If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-055-21931 | | Well ID: 34-055-21931 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.424342676, -81.05545775 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | Operator Name: [[ | + | | County: [[Geauga_County,_Ohio|Geauga]] |
+ | |- | ||
+ | | Municipality: [[Parkman_Township,_Geauga_County,_Ohio|Parkman Township]] | ||
+ | |- | ||
+ | | Operator Name: [[DAVID R HILL INC]] | ||
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: MILLER A & S UNIT |
|- | |- | ||
− | | | + | | License Status: Producing |
|- | |- | ||
− | | | + | | License Date: 2007-10-25 |
|- | |- | ||
| Spud Date: 2007-04-05 | | Spud Date: 2007-04-05 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[KILBARGER DRLG]] |
+ | |- | ||
+ | | Final Drill Date: 2007-04-14 | ||
+ | |- | ||
+ | | Well Total Depth: 4352 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Well Status: | + | | Latitude: 41.424342676 |
+ | |- | ||
+ | | Longitude: -81.05545775 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | APP | ||
+ | | 2007-04-04 | ||
+ | | Proposed Formations:CLINTON, Issued Date:4/4/2007, Expired Date:4/3/2008 6:00:00 AM, Drilling unit acres:102.56, Proposed Well Type:OG, Proposed Well Class:POOL | ||
+ | |- | ||
+ | | Completed | ||
+ | | 2007-04-14 | ||
+ | | | ||
|- | |- | ||
− | | | + | | Reached Total Depth |
+ | | 2007-04-14 | ||
+ | | | ||
|- | |- | ||
− | | | + | | Completion Report Received |
+ | | 2007-07-05 | ||
+ | | | ||
|- | |- | ||
− | | | + | | Construction Permit Expires |
+ | | 2008-04-03 | ||
+ | | | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-02-15 | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
+ | |- | ||
+ | | 2007-10-25 | ||
+ | | style="text-align: right;" | 4073 | ||
+ | | style="text-align: right;" | 4164 | ||
+ | | style="text-align: right;" | 70 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Perfs Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | == Stimulations Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Stimulation Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Fluid Volume |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Company |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Comments |
|- | |- | ||
− | |||
− | |||
| | | | ||
+ | | H2O | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 77000 Gal | ||
+ | | style="text-align: right;" | 40000 | ||
| | | | ||
| | | | ||
− | |||
− | |||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblStimulation Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | | 2007 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 452 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 92 | ||
+ | |- | ||
+ | | 2008 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 13963 | ||
+ | | style="text-align: right;" | 152 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2009 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 17986 | ||
+ | | style="text-align: right;" | 137 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2010 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 15733 | ||
+ | | style="text-align: right;" | 110 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 13945 | ||
+ | | style="text-align: right;" | 99 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2012 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 9981 | ||
+ | | style="text-align: right;" | 98 | ||
+ | | style="text-align: right;" | 366 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 5793 | ||
+ | | style="text-align: right;" | 58 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 4354 | ||
+ | | style="text-align: right;" | 51 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 3103 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2016 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 5156 | ||
+ | | style="text-align: right;" | 100 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2017 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 3002 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
+ | |- | ||
+ | | 2018 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | style="text-align: right;" | 2555 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | |} |
− | | style="text-align: | + | For data sources see<ref>{{cite web |
− | | | + | | title = Risk Based Data Management System - Production Table - Oil and Gas Data |
− | | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | | + | | date = 2019-05-07 |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | |
− | + | | accessdate = 2019-05-21 }}</ref> | |
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Oil and Gas Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
|- | |- | ||
+ | | 2007 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 92 | ||
|- | |- | ||
− | | | + | | 2008 |
− | | style="text-align:right;" | | + | | [[DAVID R HILL INC]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 595 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2009 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 570 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
− | | style="text-align:right;" | | + | | [[DAVID R HILL INC]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 479 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2011 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 388 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2012 |
− | | style="text-align:right;" | | + | | [[DAVID R HILL INC]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 263 | |
− | + | | style="text-align: right;" | 366 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2013 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 232 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2014 |
− | | style="text-align:right;" | | + | | [[DAVID R HILL INC]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2015 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 90 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | style="text-align:right;" | | + | | [[DAVID R HILL INC]] |
− | + | | Brine | |
− | + | | style="text-align: right;" | 182 | |
− | + | | style="text-align: right;" | 365 | |
− | | style="text-align:right;" | | ||
− | |||
|- | |- | ||
+ | | 2017 | ||
+ | | [[DAVID R HILL INC]] | ||
+ | | Brine | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2018 |
− | + | | [[DAVID R HILL INC]] | |
− | + | | Brine | |
− | | | + | | style="text-align: right;" | 0 |
− | | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | ||
− | | style="text-align:right;" | 365 | ||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Ohio Department of Natural Resources | + | | title = Risk Based Data Management System - Production Table - Brine Data |
− | | | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
+ | <ref>{{cite web | ||
