X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-163-20757"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-163-20757
 
| Well ID: 34-163-20757
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.21608705, -82.28007788 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.215580665, -82.28011694 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Vinton County, Ohio|Vinton]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name: [[BANCEQUITY PETROLEUM CORP]]
+
| County: [[Vinton_County,_Ohio|Vinton]]
 +
|-
 +
| Municipality: [[Knox_Township,_Vinton_County,_Ohio|Knox Township]]
 +
|-
 +
| Operator Name: [[BANCEQUITY PETROLEUM CORPORATI]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: SABO
 
|-
 
|-
| First Permit Date:  
+
| License Status: Active Injection
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 1997-12-18
 
|-
 
|-
 
| Spud Date: 1982-09-13
 
| Spud Date: 1982-09-13
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[PLATEAU DRLG]]
 +
|-
 +
| Final Drill Date: 1982-09-14
 +
|-
 +
| Well Total Depth: 1155 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Active Injection
+
| Latitude: 39.215580665
 +
|-
 +
| Longitude: -82.28011694
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| Oil and Gas
 +
| 1982-06-08
 +
| Issued Date 6/8/82 Expired Date 12/1/82 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 01155 Proposed Drill Depth 01155
 +
|-
 +
| Original Spud
 +
| 1982-09-13
 +
| CONVERT 10-19-85
 +
|-
 +
| Completed
 +
| 1982-09-14
 +
| CONVERT 10-19-85
 +
|-
 +
| Reached Total Depth
 +
| 1982-09-14
 +
| CONVERT 10-19-85
 +
|-
 +
| CO
 +
| 1983-07-13
 +
| 2282  EQUITY CONVERSION CORP  GeoDate  6/8/82
 +
|-
 +
| First Injection
 +
| 1983-07-13
 +
| CONVERT 10-19-85
 +
|-
 +
| Completion Report Received
 +
| 1983-07-25
 +
| CONVERT 10-19-85
 +
|-
 +
| CO
 +
| 1985-10-16
 +
| 631  BT ENERGY CORP  GeoDate  10/16/85
 
|-
 
|-
| Violations: 0
+
| Enhanced Recovery
 +
| 1985-10-16
 +
| Issued Date 10/16/85 Expired Date 10/16/86 Acres 0010000 Tool Type NT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000
 
|-
 
|-
| Latitude: 39.21608705
+
| Construction Permit Expires
 +
| 1986-10-16
 +
| CONVERT 10-19-85
 
|-
 
|-
| Longitude: -82.28007788
+
| Annulus Pressure Monitoring Approved
 +
| 1991-07-01
 +
| CONVERT 10-19-85
 +
|-
 +
| CO
 +
| 1996-04-09
 +
| 4801  BANCEQUITY PETROLEUM CORP  GeoDate  10/16/85
 +
|-
 +
| Last Compliance Report
 +
| 2000-04-25
 +
| CONVERT 10-19-85
 +
|-
 +
| Record Last Modified
 +
| 2017-02-15
 +
| CONVERT 10-19-85
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
| 2000-04-25
 +
| style="text-align: right;" | 1112
 +
| style="text-align: right;" | 1137
 +
| style="text-align: right;" | 1
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Stimulation Date
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Chemical Agent
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Fracking Fluid Volume
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
!scope="col" | VIOLATION CODE
+
!scope="col" style="text-align: center"| Fracking Company
!scope="col" | VIOLATION COMMENT
+
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| -1012998891
 
| 2014-09-16
 
 
|  
 
|  
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| H2O
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 400 Bbl
 +
| style="text-align: right;" | 20000
 
|  
 
|  
|  
+
| FRAC: 400 BBL H2O, 20M SAND
| Field Visit or Inspection
+
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
|}-->
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| 0000001546
 +
| 2002-11-21
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| No violations at this time, lease rd will need graded and water breaks in spring.
 +
|-
 +
| 000UIC1608
 +
| 1995-10-18
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| 1501: 9-3-08  TEMPORARY STORAGE
 +
|-
 +
| 000UIC1634
 +
| 1996-06-04
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| 1501: 9-9-05 (A)(9)  FLUID IN DIKE
 +
|-
 +
| 000UIC1792
 +
| 1999-06-16
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| 1501: 9-01-07  PREVENT CONTAMINATE
 +
|-
 +
| 001269i406
 +
| 2001-10-02
 +
| Enhanced Recovery Project
 +
| Violations Noted
 +
| An inspection revealed lease rd. needs graded and bare areas seeded and mulched. Bare areas on well site also need seed and mulched.
 +
|-
 +
| 0016517193
 +
| 2012-08-31
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| No violations were noted at the time of inspection.  Mr. Mike McPeak was notified of the low annulus pressure.
 +
|-
 +
| 005609i201
 +
| 2001-05-31
 +
| Enhanced Recovery Project
 +
| Violations Noted
 +
| An inspection of the well revealed that a 2 valve and nipple is leaking brine and needs repaired or replaced.
 +
|-
 +
| 005609i240
 +
| 2001-07-12
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Follow - up on NOV , In - Compliance
 +
|-
 +
| 0064201202
 +
| 2007-08-10
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| A follow-up inspection revealed that the well is in-compliance.
 +
|-
 +
| 0082148349
 +
| 2013-08-12
 +
| Surface Facility Construction
 +
| No Violations
 +
| Unloading pad is constructed. The pad has a curb around the perimeter and is sloped to a sump pit. The sump pit is plumbed directly to the 210 barrel tank. A submersible pump is in the sump pit. Containment dike is free of water.
 +
|-
 +
| 01269i1231
 +
| 2002-07-23
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Pressures on well meet requirements at this time, no violations.
 +
|-
 +
| 0226247185
 +
| 2006-09-25
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| A follow-up inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 9/25/2006.  During the inspection, it was noted that the liner had been repaired however, the dike still needs to be pumped.
 +
|-
 +
| 0269269556
 +
| 2015-03-18
 +
| Enhanced Recovery Project
 +
| Violations Noted
 +
| Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. The injection pressure was 360 psi on the state issued gauge. The maximum injection pressure is 325 psi. Reduce the injection pressure.
 
