If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
− | __TOC__ | + | __TOC__ |
== Well Details == | == Well Details == | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-163-20757 | | Well ID: 34-163-20757 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.215580665, -82.28011694 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | | + | | State: Ohio |
|- | |- | ||
− | | Operator Name: [[BANCEQUITY PETROLEUM | + | | County: [[Vinton_County,_Ohio|Vinton]] |
+ | |- | ||
+ | | Municipality: [[Knox_Township,_Vinton_County,_Ohio|Knox Township]] | ||
+ | |- | ||
+ | | Operator Name: [[BANCEQUITY PETROLEUM CORPORATI]] | ||
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: SABO |
|- | |- | ||
− | | | + | | License Status: Active Injection |
|- | |- | ||
− | | | + | | License Date: 1997-12-18 |
|- | |- | ||
| Spud Date: 1982-09-13 | | Spud Date: 1982-09-13 | ||
|- | |- | ||
− | | | + | | Spud Drilling Contractor: [[PLATEAU DRLG]] |
+ | |- | ||
+ | | Final Drill Date: 1982-09-14 | ||
+ | |- | ||
+ | | Well Total Depth: 1155 ft | ||
|- | |- | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Well Status: | + | | Latitude: 39.215580665 |
+ | |- | ||
+ | | Longitude: -82.28011694 | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Well Status | ||
+ | !scope="col" style="width: 15%;text-align: center"| Well Status Date | ||
+ | !scope="col" style="text-align: center"| Comment | ||
+ | |- | ||
+ | | Oil and Gas | ||
+ | | 1982-06-08 | ||
+ | | Issued Date 6/8/82 Expired Date 12/1/82 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 01155 Proposed Drill Depth 01155 | ||
+ | |- | ||
+ | | Original Spud | ||
+ | | 1982-09-13 | ||
+ | | CONVERT 10-19-85 | ||
+ | |- | ||
+ | | Completed | ||
+ | | 1982-09-14 | ||
+ | | CONVERT 10-19-85 | ||
+ | |- | ||
+ | | Reached Total Depth | ||
+ | | 1982-09-14 | ||
+ | | CONVERT 10-19-85 | ||
+ | |- | ||
+ | | CO | ||
+ | | 1983-07-13 | ||
+ | | 2282 EQUITY CONVERSION CORP GeoDate 6/8/82 | ||
+ | |- | ||
+ | | First Injection | ||
+ | | 1983-07-13 | ||
+ | | CONVERT 10-19-85 | ||
+ | |- | ||
+ | | Completion Report Received | ||
+ | | 1983-07-25 | ||
+ | | CONVERT 10-19-85 | ||
+ | |- | ||
+ | | CO | ||
+ | | 1985-10-16 | ||
+ | | 631 BT ENERGY CORP GeoDate 10/16/85 | ||
|- | |- | ||
− | | | + | | Enhanced Recovery |
+ | | 1985-10-16 | ||
+ | | Issued Date 10/16/85 Expired Date 10/16/86 Acres 0010000 Tool Type NT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 | ||
|- | |- | ||
− | | | + | | Construction Permit Expires |
+ | | 1986-10-16 | ||
+ | | CONVERT 10-19-85 | ||
|- | |- | ||
− | | | + | | Annulus Pressure Monitoring Approved |
+ | | 1991-07-01 | ||
+ | | CONVERT 10-19-85 | ||
+ | |- | ||
+ | | CO | ||
+ | | 1996-04-09 | ||
+ | | 4801 BANCEQUITY PETROLEUM CORP GeoDate 10/16/85 | ||
+ | |- | ||
+ | | Last Compliance Report | ||
+ | | 2000-04-25 | ||
+ | | CONVERT 10-19-85 | ||
+ | |- | ||
+ | | Record Last Modified | ||
+ | | 2017-02-15 | ||
+ | | CONVERT 10-19-85 | ||
|- | |- | ||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Perforation Treatments == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Perforation Date | ||
+ | !scope="col" style="text-align: center"| Interval Top (ft) | ||
+ | !scope="col" style="text-align: center"| Interval Base (ft) | ||
+ | !scope="col" style="text-align: center"| Number of Shots | ||
+ | |- | ||
+ | | 2000-04-25 | ||
+ | | style="text-align: right;" | 1112 | ||
+ | | style="text-align: right;" | 1137 | ||
+ | | style="text-align: right;" | 1 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - Perfs Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Job Start Date | ||
+ | !scope="col" style="text-align: center"| Job End Date | ||
+ | !scope="col" style="text-align: center"| True Vertical Depth (ft) | ||
+ | !scope="col" style="text-align: center"| Total Water Volume (gal) | ||
+ | !scope="col" style="text-align: center"| Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" style="width: 100%" | ||
+ | !scope="col" style="text-align: center"| Job Number | ||
+ | !scope="col" style="text-align: center"| Trade Name | ||
+ | !scope="col" style="text-align: center"| Supplier | ||
+ | !scope="col" style="text-align: center"| Purpose | ||
+ | !scope="col" style="text-align: center"| Ingredient Name | ||
+ | !scope="col" style="white-space: nowrap;text-align: center"| CAS Number | ||
+ | !scope="col" style="text-align: center"| Additive Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Job Percentage by Mass | ||
+ | !scope="col" style="text-align: center"| Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | == Stimulations Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" style="text-align: center"| Stimulation Date |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Chemical Agent Concentration (%) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Fluid Volume |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Mass of Proppant Used (lb) |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Fracking Company |
− | !scope="col" | | + | !scope="col" style="text-align: center"| Comments |
|- | |- | ||
− | |||
− | |||
| | | | ||
− | | | + | | H2O |
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 400 Bbl | ||
+ | | style="text-align: right;" | 20000 | ||
| | | | ||
− | | | + | | FRAC: 400 BBL H2O, 20M SAND |
− | | | + | |- |
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Risk Based Data Management System - tblStimulation Table | ||
+ | |publisher = [[Ohio Department of Natural Resources]] | ||
+ | | date = 2019-05-07 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Gas Quantity (mcf) | ||
+ | !scope="col" style="text-align: center"| Oil Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--== Waste Data == | ||
+ | {| class="wikitable sortable" | ||
+ | !scope="col" style="text-align: center"| Period | ||
+ | !scope="col" style="text-align: center"| Operator Name | ||
+ | !scope="col" style="text-align: center"| Waste Type | ||
+ | !scope="col" style="text-align: center"| Quantity (bbl) | ||
+ | !scope="col" style="text-align: center"| Production Days | ||
+ | |- | ||
+ | |}--> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" style="text-align: center"| Inspection ID | ||
+ | !scope="col" style="text-align: center"| Inspection Date | ||
+ | !scope="col" style="text-align: center"| Inspection Type | ||
+ | !scope="col" style="text-align: center"| Inspection Result | ||
+ | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | 0000001546 | ||
