X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-21812"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-153-21812
 
| Well ID: 34-153-21812
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.14980086, -81.56209177 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.149745313, -81.56225091 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Summit County, Ohio|Summit]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Summit_County,_Ohio|Summit]]
 +
|-
 +
| Municipality: Northampton Township
 
|-
 
|-
 
| Operator Name: [[PINE TOP INC]]
 
| Operator Name: [[PINE TOP INC]]
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: BAIL
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 1984-05-01
 
|-
 
|-
 
| Spud Date: 1984-05-03
 
| Spud Date: 1984-05-03
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[SHERMAN DRLG]]
 +
|-
 +
| Final Drill Date: 1984-05-07
 +
|-
 +
| Well Total Depth: 3672 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 41.149745313
 +
|-
 +
| Longitude: -81.56225091
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 
|-
 
|-
| Violations: 0
+
| CO
 +
| 1984-05-01
 +
| 570  PINE TOP INC  GeoDate  5/1/84
 +
|-
 +
| Oil and Gas
 +
| 1984-05-01
 +
| Issued Date 5/1/84 Expired Date 10/28/84 Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 03672 Proposed Drill Depth 03672
 +
|-
 +
| Original Spud
 +
| 1984-05-03
 +
 +
|-
 +
| Completed
 +
| 1984-05-07
 +
 +
|-
 +
| Reached Total Depth
 +
| 1984-05-07
 +
 +
|-
 +
| Completion Report Received
 +
| 1984-09-04
 +
 +
|-
 +
| Construction Permit Expires
 +
| 1984-10-28
 +
 +
|-
 +
| Record Last Modified
 +
| 2017-02-15
 +
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 
|-
 
|-
| Latitude: 41.14980086
+
| 1997-06-29
 +
| style="text-align: right;" | 3456
 +
| style="text-align: right;" | 3566
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -81.56209177
+
| 2006-09-11
 +
| style="text-align: right;" | 3488
 +
| style="text-align: right;" | 3560
 +
| style="text-align: right;" | 29
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Stimulation Date
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Chemical Agent
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Fracking Fluid Volume
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
!scope="col" | OIL QUANTITY
+
!scope="col" style="text-align: center"| Fracking Company
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| 1984-0
 
| style="text-align:right;" | 5934.0
 
 
|  
 
|  
 +
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 69500 Gal
 +
| style="text-align: right;" | 50000
 
|  
 
|  
|  
+
| FRAC: H2O,SAND
| style="text-align:right;" | 250.0
+
|-
|  
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 1984
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 5934
 +
| style="text-align: right;" | 250
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1985
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 32421
 +
| style="text-align: right;" | 618
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1988
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 7555
 +
| style="text-align: right;" | 98
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1989
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 5581
 +
| style="text-align: right;" | 98
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1990
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 3104
 +
| style="text-align: right;" | 94
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1991
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 4488
 +
| style="text-align: right;" | 91
 +
| style="text-align: right;" | 365
 +
|-
 +
| 1992
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 4263
 +
| style="text-align: right;" | 122
 +
| style="text-align: right;" | 365
 
|-
 
|-
 +
| 1993
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 4764
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1985-0
+
| 1994
| style="text-align:right;" | 32421.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 4132
|
+
| style="text-align: right;" | 122
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 618.0
 
|
 
 
|-
 
|-
 +
| 1995
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 3097
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1988-0
+
| 1996
| style="text-align:right;" | 7555.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 2507
|
+
| style="text-align: right;" | 120
|  
+
| style="text-align: right;" | 357
| style="text-align:right;" | 98.0
 
|
 
 
|-
 
|-
 +
| 1997
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 2562
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1989-0
+
| 1998
| style="text-align:right;" | 5581.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 2638
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 98.0
 
|
 
 
|-
 
|-
 +
| 1999
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 2764
 +
| style="text-align: right;" | 111
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1990-0
+
| 2000
| style="text-align:right;" | 3104.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 2348
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 94.0
 
|
 
 
|-
 
|-
 +
| 2001
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 608
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1991-0
+
| 2002
| style="text-align:right;" | 4488.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 91.0
 
