
 
|
 
|-
 
|-
 
| 1263388074
 
| 2010-01-12
 
|
 
| This well is a followup on a final restoration for the Clinton well and to produce from the Oriskany.  I drove to the Baird Sawmill to talk to Mr. Paul Baird about the status of this well.  On 11/26/01 this well was plugged in the Clinton.  The casing was ripped and pulled out of the hole.  The 4 1/2 was run back into the hole. The well was to be completed in the Oriskany.  Problems arose and the casing was left in the hole at 2200'.  The cost to get the casing down to the Ariskany(3507') so far was approximately $40,000.00.  Mr. Baird stated that he would try and find all the paper work on this well and call me.  I stated again that this well needs to be produced or plugged.  He understands.  This Final Restoration continues.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1263388074
 
| 1263388074
 
| 2010-01-12
 
| 2010-01-12
|  
+
| Final Restoration
| This well is a followup on a final restoration for the Clinton well and to produce from the Ariskany.  I drove to the Baird Sawmill to talk to Mr. Paul Baird about the status of this well.  On 11/26/01 this well was plugged in the Clinton.  The casing was ripped and pulled out of the hole.  The 4 1/2 was run back into the hole. The well was to be completed in the Oriskany.  Problems arose and the casing was left in the hole at 2200'.  The cost to get the casing down to the Ariskany(3507') so far was approximately $40,000.00.  Mr. Baird stated that he would try and find all the paper work on this well and call me.  I stated again that this well needs to be produced or plugged.  He understands.  This Final Restoration continues.
+
| No Violations
|
+
| This well is a followup on a final restoration for the Clinton well and to produce from the Oriskany.  I drove to the Baird Sawmill to talk to Mr. Paul Baird about the status of this well.  On 11/26/01 this well was plugged in the Clinton.  The casing was ripped and pulled out of the hole.  The 4 1/2 was run back into the hole. The well was to be completed in the Oriskany.  Problems arose and the casing was left in the hole at 2200.  The cost to get the casing down to the Ariskany(3507) so far was approximately $40,000.00.  Mr. Baird stated that he would try and find all the paper work on this well and call me.  I stated again that this well needs to be produced or plugged.  He understands.  This Final Restoration continues.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1264449362
 
| 1264449362
 
| 2010-01-25
 
| 2010-01-25
|  
+
| Final Restoration
 +
| No Violations
 
| I picked up from Mr. Paul Baird all the reports that were done on this well back in November of 2001.  The plugging permit will follow and Mr. Baird will plug this well this summer.  This final restoration continues.
 
| I picked up from Mr. Paul Baird all the reports that were done on this well back in November of 2001.  The plugging permit will follow and Mr. Baird will plug this well this summer.  This final restoration continues.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1271790772
 
| 1271790772
 
| 2010-04-20
 
| 2010-04-20
|  
+
| Plug / Plug Back
| I witnessed the releasing of the wellhead and pulling out of the hole with one joint of 4 1/2 casing.  The workover rig is Phils Well Service.  The rig ran into the well with 2 3/8 tubing to 2590'.  There were no violations at this time.
+
| No Violations
|
+
| I witnessed the releasing of the wellhead and pulling out of the hole with one joint of 4 1/2 casing.  The workover rig is Phils Well Service.  The rig ran into the well with 2 3/8 tubing to 2590.  There were no violations at this time.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1271875127
 
| 1271875127
 
| 2010-04-21
 
| 2010-04-21
|  
+
| Plug / Plug Back
| I witnessed the plugging of this well.  The existing tank battery will not be taken out.  There were two wells that go into this one tank battery.  It has a 100 barrel stock tank.  The stock tank is also used for well #2560.  I witnessed the vaccuming out of the fluid in the pits. The workover rig  was Phil's Well Service. There were no violations at this time.
+
| No Violations
|
+
| I witnessed the plugging of this well.  The existing tank battery will not be taken out.  There were two wells that go into this one tank battery.  It has a 100 barrel stock tank.  The stock tank is also used for well #2560.  I witnessed the vaccuming out of the fluid in the pits. The workover rig  was Phils Well Service. There were no violations at this time.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1272210601
 
| 1272210601
 
| 2010-04-23
 
| 2010-04-23
|  
+
| Final Restoration
 +
| No Violations
 
| The casing was cut off and the ID sign, well name welded on the top.  Dirt was spread over the top.  The rock for the lease road was hauled off.  This does not pass final restoration.
 
| The casing was cut off and the ID sign, well name welded on the top.  Dirt was spread over the top.  The rock for the lease road was hauled off.  This does not pass final restoration.
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 19:30, 24 July 2019

Well Details

Well ID: 34-099-20256
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Ellsworth Township
Operator Name: BAIRD BROS SAWMILL INC
Well Pad ID:
Farm/Lease Name: HOWARD
License Status: Final Restoration
License Date: 2010-05-11
Spud Date: 1971-02-14
Spud Drilling Contractor:
Final Drill Date: 1971-05-15
Well Total Depth: 5364 ft
Configuration: Vertical
Latitude: 41.014310943
Longitude: -80.81707078