|-
 
|-
 +
| 0295121720
 +
| 2011-03-29
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| FOLLOW UP TO NOV #  1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35  by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
 
|-
 
|-
| -1012998891
+
| 0319899034
| 2014-09-16
+
| 2017-07-14
|  
+
| Salt Water Injection Well
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|
+
| Quarterly UIC inspection. The annulus pressure was 70 PSI, the injection tubing was 7 PSI. Legible identification was posted. No violations noted.
|
 
| Compliance Notice
 
 
|-
 
|-
 +
| 0373932678
 +
| 2010-09-23
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| An inspection revealed no violations.  Note: The gauge utilized for this inspection will require calibration.
 
|-
 
|-
| -1012998891
+
| 0380400885
| 2014-09-16
+
| 2005-01-26
|
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|  
+
| No violations.
|  
 
| Compliance Notice
 
 
|-
 
|-
 +
| 0408293390
 +
| 2013-07-17
 +
| Surface Facility Construction
 +
| No Violations
 +
| Meet with Mike McPeak at the tank battery and review the unloading pad plan and measure the containment dike.
 
|-
 
|-
| -1012998891
+
| 0430306180
| 2014-09-16
+
| 2016-03-09
|  
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well. The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|
+
| Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Witnessed a Bancequity truck unloading on the pad. The truck  pumped water out of  the containment dike and into the tank. Identification posted at the well and facility.
|
 
| Compliance Notice
 
 
|-
 
|-
 +
| 0454829053
 +
| 2014-06-27
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Inspected the unloading pad, containment dike, tanks, injection pump, annulus pressure, injection pressure, and witnessed Bancequity brine truck unloading on the pad. Walked the injection line from the containment dike to the well.
 
|-
 
|-
| -1012998891
+
| 0461446507
| 2014-09-16
+
| 2011-08-22
|
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|  
+
| No violations observed during inspection.
|  
 
| Phone Call
 
 
|-
 
|-
 +
| 0461536130
 +
| 2015-03-18
 +
| Administrative Inspection
 +
| No Violations
 +
| Received a call from Mike McPeak that they have ordered a murphy switch for the injection pump. It is scheduled to be installed on 3-19-15. The injection pump has been shut off.
 
|-
 
|-
| -1012998891
+
| 0471716922
| 2014-09-16
+
| 2008-02-11
|
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|  
+
| No violations were noted.
|  
 
| Phone Call
 
 
|-
 
|-
 +
| 0571363893
 +
| 2008-09-16
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| No violations were noted.
 
|-
 
|-
| -1012998891
+
| 0626007645
| 2014-09-16
+
| 2011-01-04
|  
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at wellThe maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|
+
| An inspection revealed housekeeping needed at storage tank locationOil stained ground, due to overflow from 5 gallon containment drum for pump.
|
 
| Compliance Notice
 
 
|-
 
|-
 +
| 0630290178
 +
| 2019-02-28
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike and tanks show signs of the tank overflowing. The oil has been cleaned up inside the dike. The brine is being removed now. The oil and brine was contained with in the dike. Mike McPeak was on site and told me that a float switch froze and allowed the tanks to overflow into the containment dike.
 
|-
 
|-
| -1012998891
+
| 0684008598
| 2014-09-16
+
| 2013-02-12
|  
+
| Enhanced Recovery Project
| Inspected containment dike, tanks, unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at wellThe maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|
+
| Upon arrival at this well I noticed that the 2 in ball valve on the annulus was halfway open. When I went to make sure that the 1/4 in needle valve on the annulus was shut, I noticed that it was also halfway open0 psi pressure with no vacuum was observed on the annulus. The injection side had a strong vacuum. I notified Mr. Mike McPeak about this and he stated that he would pressure the annulus up next week.
|
 
| Phone Call
 
 
|-
 
|-
 +
| 0695388181
 +
| 2007-06-26
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| A follow-up inspection revealed non-compliance.
 
|-
 
|-
| -1012998891
+
| 0704494675
| 2014-09-16
+
| 2008-05-28
|
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|  
+
| No violations were noted.
|  
 
| Compliance Notice
 
 
|-
 
|-
 +
| 0755675473
 +
| 2016-11-03
 +
| Salt Water Injection Well
 +
| No Violations
 +
| I received a request from UIC inspector Jon Scott to witness a mechanical integrity. A new tension packer was installed. The test was held at 394 PSI for 15 minutes with no loss in pressure.
 
|-
 
|-
| -1012998891
+
| 0766440008
| 2014-09-16
+
| 2007-04-19
|  
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| Violations Noted
|
+
| An inspection revealed no pressure on the annulus side of the well.  Also noted was that the dike will need to be pumped. An oil sheen was observed inside the dike. The fluid must be removed from the lease.  Additionally, the siphoning of this fluid must be discontinued. During the inspection, it was noted that Bancequity was siphoning fluid from the dike into a trench.
|
 
| Compliance Notice
 
 
|-
 
|-
 +
| 0801776351
 +
| 2009-09-01
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| An inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor.  No violations were noted.
 