+ | | 2002-11-21 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | No violations at this time, lease rd will need graded and water breaks in spring. | ||
+ | |- | ||
+ | | 000UIC1608 | ||
+ | | 1995-10-18 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | 1501: 9-3-08 TEMPORARY STORAGE | ||
+ | |- | ||
+ | | 000UIC1634 | ||
+ | | 1996-06-04 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | 1501: 9-9-05 (A)(9) FLUID IN DIKE | ||
+ | |- | ||
+ | | 000UIC1792 | ||
+ | | 1999-06-16 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | 1501: 9-01-07 PREVENT CONTAMINATE | ||
+ | |- | ||
+ | | 001269i406 | ||
+ | | 2001-10-02 | ||
+ | | Enhanced Recovery Project | ||
+ | | Violations Noted | ||
+ | | An inspection revealed lease rd. needs graded and bare areas seeded and mulched. Bare areas on well site also need seed and mulched. | ||
+ | |- | ||
+ | | 0016517193 | ||
+ | | 2012-08-31 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | No violations were noted at the time of inspection. Mr. Mike McPeak was notified of the low annulus pressure. | ||
+ | |- | ||
+ | | 005609i201 | ||
+ | | 2001-05-31 | ||
+ | | Enhanced Recovery Project | ||
+ | | Violations Noted | ||
+ | | An inspection of the well revealed that a 2 valve and nipple is leaking brine and needs repaired or replaced. | ||
+ | |- | ||
+ | | 005609i240 | ||
+ | | 2001-07-12 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Follow - up on NOV , In - Compliance | ||
+ | |- | ||
+ | | 0064201202 | ||
+ | | 2007-08-10 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | A follow-up inspection revealed that the well is in-compliance. | ||
+ | |- | ||
+ | | 0082148349 | ||
+ | | 2013-08-12 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Unloading pad is constructed. The pad has a curb around the perimeter and is sloped to a sump pit. The sump pit is plumbed directly to the 210 barrel tank. A submersible pump is in the sump pit. Containment dike is free of water. | ||
+ | |- | ||
+ | | 01269i1231 | ||
+ | | 2002-07-23 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Pressures on well meet requirements at this time, no violations. | ||
+ | |- | ||
+ | | 0226247185 | ||
+ | | 2006-09-25 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | A follow-up inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 9/25/2006. During the inspection, it was noted that the liner had been repaired however, the dike still needs to be pumped. | ||
+ | |- | ||
+ | | 0269269556 | ||
+ | | 2015-03-18 | ||
+ | | Enhanced Recovery Project | ||
+ | | Violations Noted | ||
+ | | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. The injection pressure was 360 psi on the state issued gauge. The maximum injection pressure is 325 psi. Reduce the injection pressure. | ||
|- | |- | ||
+ | | 0295121720 | ||
+ | | 2011-03-29 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | FOLLOW UP TO NOV # 1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl. | ||
|- | |- | ||
− | | | + | | 0319899034 |
− | | | + | | 2017-07-14 |
− | | | + | | Salt Water Injection Well |
− | | | + | | No Violations |
− | + | | Quarterly UIC inspection. The annulus pressure was 70 PSI, the injection tubing was 7 PSI. Legible identification was posted. No violations noted. | |
− | |||
− | |||
|- | |- | ||
+ | | 0373932678 | ||
+ | | 2010-09-23 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | An inspection revealed no violations. Note: The gauge utilized for this inspection will require calibration. | ||
|- | |- | ||
− | | | + | | 0380400885 |
− | | | + | | 2005-01-26 |
− | + | | Enhanced Recovery Project | |
− | + | | No Violations | |
− | | | + | | No violations. |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 0408293390 | ||
+ | | 2013-07-17 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Meet with Mike McPeak at the tank battery and review the unloading pad plan and measure the containment dike. | ||
|- | |- | ||
− | | | + | | 0430306180 |
− | | | + | | 2016-03-09 |
− | | | + | | Enhanced Recovery Project |
− | | Inspected containment dike, tanks | + | | No Violations |
− | + | | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Witnessed a Bancequity truck unloading on the pad. The truck pumped water out of the containment dike and into the tank. Identification posted at the well and facility. | |
− | |||
− | |||
|- | |- | ||
+ | | 0454829053 | ||
+ | | 2014-06-27 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Inspected the unloading pad, containment dike, tanks, injection pump, annulus pressure, injection pressure, and witnessed Bancequity brine truck unloading on the pad. Walked the injection line from the containment dike to the well. | ||
|- | |- | ||
− | | | + | | 0461446507 |
− | | | + | | 2011-08-22 |
− | + | | Enhanced Recovery Project | |
− | + | | No Violations | |
− | | | + | | No violations observed during inspection. |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 0461536130 | ||
+ | | 2015-03-18 | ||
+ | | Administrative Inspection | ||
+ | | No Violations | ||
+ | | Received a call from Mike McPeak that they have ordered a murphy switch for the injection pump. It is scheduled to be installed on 3-19-15. The injection pump has been shut off. | ||
|- | |- | ||
− | | | + | | 0471716922 |
− | | | + | | 2008-02-11 |
− | + | | Enhanced Recovery Project | |
− | + | | No Violations | |
− | | | + | | No violations were noted. |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 0571363893 | ||
+ | | 2008-09-16 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | No violations were noted. | ||
|- | |- | ||
− | | | + | | 0626007645 |
− | | | + | | 2011-01-04 |
− | | | + | | Enhanced Recovery Project |
− | | | + | | No Violations |
− | + | | An inspection revealed housekeeping needed at storage tank location. Oil stained ground, due to overflow from 5 gallon containment drum for pump. | |
− | |||
− | |||
|- | |- | ||
+ | | 0630290178 | ||
+ | | 2019-02-28 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike and tanks show signs of the tank overflowing. The oil has been cleaned up inside the dike. The brine is being removed now. The oil and brine was contained with in the dike. Mike McPeak was on site and told me that a float switch froze and allowed the tanks to overflow into the containment dike. | ||
|- | |- | ||
− | | | + | | 0684008598 |
− | | | + | | 2013-02-12 |
− | | | + | | Enhanced Recovery Project |
− | | | + | | No Violations |