|
 
 
|-
 
|-
 +
| 2003
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 33
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1992-0
+
| 2004
| style="text-align:right;" | 4263.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 1610
|
+
| style="text-align: right;" | 87
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 122.0
 
|
 
 
|-
 
|-
 +
| 2005
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 1295
 +
| style="text-align: right;" | 66
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1993-0
+
| 2006
| style="text-align:right;" | 4764.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 1301
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2007
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 931
 +
| style="text-align: right;" | 92
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1994-0
+
| 2009
| style="text-align:right;" | 4132.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 1470
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 122.0
 
|
 
 
|-
 
|-
 +
| 2010
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 879
 +
| style="text-align: right;" | 81
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1995-0
+
| 2011
| style="text-align:right;" | 3097.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 962
|
+
| style="text-align: right;" | 82
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2012
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 2107
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 366
 
|-
 
|-
| 1996-0
+
| 2013
| style="text-align:right;" | 2507.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 1335
|
+
| style="text-align: right;" | 68
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 120.0
 
|
 
 
|-
 
|-
 +
| 2014
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 467
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1997-0
+
| 2015
| style="text-align:right;" | 2562.0
+
| [[PINE TOP INC]]
|  
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2016
 +
| [[PINE TOP INC]]
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 1998-0
+
|}
| style="text-align:right;" | 2638.0
+
For data sources see<ref>{{cite web
|  
+
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
|  
+
|publisher = [[Ohio Department of Natural Resources]]
|  
+
| date =  2019-05-07
| style="text-align:right;" | 0.0
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
|
+
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
 +
| 1984
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 1999-0
+
| 1985
| style="text-align:right;" | 2764.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 207
|
+
| style="text-align: right;" | 0
| style="text-align:right;" | 111.0
 
|
 
 
|-
 
|-
 +
| 1988
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 50
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2000-0
+
| 1989
| style="text-align:right;" | 2348.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1990
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 78
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2001-0
+
| 1991
| style="text-align:right;" | 608.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 30
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1992
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 50
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2002-0
+
| 1993
| style="text-align:right;" | 0.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1994
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 45
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2003-0
+
| 1995
| style="text-align:right;" | 33.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 1996
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 50
 +
| style="text-align: right;" | 357
 
|-
 
|-
| 2004-0
+
| 1997
| style="text-align:right;" | 1610.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 40
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 87.0
 
|
 
 
|-
 
|-
 +
| 1998
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2005-0
+
| 1999
| style="text-align:right;" | 1295.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 100
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 66.0
 
|
 
 
|-
 
|-
 +
| 2000
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2006-0
+
| 2001
| style="text-align:right;" | 1301.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2002
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2007-0
+
| 2003
| style="text-align:right;" | 931.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 92.0
 
|
 
 
|-
 
|-
 +
| 2004
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 80
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2009-0
+
| 2005
| style="text-align:right;" | 1470.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 80
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2006
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2010-0
+
| 2007
| style="text-align:right;" | 879.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 20
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 81.0
 
|
 
 
|-
 
|-
 +
| 2009
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 35
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2011-0
+
| 2010
| style="text-align:right;" | 962.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 35
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 82.0
 
|
 
 
|-
 
|-
 +
| 2011
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 35
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2012-0
+
| 2012
| style="text-align:right;" | 2107.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 35
|
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
 
|
 
 
|-
 
|-
 +
| 2013
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 35
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2013-0
+
| 2014
| style="text-align:right;" | 1335.0
+
| [[PINE TOP INC]]
|
+
| Brine
|
+
| style="text-align: right;" | 80
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 68.0
 
|
 
 
|-
 
|-
 +
| 2015
 +
| [[PINE TOP INC]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2014-0
+
| 2016
| style="text-align:right;" | 467.0
+
| [[PINE TOP INC]]
| style="text-align:right;" | 365.0
+
| Brine
|  
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 365.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Production Table - Brine Data
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
|publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date =  2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date = 2019-05-07
 +
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
| PL4473
+
| 0000PL4473
|
 
 
|  
 
|  
 +
| Preliminary Restoration
 +
| No Violations
 
| Preliminary Restoration  done information from Data Point
 
| Preliminary Restoration  done information from Data Point
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 19:42, 24 July 2019