|-
 
|-
| -1012998891
+
| 0823465623
| 2014-09-16
+
| 2016-10-28
|  
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well. The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|
+
| Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids.
|
 
| Phone Call
 
 
|-
 
|-
 +
| 0824384990
 +
| 2007-01-11
 +
| Enhanced Recovery Project
 +
| Violations Noted
 +
| An inspection conducted on 1/11/2007 revealed that the dike needs pumped and C&P removed from inside the dike.
 
|-
 
|-
| -1012998891
+
| 0847333857
| 2014-09-16
+
| 2009-03-02
|  
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|
+
| An inspection revealed no violations at this time.
|
 
| Phone Call
 
 
|-
 
|-
 +
| 0867666645
 +
| 2011-12-13
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Accompanied Jon Scott on UIC inspection.
 
|-
 
|-
| -1012998891
+
| 0871616312
| 2014-09-16
+
| 2009-06-15
|  
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at wellThe maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|
+
| An inspection revealed no violations at this timeNew identification displayed at the well.
|
 
|
 
 
|-
 
|-
 +
| 0873343481
 +
| 2014-04-01
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Inspected the containment dike, tanks, injection pump, unloading pad, injection pressure, and annulus pressure. Identification posted at the tank containment dike and wellhead.
 
|-
 
|-
| -1012998891
+
| 0889902860
| 2014-09-16
+
| 2009-12-09
|
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|  
+
| An inspection revealed no violations.
|  
 
|  
 
 
|-
 
|-
 +
| 0902527974
 +
| 2006-06-22
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| There were no violations at the time of inspection.
 
|-
 
|-
| -1012998891
+
| 0938708836
| 2014-09-16
+
| 2011-03-29
|  
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at wellThe maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|
+
| FOLLOW UP TO NOV #  295121720 FOLLOW UP TO NOV #  1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
|
 
|
 
 
|-
 
|-
 +
| 0970762188
 +
| 2013-11-19
 +
| Salt Water Injection Well
 +
| No Violations
 +
| Salt water injection well inspection. The well has a new unloading pad. Rain water was present in the dike. A pump was running to pump out the water.
 
|-
 
|-
| -1012998891
+
| 0972298010
| 2014-09-16
+
| 2016-06-09
|  
+
| Enhanced Recovery Project
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well. The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
+
| No Violations
|
+
| Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. One 3/4 hole in the liner was marked with orange tape. Mike McPeak was notified of the location of the hole in the liner.
|
 
|
 
 
|-
 
|-
 +
| 0976196024
 +
| 2018-09-11
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. Bancequity brine truck pumping out the containment pit during inspection.
 
|-
 
|-
| -1012998891
+
| 1012998891
 
| 2014-09-16
 
| 2014-09-16
|  
+
| Enhanced Recovery Project
 +
| Violations Noted
 
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
 
| Inspected containment dike, tanks,  unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well.  The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1078824094
 
| 1078824094
 
| 2003-10-30
 
| 2003-10-30
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| No violations.
 
| No violations.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1092036246
 
| 1092036246
 
| 2015-03-19
 
| 2015-03-19
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| Company has installed a Murphy pressure cut off switch on the injection line. The cut off is set for 300 psi.
 
| Company has installed a Murphy pressure cut off switch on the injection line. The cut off is set for 300 psi.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1104136859
| -1104136859
 
 
| 2004-03-10
 
| 2004-03-10
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| No violations at this time
 
| No violations at this time
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1145582263
| -1145582263
 
 
| 2007-11-05
 
| 2007-11-05
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| No violations were noted.
 
| No violations were noted.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1147952308
 +
| 2018-10-29
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dike has 4 inches of fluid in the low portion of the containment dike.
 
|-
 
|-
| -1179644370
+
| 1179644370
 
| 2013-11-19
 
| 2013-11-19
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| Inspected unloading pad, containment dike, tanks, Injection pump, Injection pressure, and annulus pressure. Good identification at the well. Accompanied by Inspector Kip Thompson.
 
| Inspected unloading pad, containment dike, tanks, Injection pump, Injection pressure, and annulus pressure. Good identification at the well. Accompanied by Inspector Kip Thompson.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1189481189
| -1189481189
 
 
| 2013-08-26
 
| 2013-08-26
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water.
 
| Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water.
|
 
|
 
|
 
|-
 
|-
 
| 1269i1231
 
| 2002-07-23
 
|
 
| Pressures on well meet requirements at this time, no violations.
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 1208746443
 +
| 2016-09-01
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Inspected the containment dike, tanks, unloading pad, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids.
 
|-
 
|-
| 1269i406
+
| 1269i95057
| 2001-10-02
 
|
 
| An inspection revealed lease rd. needs graded and bare areas seeded and mulched. Bare areas on well site also need seed and mulched.
 
|
 
|
 
|
 
|-
 
|-
 
| 1269i950578
 
 
| 2001-01-17
 
| 2001-01-17
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| An inspection revealed that the well head is under water and unable to test the annulus of the well , and  a 1 valve on the well which is leaking and needs replaced.  Will want to witness the next M I T test on this well , preformed by the company.
 