− | + | | Upon arrival at this well I noticed that the 2 in ball valve on the annulus was halfway open. When I went to make sure that the 1/4 in needle valve on the annulus was shut, I noticed that it was also halfway open. 0 psi pressure with no vacuum was observed on the annulus. The injection side had a strong vacuum. I notified Mr. Mike McPeak about this and he stated that he would pressure the annulus up next week. | |
− | |||
− | |||
|- | |- | ||
+ | | 0695388181 | ||
+ | | 2007-06-26 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | A follow-up inspection revealed non-compliance. | ||
|- | |- | ||
− | | | + | | 0704494675 |
− | | | + | | 2008-05-28 |
− | + | | Enhanced Recovery Project | |
− | + | | No Violations | |
− | | | + | | No violations were noted. |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 0755675473 | ||
+ | | 2016-11-03 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | I received a request from UIC inspector Jon Scott to witness a mechanical integrity. A new tension packer was installed. The test was held at 394 PSI for 15 minutes with no loss in pressure. | ||
|- | |- | ||
− | | | + | | 0766440008 |
− | | | + | | 2007-04-19 |
− | | | + | | Enhanced Recovery Project |
− | | | + | | Violations Noted |
− | + | | An inspection revealed no pressure on the annulus side of the well. Also noted was that the dike will need to be pumped. An oil sheen was observed inside the dike. The fluid must be removed from the lease. Additionally, the siphoning of this fluid must be discontinued. During the inspection, it was noted that Bancequity was siphoning fluid from the dike into a trench. | |
− | |||
− | |||
|- | |- | ||
+ | | 0801776351 | ||
+ | | 2009-09-01 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | An inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor. No violations were noted. | ||
|- | |- | ||
− | | | + | | 0823465623 |
− | | | + | | 2016-10-28 |
− | | | + | | Enhanced Recovery Project |
− | | Inspected containment dike, tanks | + | | No Violations |
− | + | | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. | |
− | |||
− | |||
|- | |- | ||
+ | | 0824384990 | ||
+ | | 2007-01-11 | ||
+ | | Enhanced Recovery Project | ||
+ | | Violations Noted | ||
+ | | An inspection conducted on 1/11/2007 revealed that the dike needs pumped and C&P removed from inside the dike. | ||
|- | |- | ||
− | | | + | | 0847333857 |
− | | | + | | 2009-03-02 |
− | | | + | | Enhanced Recovery Project |
− | | | + | | No Violations |
− | + | | An inspection revealed no violations at this time. | |
− | |||
− | |||
|- | |- | ||
+ | | 0867666645 | ||
+ | | 2011-12-13 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Accompanied Jon Scott on UIC inspection. | ||
|- | |- | ||
− | | | + | | 0871616312 |
− | | | + | | 2009-06-15 |
− | | | + | | Enhanced Recovery Project |
− | | | + | | No Violations |
− | + | | An inspection revealed no violations at this time. New identification displayed at the well. | |
− | |||
− | |||
|- | |- | ||
+ | | 0873343481 | ||
+ | | 2014-04-01 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Inspected the containment dike, tanks, injection pump, unloading pad, injection pressure, and annulus pressure. Identification posted at the tank containment dike and wellhead. | ||
|- | |- | ||
− | | | + | | 0889902860 |
− | | | + | | 2009-12-09 |
− | + | | Enhanced Recovery Project | |
− | + | | No Violations | |
− | | | + | | An inspection revealed no violations. |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 0902527974 | ||
+ | | 2006-06-22 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | There were no violations at the time of inspection. | ||
|- | |- | ||
− | | | + | | 0938708836 |
− | | | + | | 2011-03-29 |
− | | | + | | Enhanced Recovery Project |
− | | | + | | No Violations |
− | + | | FOLLOW UP TO NOV # 295121720 FOLLOW UP TO NOV # 1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl. | |
− | |||
− | |||
|- | |- | ||
+ | | 0970762188 | ||
+ | | 2013-11-19 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | Salt water injection well inspection. The well has a new unloading pad. Rain water was present in the dike. A pump was running to pump out the water. | ||
|- | |- | ||
− | | | + | | 0972298010 |
− | | | + | | 2016-06-09 |
− | | | + | | Enhanced Recovery Project |
− | | Inspected containment dike, tanks | + | | No Violations |
− | + | | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. One 3/4 hole in the liner was marked with orange tape. Mike McPeak was notified of the location of the hole in the liner. | |
− | |||
− | |||
|- | |- | ||
+ | | 0976196024 | ||
+ | | 2018-09-11 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. Bancequity brine truck pumping out the containment pit during inspection. | ||
|- | |- | ||
− | | | + | | 1012998891 |
| 2014-09-16 | | 2014-09-16 | ||
− | | | + | | Enhanced Recovery Project |
+ | | Violations Noted | ||
| Inspected containment dike, tanks, unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well. The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure. | | Inspected containment dike, tanks, unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well. The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1078824094 | | 1078824094 | ||
| 2003-10-30 | | 2003-10-30 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| No violations. | | No violations. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1092036246 | | 1092036246 | ||
| 2015-03-19 | | 2015-03-19 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| Company has installed a Murphy pressure cut off switch on the injection line. The cut off is set for 300 psi. | | Company has installed a Murphy pressure cut off switch on the injection line. The cut off is set for 300 psi. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1104136859 |
− | |||
| 2004-03-10 | | 2004-03-10 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| No violations at this time | | No violations at this time | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1145582263 |
− | |||
| 2007-11-05 | | 2007-11-05 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| No violations were noted. | | No violations were noted. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1147952308 | ||
+ | | 2018-10-29 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dike has 4 inches of fluid in the low portion of the containment dike. | ||
|- | |- | ||
− | | | + | | 1179644370 |