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1971-02-14
CO 1971-02-16 1396 BAIRD BROS SAWMILL INC GeoDate 2/16/71
Completed 1971-05-15
Reached Total Depth 1971-05-15
APP 2001-10-23 Proposed Formations:ORISKANY, Issued Date:10/23/2001, Expired Date:10/23/2002 6:00:00 AM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:POOL
Plugged Back 2001-11-26
Plugged/Abandoned 2010-04-21
APP 2010-04-29 Proposed Formations:MANITOULIN DOLOMITE, Issued Date:4/29/2010, Expired Date:4/29/2011 6:00:00 AM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 2011-04-29
Record Last Modified 2013-03-14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5235 5283 18

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 4000 Bbl 50000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 GM/DELPHI PACKARD ELEC. 20928 53 0
1985 GM/DELPHI PACKARD ELEC. 18769 0 365
1986 GM/DELPHI PACKARD ELEC. 17306 0 365
1988 GM/DELPHI PACKARD ELEC. 16960 61 365
1989 GM/DELPHI PACKARD ELEC. 15888 0 365
1990 BAIRD BROS SAWMILL INC 5381 68 365
1992 GM/DELPHI PACKARD ELEC. 14128 0 365
1993 BAIRD BROS SAWMILL INC 5593 0 330
1994 GM/DELPHI PACKARD ELEC. 13598 0 365
1995 BAIRD BROS SAWMILL INC 2609 0 120
1996 BAIRD BROS SAWMILL INC 770 0 65
1997 BAIRD BROS SAWMILL INC 3087 0 365
1998 BAIRD BROS SAWMILL INC 0 0 365
1999 BAIRD BROS SAWMILL INC 0 0 0
2000 BAIRD BROS SAWMILL INC 3017 0 180
2001 BAIRD BROS SAWMILL INC 0 0 0
2002 BAIRD BROS SAWMILL INC 0 0 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 GM/DELPHI PACKARD ELEC. Brine 0 0
1985 GM/DELPHI PACKARD ELEC. Brine 0 365
1986 GM/DELPHI PACKARD ELEC. Brine 0 365
1988 GM/DELPHI PACKARD ELEC. Brine 14 365
1989 GM/DELPHI PACKARD ELEC. Brine 0 365
1990 BAIRD BROS SAWMILL INC Brine 1128 365
1992 GM/DELPHI PACKARD ELEC. Brine 0 365
1993 BAIRD BROS SAWMILL INC Brine 118 330
1994 GM/DELPHI PACKARD ELEC. Brine 0 365
1995 BAIRD BROS SAWMILL INC Brine 120 120
1996 BAIRD BROS SAWMILL INC Brine 220 65
1997 BAIRD BROS SAWMILL INC Brine 0 365
1998 BAIRD BROS SAWMILL INC Brine 50 365
1999 BAIRD BROS SAWMILL INC Brine 0 0
2000 BAIRD BROS SAWMILL INC Brine 210 180
2001 BAIRD BROS SAWMILL INC Brine 0 0
2002 BAIRD BROS SAWMILL INC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1021960481 2010-05-11 Final Restoration No Violations I performed a final restoration. The lease road has been reclaimed. The well site is now part of the corn field. This well PASSES FINAL RESTORATION.
1096603685 2010-04-13 Final Restoration No Violations I talked to Paul Baird about the status on getting the rest of this well plugged. He is going to get a rig to plug the well in 2 to 3 weeks. I asked about a plugging permit. He had not filed yet. But he will. See the past history of this well for more details. This final restoration continues.
1263388074 2010-01-12 Final Restoration No Violations This well is a followup on a final restoration for the Clinton well and to produce from the Oriskany. I drove to the Baird Sawmill to talk to Mr. Paul Baird about the status of this well. On 11/26/01 this well was plugged in the Clinton. The casing was ripped and pulled out of the hole. The 4 1/2 was run back into the hole. The well was to be completed in the Oriskany. Problems arose and the casing was left in the hole at 2200. The cost to get the casing down to the Ariskany(3507) so far was approximately $40,000.00. Mr. Baird stated that he would try and find all the paper work on this well and call me. I stated again that this well needs to be produced or plugged. He understands. This Final Restoration continues.
1264449362 2010-01-25 Final Restoration No Violations I picked up from Mr. Paul Baird all the reports that were done on this well back in November of 2001. The plugging permit will follow and Mr. Baird will plug this well this summer. This final restoration continues.
1271790772 2010-04-20 Plug / Plug Back No Violations I witnessed the releasing of the wellhead and pulling out of the hole with one joint of 4 1/2 casing. The workover rig is Phils Well Service. The rig ran into the well with 2 3/8 tubing to 2590. There were no violations at this time.
1271875127 2010-04-21 Plug / Plug Back No Violations I witnessed the plugging of this well. The existing tank battery will not be taken out. There were two wells that go into this one tank battery. It has a 100 barrel stock tank. The stock tank is also used for well #2560. I witnessed the vaccuming out of the fluid in the pits. The workover rig was Phils Well Service. There were no violations at this time.
1272210601 2010-04-23 Final Restoration No Violations The casing was cut off and the ID sign, well name welded on the top. Dirt was spread over the top. The rock for the lease road was hauled off. This does not pass final restoration.

For data sources see[9]

References