| An inspection revealed that the well head is under water and unable to test the annulus of the well , and  a 1 valve on the well which is leaking and needs replaced.  Will want to witness the next M I T test on this well , preformed by the company.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1288556873
| -1288556873
 
 
| 2006-07-26
 
| 2006-07-26
|  
+
| Enhanced Recovery Project
 +
| Violations Noted
 
| An inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 7/26/2006.  During the inspection, it was noted that the dike needs to be pumped, oily material removed and the liner repaired.
 
| An inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 7/26/2006.  During the inspection, it was noted that the dike needs to be pumped, oily material removed and the liner repaired.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1294083649
 
| 1294083649
 
| 2008-06-30
 
| 2008-06-30
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| No violations were noted.
 
| No violations were noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -1327928049
+
| 1327928049
 
| 2005-07-05
 
| 2005-07-05
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| Company has set 2- 210bbl tanks on liner.
 
| Company has set 2- 210bbl tanks on liner.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1372430772
 
| 1372430772
 
| 2008-12-22
 
| 2008-12-22
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| An inspection revealed no violations.  Note: Winter conditions at time of the inspection.
 
| An inspection revealed no violations.  Note: Winter conditions at time of the inspection.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1393429029
| -1393429029
 
 
| 2006-11-03
 
| 2006-11-03
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| A follow-up inspection conducted on 11/3/2006 revealed that the previously noted violation has not been resolved.  The company was contacted by telephone on 11/3/2006 and informed to resolve this violation within a week.
 
| A follow-up inspection conducted on 11/3/2006 revealed that the previously noted violation has not been resolved.  The company was contacted by telephone on 11/3/2006 and informed to resolve this violation within a week.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1414751626
 
| 1414751626
 
| 2004-01-15
 
| 2004-01-15
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| No violations.
 
| No violations.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1423278878
 
| 1423278878
 
| 2015-06-10
 
| 2015-06-10
|  
+
| Enhanced Recovery Project
 +
| Violations Noted
 
| Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. Annulus had zero pressure. I contacted Mike McPeak and had them shut in the well and schedule a mechanical integrity test.
 
| Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. Annulus had zero pressure. I contacted Mike McPeak and had them shut in the well and schedule a mechanical integrity test.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1438284905
 +
| 2015-07-29
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Tested annulus at 350 psi for 15 minutes with a loss of 15 psi. (5% loss would be 17 psi) Mike McPeak was on site and told me that they did not release the packer. They used the service rig to hold the tubing and used slips to replace the well head. The fluid level stayed at the surface during the repair work.
 +
|-
 +
| 1439416138
 +
| 2015-08-10
 +
| Surface Facility Construction
 +
| No Violations
 +
| Accompanied UIC Geologist on inspection of the containment dike.
 
|-
 
|-
| -1479182955
+
| 1479182955
 
| 2013-08-06
 
| 2013-08-06
|  
+
| Surface Facility Construction
 +
| No Violations
 
| New unloading pad has been formed up and is ready to pour concrete.
 
| New unloading pad has been formed up and is ready to pour concrete.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1514160534
 +
| 2015-07-07
 +
| Administrative Inspection
 +
| No Violations
 +
| Received a call from Mike McPeak at 4:59 pm Mike informed me that they moved a service rig to the well site today and that they plan (weather permitting) to pull the tubing and packer out of the well on 7-8-15.
 
|-
 
|-
| 1546
+
| 1523442141
| 2002-11-21
+
| 2017-05-30
|  
+
| Salt Water Injection Well
| No violations at this time, lease rd will need graded and water breaks in spring.
+
| No Violations
|
+
| Salt water injection well inspection. The injection pressure was 59 PSI, the annulus pressure was 49 PSI. No violations noted.
|
 
|
 
|-
 
 
|-
 
|-
 
| 1549902834
 
| 1549902834
 
| 2007-05-24
 
| 2007-05-24
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| A follow-up inspection revealed that the dike has been pumped and oily material removed.
 
| A follow-up inspection revealed that the dike has been pumped and oily material removed.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1591485213
 +
| 2017-12-11
 +
| Salt Water Injection Well
 +
| No Violations
 +
| My inspection revealed the well had 61 psi on the annulus and 0 psi on the injection tubing. The well has a legible identification posted.
 
|-
 
|-
 
| 1637831636
 
| 1637831636
 
| 2015-06-12
 
| 2015-06-12
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| Witnessed Mechanical Integrity Test. Annulus was unable to hold the required testing pressure with an acceptable percent of loss over the testing period.
 
| Witnessed Mechanical Integrity Test. Annulus was unable to hold the required testing pressure with an acceptable percent of loss over the testing period.
|
 
|
 
|
 
|-
 
|-
 
| -16517193
 
| 2012-08-31
 
|
 
| No violations were noted at the time of inspection.  Mr. Mike McPeak was notified of the low annulus pressure.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1705929669
 
| 1705929669
 
| 2003-06-30
 
| 2003-06-30
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| No violations
 
| No violations
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1726267622
 
| 1726267622
 
| 2011-03-29
 
| 2011-03-29
|  
+
| Enhanced Recovery Project
| Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 ' by 6' has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
+
| Violations Noted
|
+
| Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
|
 
|
 
 
|-
 
|-
 +
| 1733031928
 +
| 2016-08-22
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted.
 
|-
 
|-
 
| 1796615297
 
| 1796615297
 
| 2013-03-28
 
| 2013-03-28
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| Inspected the injection pressure and the annulus pressure. Common tank battery with the Sabo # 1 34-163-207760000.
 