| 2013-11-19 | | 2013-11-19 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| Inspected unloading pad, containment dike, tanks, Injection pump, Injection pressure, and annulus pressure. Good identification at the well. Accompanied by Inspector Kip Thompson. | | Inspected unloading pad, containment dike, tanks, Injection pump, Injection pressure, and annulus pressure. Good identification at the well. Accompanied by Inspector Kip Thompson. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1189481189 |
− | |||
| 2013-08-26 | | 2013-08-26 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water. | | Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1208746443 | ||
+ | | 2016-09-01 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Inspected the containment dike, tanks, unloading pad, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. | ||
|- | |- | ||
− | | | + | | 1269i95057 |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| 2001-01-17 | | 2001-01-17 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| An inspection revealed that the well head is under water and unable to test the annulus of the well , and a 1 valve on the well which is leaking and needs replaced. Will want to witness the next M I T test on this well , preformed by the company. | | An inspection revealed that the well head is under water and unable to test the annulus of the well , and a 1 valve on the well which is leaking and needs replaced. Will want to witness the next M I T test on this well , preformed by the company. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1288556873 |
− | |||
| 2006-07-26 | | 2006-07-26 | ||
− | | | + | | Enhanced Recovery Project |
+ | | Violations Noted | ||
| An inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 7/26/2006. During the inspection, it was noted that the dike needs to be pumped, oily material removed and the liner repaired. | | An inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 7/26/2006. During the inspection, it was noted that the dike needs to be pumped, oily material removed and the liner repaired. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1294083649 | | 1294083649 | ||
| 2008-06-30 | | 2008-06-30 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| No violations were noted. | | No violations were noted. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1327928049 |
| 2005-07-05 | | 2005-07-05 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| Company has set 2- 210bbl tanks on liner. | | Company has set 2- 210bbl tanks on liner. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1372430772 | | 1372430772 | ||
| 2008-12-22 | | 2008-12-22 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| An inspection revealed no violations. Note: Winter conditions at time of the inspection. | | An inspection revealed no violations. Note: Winter conditions at time of the inspection. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1393429029 |
− | |||
| 2006-11-03 | | 2006-11-03 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| A follow-up inspection conducted on 11/3/2006 revealed that the previously noted violation has not been resolved. The company was contacted by telephone on 11/3/2006 and informed to resolve this violation within a week. | | A follow-up inspection conducted on 11/3/2006 revealed that the previously noted violation has not been resolved. The company was contacted by telephone on 11/3/2006 and informed to resolve this violation within a week. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1414751626 | | 1414751626 | ||
| 2004-01-15 | | 2004-01-15 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| No violations. | | No violations. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1423278878 | | 1423278878 | ||
| 2015-06-10 | | 2015-06-10 | ||
− | | | + | | Enhanced Recovery Project |
+ | | Violations Noted | ||
| Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. Annulus had zero pressure. I contacted Mike McPeak and had them shut in the well and schedule a mechanical integrity test. | | Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. Annulus had zero pressure. I contacted Mike McPeak and had them shut in the well and schedule a mechanical integrity test. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1438284905 | ||
+ | | 2015-07-29 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Tested annulus at 350 psi for 15 minutes with a loss of 15 psi. (5% loss would be 17 psi) Mike McPeak was on site and told me that they did not release the packer. They used the service rig to hold the tubing and used slips to replace the well head. The fluid level stayed at the surface during the repair work. | ||
+ | |- | ||
+ | | 1439416138 | ||
+ | | 2015-08-10 | ||
+ | | Surface Facility Construction | ||
+ | | No Violations | ||
+ | | Accompanied UIC Geologist on inspection of the containment dike. | ||
|- | |- | ||
− | | | + | | 1479182955 |
| 2013-08-06 | | 2013-08-06 | ||
− | | | + | | Surface Facility Construction |
+ | | No Violations | ||
| New unloading pad has been formed up and is ready to pour concrete. | | New unloading pad has been formed up and is ready to pour concrete. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1514160534 | ||
+ | | 2015-07-07 | ||
+ | | Administrative Inspection | ||
+ | | No Violations | ||
+ | | Received a call from Mike McPeak at 4:59 pm Mike informed me that they moved a service rig to the well site today and that they plan (weather permitting) to pull the tubing and packer out of the well on 7-8-15. | ||
|- | |- | ||
− | | | + | | 1523442141 |
− | | | + | | 2017-05-30 |
− | | | + | | Salt Water Injection Well |
− | | No violations | + | | No Violations |
− | + | | Salt water injection well inspection. The injection pressure was 59 PSI, the annulus pressure was 49 PSI. No violations noted. | |
− | |||
− | |||
− | |||
|- | |- | ||
| 1549902834 | | 1549902834 | ||
| 2007-05-24 | | 2007-05-24 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| A follow-up inspection revealed that the dike has been pumped and oily material removed. | | A follow-up inspection revealed that the dike has been pumped and oily material removed. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1591485213 | ||
+ | | 2017-12-11 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | My inspection revealed the well had 61 psi on the annulus and 0 psi on the injection tubing. The well has a legible identification posted. | ||
|- | |- | ||
| 1637831636 | | 1637831636 | ||