Well Details

Well ID: 34-153-21812
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Northampton Township
Operator Name: PINE TOP INC
Well Pad ID:
Farm/Lease Name: BAIL
License Status: Producing
License Date: 1984-05-01
Spud Date: 1984-05-03
Spud Drilling Contractor: SHERMAN DRLG
Final Drill Date: 1984-05-07
Well Total Depth: 3672 ft
Configuration: Vertical
Latitude: 41.149745313
Longitude: -81.56225091

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1984-05-01 570 PINE TOP INC GeoDate 5/1/84
Oil and Gas 1984-05-01 Issued Date 5/1/84 Expired Date 10/28/84 Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 03672 Proposed Drill Depth 03672
Original Spud 1984-05-03
Completed 1984-05-07
Reached Total Depth 1984-05-07
Completion Report Received 1984-09-04
Construction Permit Expires 1984-10-28
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3456 3566 0
2006-09-11 3488 3560 29

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 69500 Gal 50000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 PINE TOP INC 5934 250 0
1985 PINE TOP INC 32421 618 0
1988 PINE TOP INC 7555 98 365
1989 PINE TOP INC 5581 98 365
1990 PINE TOP INC 3104 94 365
1991 PINE TOP INC 4488 91 365
1992 PINE TOP INC 4263 122 365
1993 PINE TOP INC 4764 0 365
1994 PINE TOP INC 4132 122 365
1995 PINE TOP INC 3097 0 365
1996 PINE TOP INC 2507 120 357
1997 PINE TOP INC 2562 0 365
1998 PINE TOP INC 2638 0 365
1999 PINE TOP INC 2764 111 365
2000 PINE TOP INC 2348 0 365
2001 PINE TOP INC 608 0 365
2002 PINE TOP INC 0 0 365
2003 PINE TOP INC 33 0 365
2004 PINE TOP INC 1610 87 365
2005 PINE TOP INC 1295 66 365
2006 PINE TOP INC 1301 0 365
2007 PINE TOP INC 931 92 365
2009 PINE TOP INC 1470 0 365
2010 PINE TOP INC 879 81 365
2011 PINE TOP INC 962 82 365
2012 PINE TOP INC 2107 0 366
2013 PINE TOP INC 1335 68 365
2014 PINE TOP INC 467 0 365
2015 PINE TOP INC 0 0 365
2016 PINE TOP INC 0 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 PINE TOP INC Brine 0 0
1985 PINE TOP INC Brine 207 0
1988 PINE TOP INC Brine 50 365
1989 PINE TOP INC Brine 0 365
1990 PINE TOP INC Brine 78 365
1991 PINE TOP INC Brine 30 365
1992 PINE TOP INC Brine 50 365
1993 PINE TOP INC Brine 0 365
1994 PINE TOP INC Brine 45 365
1995 PINE TOP INC Brine 0 365
1996 PINE TOP INC Brine 50 357
1997 PINE TOP INC Brine 40 365
1998 PINE TOP INC Brine 0 365
1999 PINE TOP INC Brine 100 365
2000 PINE TOP INC Brine 0 365
2001 PINE TOP INC Brine 0 365
2002 PINE TOP INC Brine 0 365
2003 PINE TOP INC Brine 0 365
2004 PINE TOP INC Brine 80 365
2005 PINE TOP INC Brine 80 365
2006 PINE TOP INC Brine 0 365
2007 PINE TOP INC Brine 20 365
2009 PINE TOP INC Brine 35 365
2010 PINE TOP INC Brine 35 365
2011 PINE TOP INC Brine 35 365
2012 PINE TOP INC Brine 35 366
2013 PINE TOP INC Brine 35 365
2014 PINE TOP INC Brine 80 365
2015 PINE TOP INC Brine 0 365
2016 PINE TOP INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL4473 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point

For data sources see[9]

References