| Inspected the injection pressure and the annulus pressure. Common tank battery with the Sabo # 1 34-163-207760000.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1929111041
| -1929111041
 
 
| 2010-06-30
 
| 2010-06-30
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| An inspection revealed no violations at this time.
 
| An inspection revealed no violations at this time.
|
 
|
 
|
 
 
|-
 
|-
 +
| 1946182450
 +
| 2018-06-05
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure.  Identification is posted at the well and facility. The containment dike is free of fluids.
 
|-
 
|-
| -2026575206
+
| 2026575206
 
| 2012-06-14
 
| 2012-06-14
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| There was fluid in the containment dike.  I notified Mr. Jess Hess and made him aware that the dike needs to be kept free of fluid.
 
| There was fluid in the containment dike.  I notified Mr. Jess Hess and made him aware that the dike needs to be kept free of fluid.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2042249159
 +
| 2018-03-19
 +
| Salt Water Injection Well
 +
| No Violations
 +
| My inspection revealed the salt water injection well had 15 psi on the injection tubing and had 35 psi on the annulus. The well had a legible identification.
 
|-
 
|-
| -2074666858
+
| 2074666858
 
| 2011-12-13
 
| 2011-12-13
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| Dike has multiple small holes in liner. Accompanied by Andy Thomas MRI. Andy called pumper and informed him of the repairs needed on the dike. We retuned to the dike later in the day and found repairs on going. Repairs were completed.
 
| Dike has multiple small holes in liner. Accompanied by Andy Thomas MRI. Andy called pumper and informed him of the repairs needed on the dike. We retuned to the dike later in the day and found repairs on going. Repairs were completed.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2080003988
 +
| 2015-10-20
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at the well and dike. Wellhead has been excavated 1.5 around the casing. There is some gas and water bubbling from the backside of the 4.5 casing. High Range Quantab was placed in the water and it read 1.8 on the strip which is less than 250 ppm Cl.
 
|-
 
|-
| -2096887215
+
| 2096887215
 
| 2006-11-13
 
| 2006-11-13
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| A follow-up inspection on 11/13/2006 revealed that the previously noted  violations have been resolved.
 
| A follow-up inspection on 11/13/2006 revealed that the previously noted  violations have been resolved.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2117682351
 
| 2117682351
 
| 2004-07-29
 
| 2004-07-29
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| No violations
 
| No violations
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 2133565424
| -2133565424
 
 
| 2010-03-23
 
| 2010-03-23
|  
+
| Enhanced Recovery Project
 +
| No Violations
 
| An inspection revealed no violations at this time.
 
| An inspection revealed no violations at this time.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| iTOMK00010
| -226247185
+
| 2001-01-17
| 2006-09-25
+
| Enhanced Recovery Project
|
+
| Violations Noted
| A follow-up inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 9/25/2006.  During the inspection, it was noted that the liner had been repaired however, the dike still needs to be pumped.
 
|  
 
|  
 
 
|  
 
|  
 
|-
 
|-
 +
| iTOMK00013
 +
| 2001-05-31
 +
| Enhanced Recovery Project
 +
| No Violations
 +
| 1509.03; 1501:9-5-09(A)(3); 1509.22(A); 1501:9-5-06 POLLUTION AND VALVE REPLACEMENT
 
|-
 
|-
| 269269556
+
|}
| 2015-03-18
+
==== Violations Commited ====
|  
+
{| class="wikitable sortable" width="95%"
| Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. The injection pressure was 360 psi on the state issued gauge. The maximum injection pressure is 325 psi. Reduce the injection pressure.
+
!scope="col" style="text-align: center"| Inspection ID
|  
+
!scope="col" style="text-align: center"| Violation ID
|  
+
!scope="col" style="text-align: center"| Violation Date
|  
+
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 
|-
 
|-
|-
+
| 001269i406
| 295121720
+
| US-OH-107258
| 2011-03-29
+
| 2001-10-02
|
 
| FOLLOW UP TO NOV #  1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 ' by 6' has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
 
|
 
|
 
 
|  
 
|  
 +
| Failure to restore land surface within 9 mos.  (CHANGE) (REPLACE)
 
|-
 
|-
|-
+
| 005609i201
| 373932678
+
| US-OH-126228
| 2010-09-23
+
| 2001-05-31
|
 
| An inspection revealed no violations.  Note: The gauge utilized for this inspection will require calibration.
 
|
 
|
 
|
 
|-
 
|-
 
| 380400885
 
| 2005-01-26
 
|
 
| No violations.
 
 
|  
 
|  
|  
+
| Pollution/Contamination
|
 
|-
 
 
|-
 
|-
| -408293390
+
| 005609i201
| 2013-07-17
+
| US-OH-126229
|
 
| Meet with Mike McPeak at the tank battery and review the unloading pad plan and measure the containment dike.
 
|
 
|
 
|
 
|-
 
|-
 
| 454829053
 
| 2014-06-27
 
|
 
| Inspected the unloading pad, containment dike, tanks, injection pump, annulus pressure, injection pressure, and witnessed Bancequity brine truck unloading on the pad. Walked the injection line from the containment dike to the well.
 
|
 
|
 
|
 
|-
 
|-
 
| -461446507
 
| 2011-08-22
 
|
 
| No violations observed during inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| 461536130
 
| 2015-03-18
 
|
 
| Received a call from Mike McPeak that they have ordered a murphy switch for the injection pump. It is scheduled to be installed on 3-19-15. The injection pump has been shut off.
 