| 2015-06-12 | | 2015-06-12 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| Witnessed Mechanical Integrity Test. Annulus was unable to hold the required testing pressure with an acceptable percent of loss over the testing period. | | Witnessed Mechanical Integrity Test. Annulus was unable to hold the required testing pressure with an acceptable percent of loss over the testing period. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1705929669 | | 1705929669 | ||
| 2003-06-30 | | 2003-06-30 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| No violations | | No violations | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 1726267622 | | 1726267622 | ||
| 2011-03-29 | | 2011-03-29 | ||
− | | | + | | Enhanced Recovery Project |
− | | Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 | + | | Violations Noted |
− | + | | Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl. | |
− | |||
− | |||
|- | |- | ||
+ | | 1733031928 | ||
+ | | 2016-08-22 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. | ||
|- | |- | ||
| 1796615297 | | 1796615297 | ||
| 2013-03-28 | | 2013-03-28 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| Inspected the injection pressure and the annulus pressure. Common tank battery with the Sabo # 1 34-163-207760000. | | Inspected the injection pressure and the annulus pressure. Common tank battery with the Sabo # 1 34-163-207760000. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 1929111041 |
− | |||
| 2010-06-30 | | 2010-06-30 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| An inspection revealed no violations at this time. | | An inspection revealed no violations at this time. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1946182450 | ||
+ | | 2018-06-05 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well and facility. The containment dike is free of fluids. | ||
|- | |- | ||
− | | | + | | 2026575206 |
| 2012-06-14 | | 2012-06-14 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| There was fluid in the containment dike. I notified Mr. Jess Hess and made him aware that the dike needs to be kept free of fluid. | | There was fluid in the containment dike. I notified Mr. Jess Hess and made him aware that the dike needs to be kept free of fluid. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2042249159 | ||
+ | | 2018-03-19 | ||
+ | | Salt Water Injection Well | ||
+ | | No Violations | ||
+ | | My inspection revealed the salt water injection well had 15 psi on the injection tubing and had 35 psi on the annulus. The well had a legible identification. | ||
|- | |- | ||
− | | | + | | 2074666858 |
| 2011-12-13 | | 2011-12-13 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| Dike has multiple small holes in liner. Accompanied by Andy Thomas MRI. Andy called pumper and informed him of the repairs needed on the dike. We retuned to the dike later in the day and found repairs on going. Repairs were completed. | | Dike has multiple small holes in liner. Accompanied by Andy Thomas MRI. Andy called pumper and informed him of the repairs needed on the dike. We retuned to the dike later in the day and found repairs on going. Repairs were completed. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2080003988 | ||
+ | | 2015-10-20 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at the well and dike. Wellhead has been excavated 1.5 around the casing. There is some gas and water bubbling from the backside of the 4.5 casing. High Range Quantab was placed in the water and it read 1.8 on the strip which is less than 250 ppm Cl. | ||
|- | |- | ||
− | | | + | | 2096887215 |
| 2006-11-13 | | 2006-11-13 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| A follow-up inspection on 11/13/2006 revealed that the previously noted violations have been resolved. | | A follow-up inspection on 11/13/2006 revealed that the previously noted violations have been resolved. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2117682351 | | 2117682351 | ||
| 2004-07-29 | | 2004-07-29 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| No violations | | No violations | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2133565424 |
− | |||
| 2010-03-23 | | 2010-03-23 | ||
− | | | + | | Enhanced Recovery Project |
+ | | No Violations | ||
| An inspection revealed no violations at this time. | | An inspection revealed no violations at this time. | ||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | iTOMK00010 |
− | | - | + | | 2001-01-17 |
− | + | | Enhanced Recovery Project | |
− | + | | Violations Noted | |
− | |||
− | | | ||
− | | | ||
| | | | ||
|- | |- | ||
+ | | iTOMK00013 | ||
+ | | 2001-05-31 | ||
+ | | Enhanced Recovery Project | ||
+ | | No Violations | ||
+ | | 1509.03; 1501:9-5-09(A)(3); 1509.22(A); 1501:9-5-06 POLLUTION AND VALVE REPLACEMENT | ||
|- | |- | ||
− | | | + | |} |
− | | | + | ==== Violations Commited ==== |
− | | | + | {| class="wikitable sortable" width="95%" |
− | | | + | !scope="col" style="text-align: center"| Inspection ID |
− | | | + | !scope="col" style="text-align: center"| Violation ID |
− | | | + | !scope="col" style="text-align: center"| Violation Date |
− | | | + | !scope="col" style="text-align: center"| Violation Code |
+ | !scope="col" style="text-align: center"| Violation Comments | ||
|- | |- | ||
− | | | + | | 001269i406 |
− | | | + | | US-OH-107258 |
− | | | + | | 2001-10-02 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) | ||
|- | |- | ||
− | | | + | | 005609i201 |
− | + | | US-OH-126228 | |
− | | | + | | 2001-05-31 |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
− | | | + | | Pollution/Contamination |
− | |||
− | |||
|- | |- | ||
− | | | + | | 005609i201 |
− | + | | US-OH-126229 | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| 2001-05-31 | | 2001-05-31 | ||
| | | | ||
− | | | + | | Violation of injection tubing/fitting requirements |
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 0269269556 |
− | | | + | | US-OH-122783 |
− | + | | 2015-03-26 | |
− | | | ||
− | |||
− | |||
− | |||
| | | | ||
+ | | Exceeding maximum allowable injection pressure | ||
|- | |- | ||
− | | | + | | 0766440008 |
− | | | + | | US-OH-128708 |
− | | | + | | 2007-04-23 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | Contamination at storage facility (permit after 6/1/82) | ||
|- | |- | ||
− | | | + | | 0766440008 |
− | | - | + | | US-OH-128709 |
− | | | + | | 2007-04-23 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | Failure to monitor annulus pressure | ||
|- | |- | ||
− | | | + | | 0824384990 |
− | + | | US-OH-129402 | |
− | | | + | | 2007-01-22 |
− | | | ||
− | |||