+ | | title = Combined Production - Brine Data | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection ID |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Inspection Type |
− | !scope="col" | + | !scope="col" style="text-align: center"| Inspection Result |
− | + | !scope="col" style="text-align: center"| Inspection Comments | |
− | !scope="col" | ||
− | |||
|- | |- | ||
− | | | + | | 0021036840 |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| 2007-09-04 | | 2007-09-04 | ||
− | | | + | | Preliminary Restoration |
+ | | No Violations | ||
| Site has been seeded and graded. Site is stable. Lease road has been restored. Meet with Mr. Miller on site he is happy with the work that has been completed. Tank battery has two 210 BBl tanks and a mechanical separator. Well is a pump jack well. Tank battery needs signed. Well is not in production at this time. | | Site has been seeded and graded. Site is stable. Lease road has been restored. Meet with Mr. Miller on site he is happy with the work that has been completed. Tank battery has two 210 BBl tanks and a mechanical separator. Well is a pump jack well. Tank battery needs signed. Well is not in production at this time. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 0023275089 |
| 2007-06-07 | | 2007-06-07 | ||
− | | | + | | Preliminary Restoration |
+ | | No Violations | ||
| On site per the company, they received complaints form Shelly Company, who is paving ST RT 528. Shelly Company is up set about the mud on the road. There was 3 miles of mud on the road. Operator had scrapped off mud, but they was a layer of mud on the new pavement. I suggested to Ted from TK gas to either wash the roads down or get the broom out and start cleaning the road. He stated he would do both. Per Ted, the ODOT supervisor was not happy about the mud on the road. It was suggested that trucks should be pressure washed or some method used to remove the mud from their tires before they go on the road. | | On site per the company, they received complaints form Shelly Company, who is paving ST RT 528. Shelly Company is up set about the mud on the road. There was 3 miles of mud on the road. Operator had scrapped off mud, but they was a layer of mud on the new pavement. I suggested to Ted from TK gas to either wash the roads down or get the broom out and start cleaning the road. He stated he would do both. Per Ted, the ODOT supervisor was not happy about the mud on the road. It was suggested that trucks should be pressure washed or some method used to remove the mud from their tires before they go on the road. | ||
− | | | + | |- |
− | | | + | | 1779808795 |
− | | | + | | 2013-04-02 |
+ | | Production Wells | ||
+ | | No Violations | ||
+ | | My inspection found the well to be equipped with a pump jack. The well and tank battery are in good repair. The tank battery consists of two 100 BBL production tanks and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. | ||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Violation ID | ||
+ | !scope="col" style="text-align: center"| Violation Date | ||
+ | !scope="col" style="text-align: center"| Violation Code | ||
+ | !scope="col" style="text-align: center"| Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-055-21931 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.424342676,"lon":-81.05545775,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Parkman Township | |
Operator Name: DAVID R HILL INC | |
Well Pad ID: | |
Farm/Lease Name: MILLER A & S UNIT | |
License Status: Producing | |
License Date: 2007-10-25 | |
Spud Date: 2007-04-05 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2007-04-14 | |
Well Total Depth: 4352 ft | |
Configuration: Vertical | |
Latitude: 41.424342676 | |
Longitude: -81.05545775 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-04-04 | Proposed Formations:CLINTON, Issued Date:4/4/2007, Expired Date:4/3/2008 6:00:00 AM, Drilling unit acres:102.56, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-04-14 | |
Reached Total Depth | 2007-04-14 | |
Completion Report Received | 2007-07-05 | |
Construction Permit Expires | 2008-04-03 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-10-25 | 4073 | 4164 | 70 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 77000 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | DAVID R HILL INC | 452 | 0 | 92 |
2008 | DAVID R HILL INC | 13963 | 152 | 365 |
2009 | DAVID R HILL INC | 17986 | 137 | 365 |
2010 | DAVID R HILL INC | 15733 | 110 | 365 |
2011 | DAVID R HILL INC | 13945 | 99 | 365 |
2012 | DAVID R HILL INC | 9981 | 98 | 366 |
2013 | DAVID R HILL INC | 5793 | 58 | 365 |
2014 | DAVID R HILL INC | 4354 | 51 | 365 |
2015 | DAVID R HILL INC | 3103 | 0 | 365 |
2016 | DAVID R HILL INC | 5156 | 100 | 365 |
2017 | DAVID R HILL INC | 3002 | 0 | 365 |
2018 | DAVID R HILL INC | 2555 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | DAVID R HILL INC | Brine | 0 | 92 |
2008 | DAVID R HILL INC | Brine | 595 | 365 |
2009 | DAVID R HILL INC | Brine | 570 | 365 |
2010 | DAVID R HILL INC | Brine | 479 | 365 |
2011 | DAVID R HILL INC | Brine | 388 | 365 |
2012 | DAVID R HILL INC | Brine | 263 | 366 |
2013 | DAVID R HILL INC | Brine | 232 | 365 |
2014 | DAVID R HILL INC | Brine | 0 | 365 |
2015 | DAVID R HILL INC | Brine | 90 | 365 |
2016 | DAVID R HILL INC | Brine | 182 | 365 |
2017 | DAVID R HILL INC | Brine | 0 | 365 |
2018 | DAVID R HILL INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0021036840 | 2007-09-04 | Preliminary Restoration | No Violations | Site has been seeded and graded. Site is stable. Lease road has been restored. Meet with Mr. Miller on site he is happy with the work that has been completed. Tank battery has two 210 BBl tanks and a mechanical separator. Well is a pump jack well. Tank battery needs signed. Well is not in production at this time. |
0023275089 | 2007-06-07 | Preliminary Restoration | No Violations | On site per the company, they received complaints form Shelly Company, who is paving ST RT 528. Shelly Company is up set about the mud on the road. There was 3 miles of mud on the road. Operator had scrapped off mud, but they was a layer of mud on the new pavement. I suggested to Ted from TK gas to either wash the roads down or get the broom out and start cleaning the road. He stated he would do both. Per Ted, the ODOT supervisor was not happy about the mud on the road. It was suggested that trucks should be pressure washed or some method used to remove the mud from their tires before they go on the road. |
1779808795 | 2013-04-02 | Production Wells | No Violations | My inspection found the well to be equipped with a pump jack. The well and tank battery are in good repair. The tank battery consists of two 100 BBL production tanks and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
For data sources see[9]