|
 
|
 
|
 
|-
 
|-
 
| -471716922
 
| 2008-02-11
 
|
 
| No violations were noted.
 
|
 
|
 
|
 
|-
 
|-
 
| 5609i201
 
 
| 2001-05-31
 
| 2001-05-31
 
|  
 
|  
| An inspection of the well revealed that a 2 valve and nipple is leaking brine and needs repaired or replaced.
+
| Violation of injection tubing/fitting requirements
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 0269269556
| 5609i240
+
| US-OH-122783
| 2001-07-12
+
| 2015-03-26
|  
 
| Follow - up on NOV , In - Compliance
 
|
 
|
 
 
|  
 
|  
 +
| Exceeding maximum allowable injection pressure
 
|-
 
|-
|-
+
| 0766440008
| 571363893
+
| US-OH-128708
| 2008-09-16
+
| 2007-04-23
|
 
| No violations were noted.
 
|
 
|
 
 
|  
 
|  
 +
| Contamination at storage facility (permit after 6/1/82)
 
|-
 
|-
|-
+
| 0766440008
| -626007645
+
| US-OH-128709
| 2011-01-04
+
| 2007-04-23
|
 
| An inspection revealed housekeeping needed at storage tank location.  Oil stained ground, due to overflow from 5 gallon containment drum for pump.
 
|
 
|
 
 
|  
 
|  
 +
| Failure to monitor annulus pressure
 
|-
 
|-
|-
+
| 0824384990
| 64201202
+
| US-OH-129402
| 2007-08-10
+
| 2007-01-22
|  
 
| A follow-up inspection revealed that the well is in-compliance.
 
|
 
|
 
 
|  
 
|  
 +
| Contamination at storage facility (permit after 6/1/82)
 
|-
 
|-
|-
+
| 1012998891
| 684008598
+
| US-OH-100530
| 2013-02-12
+
| 2014-09-22
|
 
| Upon arrival at this well I noticed that the 2 in ball valve on the annulus was halfway open.  When I went to make sure that the 1/4 in needle valve on the annulus was shut, I noticed that it was also halfway open.  0 psi pressure with no vacuum was observed on the annulus.  The injection side had a strong vacuum.  I notified Mr. Mike McPeak about this and he stated that he would pressure the annulus up next week.
 
|
 
|
 
 
|  
 
|  
 +
| Exceeding maximum allowable injection pressure
 
|-
 
|-
|-
+
| 1288556873
| 695388181
+
| US-OH-108142
| 2007-06-26
+
| 2006-08-04
|  
 
| A follow-up inspection revealed non-compliance.
 
|
 
|
 
 
|  
 
|  
 +
| Contamination at storage facility (permit after 6/1/82)
 
|-
 
|-
|-
+
| 1423278878
| 704494675
+
| US-OH-112340
| 2008-05-28
+
| 2015-08-12
|
 
| No violations were noted.
 
|
 
|
 
 
|  
 
|  
 +
| Failure to monitor annulus pressure
 
|-
 
|-
|-
+
| 1726267622
| -766440008
+
| US-OH-117129
| 2007-04-19
+
| 2011-04-04
|
 
| An inspection revealed no pressure on the annulus side of the well.  Also noted was that the dike will need to be pumped.  An oil sheen was observed inside the dike.  The fluid must be removed from the lease.  Additionally, the siphoning of this fluid must be discontinued.  During the inspection, it was noted that Bancequity was siphoning fluid from the dike into a trench.
 
|
 
|
 
 
|  
 
|  
 +
| Contamination at storage facility (permit after 6/1/82)
 
|-
 
|-
|-
+
| iTOMK00010
| 801776351
+
| US-OH-131647
| 2009-09-01
 
 
|  
 
|  
| An inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor.  No violations were noted.
 
 
|  
 
|  
|  
+
| Violation of injection tubing/fitting requirements
|
 
|-
 
 
|-
 
|-
| 82148349
+
| iTOMK00010
| 2013-08-12
+
| US-OH-131648
|
 
| Unloading pad is constructed. The pad has a curb around the perimeter and is sloped to a sump pit. The sump pit is plumbed directly to the 210 barrel tank. A submersible pump is in the sump pit. Containment dike is free of water.
 
|
 
|
 
|
 
|-
 
|-
 
| -824384990
 
| 2007-01-11
 
|
 
| An inspection conducted on 1/11/2007 revealed that the dike needs pumped and C&P removed from inside the dike.
 
|
 
|
 
|
 
|-
 
|-
 
| 847333857
 
| 2009-03-02
 
|
 
| An inspection revealed no violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 867666645
 
| 2011-12-13
 
|
 
| Accompanied Jon Scott on UIC inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| 871616312
 
| 2009-06-15
 
|
 
| An inspection revealed no violations at this time.  New identification displayed at the well.
 
|
 
|
 
|
 
|-
 
|-
 
| -873343481
 
| 2014-04-01
 
|
 
| Inspected the containment dike, tanks, injection pump, unloading pad, injection pressure, and annulus pressure. Identification posted at the tank containment dike and wellhead.
 
|
 
|
 
|
 
|-
 
|-
 
| 889902860
 
| 2009-12-09
 
|
 
| An inspection revealed no violations.
 
|
 
|
 
|
 
|-
 
|-
 
| 902527974
 
| 2006-06-22
 
|
 
| There were no violations at the time of inspection.
 