− | |||
− | |||
| | | | ||
+ | | Contamination at storage facility (permit after 6/1/82) | ||
|- | |- | ||
− | | | + | | 1012998891 |
− | | | + | | US-OH-100530 |
− | | | + | | 2014-09-22 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | Exceeding maximum allowable injection pressure | ||
|- | |- | ||
− | | | + | | 1288556873 |
− | | | + | | US-OH-108142 |
− | + | | 2006-08-04 | |
− | | | ||
− | |||
− | |||
− | |||
| | | | ||
+ | | Contamination at storage facility (permit after 6/1/82) | ||
|- | |- | ||
− | | | + | | 1423278878 |
− | | | + | | US-OH-112340 |
− | | | + | | 2015-08-12 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | Failure to monitor annulus pressure | ||
|- | |- | ||
− | | | + | | 1726267622 |
− | | - | + | | US-OH-117129 |
− | | | + | | 2011-04-04 |
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | Contamination at storage facility (permit after 6/1/82) | ||
|- | |- | ||
− | | | + | | iTOMK00010 |
− | + | | US-OH-131647 | |
− | | | ||
| | | | ||
− | |||
| | | | ||
− | | | + | | Violation of injection tubing/fitting requirements |
− | |||
− | |||
|- | |- | ||
− | | | + | | iTOMK00010 |
− | | | + | | US-OH-131648 |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
| | | | ||
+ | | Failure to monitor annulus pressure | ||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = | + | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables |
− | | publisher = [ | + | |publisher = [[Ohio Department of Natural Resources]] |
− | | date = | + | | date = 2019-05-07 |
− | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Ohio Wells]] |
Well ID: 34-163-20757 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.215580665,"lon":-82.28011694,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Vinton | |
Municipality: Knox Township | |
Operator Name: BANCEQUITY PETROLEUM CORPORATI | |
Well Pad ID: | |
Farm/Lease Name: SABO | |
License Status: Active Injection | |
License Date: 1997-12-18 | |
Spud Date: 1982-09-13 | |
Spud Drilling Contractor: PLATEAU DRLG | |
Final Drill Date: 1982-09-14 | |
Well Total Depth: 1155 ft | |
Configuration: Vertical | |
Latitude: 39.215580665 | |
Longitude: -82.28011694 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-06-08 | Issued Date 6/8/82 Expired Date 12/1/82 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 01155 Proposed Drill Depth 01155 |
Original Spud | 1982-09-13 | CONVERT 10-19-85 |
Completed | 1982-09-14 | CONVERT 10-19-85 |
Reached Total Depth | 1982-09-14 | CONVERT 10-19-85 |
CO | 1983-07-13 | 2282 EQUITY CONVERSION CORP GeoDate 6/8/82 |
First Injection | 1983-07-13 | CONVERT 10-19-85 |
Completion Report Received | 1983-07-25 | CONVERT 10-19-85 |
CO | 1985-10-16 | 631 BT ENERGY CORP GeoDate 10/16/85 |
Enhanced Recovery | 1985-10-16 | Issued Date 10/16/85 Expired Date 10/16/86 Acres 0010000 Tool Type NT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 |
Construction Permit Expires | 1986-10-16 | CONVERT 10-19-85 |
Annulus Pressure Monitoring Approved | 1991-07-01 | CONVERT 10-19-85 |
CO | 1996-04-09 | 4801 BANCEQUITY PETROLEUM CORP GeoDate 10/16/85 |
Last Compliance Report | 2000-04-25 | CONVERT 10-19-85 |
Record Last Modified | 2017-02-15 | CONVERT 10-19-85 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-04-25 | 1112 | 1137 | 1 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 400 Bbl | 20000 | FRAC: 400 BBL H2O, 20M SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000001546 | 2002-11-21 | Enhanced Recovery Project | No Violations | No violations at this time, lease rd will need graded and water breaks in spring. |
000UIC1608 | 1995-10-18 | Enhanced Recovery Project | No Violations | 1501: 9-3-08 TEMPORARY STORAGE |
000UIC1634 | 1996-06-04 | Enhanced Recovery Project | No Violations | 1501: 9-9-05 (A)(9) FLUID IN DIKE |
000UIC1792 | 1999-06-16 | Enhanced Recovery Project | No Violations | 1501: 9-01-07 PREVENT CONTAMINATE |
001269i406 | 2001-10-02 | Enhanced Recovery Project | Violations Noted | An inspection revealed lease rd. needs graded and bare areas seeded and mulched. Bare areas on well site also need seed and mulched. |
0016517193 | 2012-08-31 | Enhanced Recovery Project | No Violations | No violations were noted at the time of inspection. Mr. Mike McPeak was notified of the low annulus pressure. |
005609i201 | 2001-05-31 | Enhanced Recovery Project | Violations Noted | An inspection of the well revealed that a 2 valve and nipple is leaking brine and needs repaired or replaced. |
005609i240 | 2001-07-12 | Enhanced Recovery Project | No Violations | Follow - up on NOV , In - Compliance |
0064201202 | 2007-08-10 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed that the well is in-compliance. |
0082148349 | 2013-08-12 | Surface Facility Construction | No Violations | Unloading pad is constructed. The pad has a curb around the perimeter and is sloped to a sump pit. The sump pit is plumbed directly to the 210 barrel tank. A submersible pump is in the sump pit. Containment dike is free of water. |
01269i1231 | 2002-07-23 | Enhanced Recovery Project | No Violations | Pressures on well meet requirements at this time, no violations. |
0226247185 | 2006-09-25 | Enhanced Recovery Project | No Violations | A follow-up inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 9/25/2006. During the inspection, it was noted that the liner had been repaired however, the dike still needs to be pumped. |
0269269556 | 2015-03-18 | Enhanced Recovery Project | Violations Noted | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. The injection pressure was 360 psi on the state issued gauge. The maximum injection pressure is 325 psi. Reduce the injection pressure. |
0295121720 | 2011-03-29 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # 1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl. |
0319899034 | 2017-07-14 | Salt Water Injection Well | No Violations | Quarterly UIC inspection. The annulus pressure was 70 PSI, the injection tubing was 7 PSI. Legible identification was posted. No violations noted. |
0373932678 | 2010-09-23 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. Note: The gauge utilized for this inspection will require calibration. |
0380400885 | 2005-01-26 | Enhanced Recovery Project | No Violations | No violations. |
0408293390 | 2013-07-17 | Surface Facility Construction | No Violations | Meet with Mike McPeak at the tank battery and review the unloading pad plan and measure the containment dike. |