|
 
|
 
|
 
|-
 
|-
 
| -938708836
 
| 2011-03-29
 
|
 
| FOLLOW UP TO NOV #  295121720 FOLLOW UP TO NOV #  1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 ' by 6' has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
 
|
 
|
 
|
 
|-
 
|-
 
| -970762188
 
| 2013-11-19
 
|
 
| Salt water injection well inspection. The well has a new unloading pad. Rain water was present in the dike. A pump was running to pump out the water.
 
|
 
|
 
|
 
|-
 
|-
 
| iTOMK000104
 
| 2001-01-17
 
|
 
|
 
|
 
|
 
|
 
|-
 
|-
 
| iTOMK000137
 
| 2001-05-31
 
|
 
| 1509.03; 1501:9-5-09(A)(3); 1509.22(A); 1501:9-5-06 POLLUTION AND VALVE REPLACEMENT
 
|
 
|
 
|
 
|-
 
|-
 
| UIC1608
 
| 1995-10-18
 
|
 
| 1501: 9-3-08  TEMPORARY STORAGE
 
|
 
|
 
|
 
|-
 
|-
 
| UIC1634
 
| 1996-06-04
 
|
 
| 1501: 9-9-05 (A)(9)  FLUID IN DIKE
 
|
 
|
 
|
 
|-
 
|-
 
| UIC1792
 
| 1999-06-16
 
|
 
| 1501: 9-01-07  PREVENT CONTAMINATE
 
|
 
 
|  
 
|  
 
|  
 
|  
 +
| Failure to monitor annulus pressure
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 09:41, 25 July 2019

Well Details

Well ID: 34-163-20757
Loading map...
Country: United States
State: Ohio
County: Vinton
Municipality: Knox Township
Operator Name: BANCEQUITY PETROLEUM CORPORATI
Well Pad ID:
Farm/Lease Name: SABO
License Status: Active Injection
License Date: 1997-12-18
Spud Date: 1982-09-13
Spud Drilling Contractor: PLATEAU DRLG
Final Drill Date: 1982-09-14
Well Total Depth: 1155 ft
Configuration: Vertical
Latitude: 39.215580665
Longitude: -82.28011694

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1982-06-08 Issued Date 6/8/82 Expired Date 12/1/82 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 01155 Proposed Drill Depth 01155
Original Spud 1982-09-13 CONVERT 10-19-85
Completed 1982-09-14 CONVERT 10-19-85
Reached Total Depth 1982-09-14 CONVERT 10-19-85
CO 1983-07-13 2282 EQUITY CONVERSION CORP GeoDate 6/8/82
First Injection 1983-07-13 CONVERT 10-19-85
Completion Report Received 1983-07-25 CONVERT 10-19-85
CO 1985-10-16 631 BT ENERGY CORP GeoDate 10/16/85
Enhanced Recovery 1985-10-16 Issued Date 10/16/85 Expired Date 10/16/86 Acres 0010000 Tool Type NT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000
Construction Permit Expires 1986-10-16 CONVERT 10-19-85
Annulus Pressure Monitoring Approved 1991-07-01 CONVERT 10-19-85
CO 1996-04-09 4801 BANCEQUITY PETROLEUM CORP GeoDate 10/16/85
Last Compliance Report 2000-04-25 CONVERT 10-19-85
Record Last Modified 2017-02-15 CONVERT 10-19-85

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-04-25 1112 1137 1

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 400 Bbl 20000 FRAC: 400 BBL H2O, 20M SAND