0430306180 | 2016-03-09 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Witnessed a Bancequity truck unloading on the pad. The truck pumped water out of the containment dike and into the tank. Identification posted at the well and facility. |
0454829053 | 2014-06-27 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, annulus pressure, injection pressure, and witnessed Bancequity brine truck unloading on the pad. Walked the injection line from the containment dike to the well. |
0461446507 | 2011-08-22 | Enhanced Recovery Project | No Violations | No violations observed during inspection. |
0461536130 | 2015-03-18 | Administrative Inspection | No Violations | Received a call from Mike McPeak that they have ordered a murphy switch for the injection pump. It is scheduled to be installed on 3-19-15. The injection pump has been shut off. |
0471716922 | 2008-02-11 | Enhanced Recovery Project | No Violations | No violations were noted. |
0571363893 | 2008-09-16 | Enhanced Recovery Project | No Violations | No violations were noted. |
0626007645 | 2011-01-04 | Enhanced Recovery Project | No Violations | An inspection revealed housekeeping needed at storage tank location. Oil stained ground, due to overflow from 5 gallon containment drum for pump. |
0630290178 | 2019-02-28 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike and tanks show signs of the tank overflowing. The oil has been cleaned up inside the dike. The brine is being removed now. The oil and brine was contained with in the dike. Mike McPeak was on site and told me that a float switch froze and allowed the tanks to overflow into the containment dike. |
0684008598 | 2013-02-12 | Enhanced Recovery Project | No Violations | Upon arrival at this well I noticed that the 2 in ball valve on the annulus was halfway open. When I went to make sure that the 1/4 in needle valve on the annulus was shut, I noticed that it was also halfway open. 0 psi pressure with no vacuum was observed on the annulus. The injection side had a strong vacuum. I notified Mr. Mike McPeak about this and he stated that he would pressure the annulus up next week. |
0695388181 | 2007-06-26 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. |
0704494675 | 2008-05-28 | Enhanced Recovery Project | No Violations | No violations were noted. |
0755675473 | 2016-11-03 | Salt Water Injection Well | No Violations | I received a request from UIC inspector Jon Scott to witness a mechanical integrity. A new tension packer was installed. The test was held at 394 PSI for 15 minutes with no loss in pressure. |
0766440008 | 2007-04-19 | Enhanced Recovery Project | Violations Noted | An inspection revealed no pressure on the annulus side of the well. Also noted was that the dike will need to be pumped. An oil sheen was observed inside the dike. The fluid must be removed from the lease. Additionally, the siphoning of this fluid must be discontinued. During the inspection, it was noted that Bancequity was siphoning fluid from the dike into a trench. |
0801776351 | 2009-09-01 | Enhanced Recovery Project | No Violations | An inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor. No violations were noted. |
0823465623 | 2016-10-28 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. |
0824384990 | 2007-01-11 | Enhanced Recovery Project | Violations Noted | An inspection conducted on 1/11/2007 revealed that the dike needs pumped and C&P removed from inside the dike. |
0847333857 | 2009-03-02 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. |
0867666645 | 2011-12-13 | Enhanced Recovery Project | No Violations | Accompanied Jon Scott on UIC inspection. |
0871616312 | 2009-06-15 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. New identification displayed at the well. |
0873343481 | 2014-04-01 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, unloading pad, injection pressure, and annulus pressure. Identification posted at the tank containment dike and wellhead. |
0889902860 | 2009-12-09 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. |
0902527974 | 2006-06-22 | Enhanced Recovery Project | No Violations | There were no violations at the time of inspection. |
0938708836 | 2011-03-29 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # 295121720 FOLLOW UP TO NOV # 1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl. |
0970762188 | 2013-11-19 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The well has a new unloading pad. Rain water was present in the dike. A pump was running to pump out the water. |
0972298010 | 2016-06-09 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. One 3/4 hole in the liner was marked with orange tape. Mike McPeak was notified of the location of the hole in the liner. |
0976196024 | 2018-09-11 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. Bancequity brine truck pumping out the containment pit during inspection. |
1012998891 | 2014-09-16 | Enhanced Recovery Project | Violations Noted | Inspected containment dike, tanks, unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well. The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure. |
1078824094 | 2003-10-30 | Enhanced Recovery Project | No Violations | No violations. |
1092036246 | 2015-03-19 | Enhanced Recovery Project | No Violations | Company has installed a Murphy pressure cut off switch on the injection line. The cut off is set for 300 psi. |
1104136859 | 2004-03-10 | Enhanced Recovery Project | No Violations | No violations at this time |
1145582263 | 2007-11-05 | Enhanced Recovery Project | No Violations | No violations were noted. |
1147952308 | 2018-10-29 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dike has 4 inches of fluid in the low portion of the containment dike. |
1179644370 | 2013-11-19 | Enhanced Recovery Project | No Violations | Inspected unloading pad, containment dike, tanks, Injection pump, Injection pressure, and annulus pressure. Good identification at the well. Accompanied by Inspector Kip Thompson. |
1189481189 | 2013-08-26 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water. |
1208746443 | 2016-09-01 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, unloading pad, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. |
1269i95057 | 2001-01-17 | Enhanced Recovery Project | No Violations | An inspection revealed that the well head is under water and unable to test the annulus of the well , and a 1 valve on the well which is leaking and needs replaced. Will want to witness the next M I T test on this well , preformed by the company. |
1288556873 | 2006-07-26 | Enhanced Recovery Project | Violations Noted | An inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 7/26/2006. During the inspection, it was noted that the dike needs to be pumped, oily material removed and the liner repaired. |
1294083649 | 2008-06-30 | Enhanced Recovery Project | No Violations | No violations were noted. |
1327928049 | 2005-07-05 | Enhanced Recovery Project | No Violations | Company has set 2- 210bbl tanks on liner. |
1372430772 | 2008-12-22 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. Note: Winter conditions at time of the inspection. |
1393429029 | 2006-11-03 | Enhanced Recovery Project | No Violations | A follow-up inspection conducted on 11/3/2006 revealed that the previously noted violation has not been resolved. The company was contacted by telephone on 11/3/2006 and informed to resolve this violation within a week. |
1414751626 | 2004-01-15 | Enhanced Recovery Project | No Violations | No violations. |
1423278878 | 2015-06-10 | Enhanced Recovery Project | Violations Noted | Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. Annulus had zero pressure. I contacted Mike McPeak and had them shut in the well and schedule a mechanical integrity test. |
1438284905 | 2015-07-29 | Enhanced Recovery Project | No Violations | Tested annulus at 350 psi for 15 minutes with a loss of 15 psi. (5% loss would be 17 psi) Mike McPeak was on site and told me that they did not release the packer. They used the service rig to hold the tubing and used slips to replace the well head. The fluid level stayed at the surface during the repair work. |
1439416138 | 2015-08-10 | Surface Facility Construction | No Violations | Accompanied UIC Geologist on inspection of the containment dike. |
1479182955 | 2013-08-06 | Surface Facility Construction | No Violations | New unloading pad has been formed up and is ready to pour concrete. |
1514160534 | 2015-07-07 | Administrative Inspection | No Violations | Received a call from Mike McPeak at 4:59 pm Mike informed me that they moved a service rig to the well site today and that they plan (weather permitting) to pull the tubing and packer out of the well on 7-8-15. |
1523442141 | 2017-05-30 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The injection pressure was 59 PSI, the annulus pressure was 49 PSI. No violations noted. |
1549902834 | 2007-05-24 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed that the dike has been pumped and oily material removed. |
1591485213 | 2017-12-11 | Salt Water Injection Well | No Violations | My inspection revealed the well had 61 psi on the annulus and 0 psi on the injection tubing. The well has a legible identification posted. |
1637831636 | 2015-06-12 | Enhanced Recovery Project | No Violations | Witnessed Mechanical Integrity Test. Annulus was unable to hold the required testing pressure with an acceptable percent of loss over the testing period. |
1705929669 | 2003-06-30 | Enhanced Recovery Project | No Violations | No violations |
1726267622 | 2011-03-29 | Enhanced Recovery Project | Violations Noted | Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl. |
1733031928 | 2016-08-22 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. |
1796615297 | 2013-03-28 | Enhanced Recovery Project | No Violations | Inspected the injection pressure and the annulus pressure. Common tank battery with the Sabo # 1 34-163-207760000. |
1929111041 | 2010-06-30 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. |
1946182450 | 2018-06-05 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well and facility. The containment dike is free of fluids. |
2026575206 | 2012-06-14 | Enhanced Recovery Project | No Violations | There was fluid in the containment dike. I notified Mr. Jess Hess and made him aware that the dike needs to be kept free of fluid. |
2042249159 | 2018-03-19 | Salt Water Injection Well | No Violations | My inspection revealed the salt water injection well had 15 psi on the injection tubing and had 35 psi on the annulus. The well had a legible identification. |
2074666858 | 2011-12-13 | Enhanced Recovery Project | No Violations | Dike has multiple small holes in liner. Accompanied by Andy Thomas MRI. Andy called pumper and informed him of the repairs needed on the dike. We retuned to the dike later in the day and found repairs on going. Repairs were completed. |
2080003988 | 2015-10-20 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at the well and dike. Wellhead has been excavated 1.5 around the casing. There is some gas and water bubbling from the backside of the 4.5 casing. High Range Quantab was placed in the water and it read 1.8 on the strip which is less than 250 ppm Cl. |
2096887215 | 2006-11-13 | Enhanced Recovery Project | No Violations | A follow-up inspection on 11/13/2006 revealed that the previously noted violations have been resolved. |
2117682351 | 2004-07-29 | Enhanced Recovery Project | No Violations | No violations |
2133565424 | 2010-03-23 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. |
iTOMK00010 | 2001-01-17 | Enhanced Recovery Project | Violations Noted | |
iTOMK00013 | 2001-05-31 | Enhanced Recovery Project | No Violations | 1509.03; 1501:9-5-09(A)(3); 1509.22(A); 1501:9-5-06 POLLUTION AND VALVE REPLACEMENT |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
001269i406 | US-OH-107258 | 2001-10-02 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) | |
005609i201 | US-OH-126228 | 2001-05-31 | Pollution/Contamination | |
005609i201 | US-OH-126229 | 2001-05-31 | Violation of injection tubing/fitting requirements | |
0269269556 | US-OH-122783 | 2015-03-26 | Exceeding maximum allowable injection pressure | |
0766440008 | US-OH-128708 | 2007-04-23 | Contamination at storage facility (permit after 6/1/82) | |
0766440008 | US-OH-128709 | 2007-04-23 | Failure to monitor annulus pressure | |
0824384990 | US-OH-129402 | 2007-01-22 | Contamination at storage facility (permit after 6/1/82) | |
1012998891 | US-OH-100530 | 2014-09-22 | Exceeding maximum allowable injection pressure | |
1288556873 | US-OH-108142 | 2006-08-04 | Contamination at storage facility (permit after 6/1/82) | |
1423278878 | US-OH-112340 | 2015-08-12 | Failure to monitor annulus pressure | |
1726267622 | US-OH-117129 | 2011-04-04 | Contamination at storage facility (permit after 6/1/82) | |
iTOMK00010 | US-OH-131647 | Violation of injection tubing/fitting requirements | ||
iTOMK00010 | US-OH-131648 | Failure to monitor annulus pressure |
For data sources see[5]