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000001546 2002-11-21 Enhanced Recovery Project No Violations No violations at this time, lease rd will need graded and water breaks in spring.
000UIC1608 1995-10-18 Enhanced Recovery Project No Violations 1501: 9-3-08 TEMPORARY STORAGE
000UIC1634 1996-06-04 Enhanced Recovery Project No Violations 1501: 9-9-05 (A)(9) FLUID IN DIKE
000UIC1792 1999-06-16 Enhanced Recovery Project No Violations 1501: 9-01-07 PREVENT CONTAMINATE
001269i406 2001-10-02 Enhanced Recovery Project Violations Noted An inspection revealed lease rd. needs graded and bare areas seeded and mulched. Bare areas on well site also need seed and mulched.
0016517193 2012-08-31 Enhanced Recovery Project No Violations No violations were noted at the time of inspection. Mr. Mike McPeak was notified of the low annulus pressure.
005609i201 2001-05-31 Enhanced Recovery Project Violations Noted An inspection of the well revealed that a 2 valve and nipple is leaking brine and needs repaired or replaced.
005609i240 2001-07-12 Enhanced Recovery Project No Violations Follow - up on NOV , In - Compliance
0064201202 2007-08-10 Enhanced Recovery Project No Violations A follow-up inspection revealed that the well is in-compliance.
0082148349 2013-08-12 Surface Facility Construction No Violations Unloading pad is constructed. The pad has a curb around the perimeter and is sloped to a sump pit. The sump pit is plumbed directly to the 210 barrel tank. A submersible pump is in the sump pit. Containment dike is free of water.
01269i1231 2002-07-23 Enhanced Recovery Project No Violations Pressures on well meet requirements at this time, no violations.
0226247185 2006-09-25 Enhanced Recovery Project No Violations A follow-up inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 9/25/2006. During the inspection, it was noted that the liner had been repaired however, the dike still needs to be pumped.
0269269556 2015-03-18 Enhanced Recovery Project Violations Noted Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. The injection pressure was 360 psi on the state issued gauge. The maximum injection pressure is 325 psi. Reduce the injection pressure.
0295121720 2011-03-29 Enhanced Recovery Project No Violations FOLLOW UP TO NOV # 1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
0319899034 2017-07-14 Salt Water Injection Well No Violations Quarterly UIC inspection. The annulus pressure was 70 PSI, the injection tubing was 7 PSI. Legible identification was posted. No violations noted.
0373932678 2010-09-23 Enhanced Recovery Project No Violations An inspection revealed no violations. Note: The gauge utilized for this inspection will require calibration.
0380400885 2005-01-26 Enhanced Recovery Project No Violations No violations.
0408293390 2013-07-17 Surface Facility Construction No Violations Meet with Mike McPeak at the tank battery and review the unloading pad plan and measure the containment dike.
0430306180 2016-03-09 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Witnessed a Bancequity truck unloading on the pad. The truck pumped water out of the containment dike and into the tank. Identification posted at the well and facility.
0454829053 2014-06-27 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, annulus pressure, injection pressure, and witnessed Bancequity brine truck unloading on the pad. Walked the injection line from the containment dike to the well.
0461446507 2011-08-22 Enhanced Recovery Project No Violations No violations observed during inspection.
0461536130 2015-03-18 Administrative Inspection No Violations Received a call from Mike McPeak that they have ordered a murphy switch for the injection pump. It is scheduled to be installed on 3-19-15. The injection pump has been shut off.
0471716922 2008-02-11 Enhanced Recovery Project No Violations No violations were noted.
0571363893 2008-09-16 Enhanced Recovery Project No Violations No violations were noted.
0626007645 2011-01-04 Enhanced Recovery Project No Violations An inspection revealed housekeeping needed at storage tank location. Oil stained ground, due to overflow from 5 gallon containment drum for pump.
0630290178 2019-02-28 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike and tanks show signs of the tank overflowing. The oil has been cleaned up inside the dike. The brine is being removed now. The oil and brine was contained with in the dike. Mike McPeak was on site and told me that a float switch froze and allowed the tanks to overflow into the containment dike.
0684008598 2013-02-12 Enhanced Recovery Project No Violations Upon arrival at this well I noticed that the 2 in ball valve on the annulus was halfway open. When I went to make sure that the 1/4 in needle valve on the annulus was shut, I noticed that it was also halfway open. 0 psi pressure with no vacuum was observed on the annulus. The injection side had a strong vacuum. I notified Mr. Mike McPeak about this and he stated that he would pressure the annulus up next week.
0695388181 2007-06-26 Enhanced Recovery Project No Violations A follow-up inspection revealed non-compliance.
0704494675 2008-05-28 Enhanced Recovery Project No Violations No violations were noted.
0755675473 2016-11-03 Salt Water Injection Well No Violations I received a request from UIC inspector Jon Scott to witness a mechanical integrity. A new tension packer was installed. The test was held at 394 PSI for 15 minutes with no loss in pressure.
0766440008 2007-04-19 Enhanced Recovery Project Violations Noted An inspection revealed no pressure on the annulus side of the well. Also noted was that the dike will need to be pumped. An oil sheen was observed inside the dike. The fluid must be removed from the lease. Additionally, the siphoning of this fluid must be discontinued. During the inspection, it was noted that Bancequity was siphoning fluid from the dike into a trench.
0801776351 2009-09-01 Enhanced Recovery Project No Violations An inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor. No violations were noted.
0823465623 2016-10-28 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids.
0824384990 2007-01-11 Enhanced Recovery Project Violations Noted An inspection conducted on 1/11/2007 revealed that the dike needs pumped and C&P removed from inside the dike.
0847333857 2009-03-02 Enhanced Recovery Project No Violations An inspection revealed no violations at this time.
0867666645 2011-12-13 Enhanced Recovery Project No Violations Accompanied Jon Scott on UIC inspection.
0871616312 2009-06-15 Enhanced Recovery Project No Violations An inspection revealed no violations at this time. New identification displayed at the well.
0873343481 2014-04-01 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, unloading pad, injection pressure, and annulus pressure. Identification posted at the tank containment dike and wellhead.
0889902860 2009-12-09 Enhanced Recovery Project No Violations An inspection revealed no violations.
0902527974 2006-06-22 Enhanced Recovery Project No Violations There were no violations at the time of inspection.
0938708836 2011-03-29 Enhanced Recovery Project No Violations FOLLOW UP TO NOV # 295121720 FOLLOW UP TO NOV # 1726267622 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
0970762188 2013-11-19 Salt Water Injection Well No Violations Salt water injection well inspection. The well has a new unloading pad. Rain water was present in the dike. A pump was running to pump out the water.
0972298010 2016-06-09 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. One 3/4 hole in the liner was marked with orange tape. Mike McPeak was notified of the location of the hole in the liner.
0976196024 2018-09-11 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. Bancequity brine truck pumping out the containment pit during inspection.
1012998891 2014-09-16 Enhanced Recovery Project Violations Noted Inspected containment dike, tanks, unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well. The maximum injection pressure is 325 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
1078824094 2003-10-30 Enhanced Recovery Project No Violations No violations.
1092036246 2015-03-19 Enhanced Recovery Project No Violations Company has installed a Murphy pressure cut off switch on the injection line. The cut off is set for 300 psi.
1104136859 2004-03-10 Enhanced Recovery Project No Violations No violations at this time
1145582263 2007-11-05 Enhanced Recovery Project No Violations No violations were noted.
1147952308 2018-10-29 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dike has 4 inches of fluid in the low portion of the containment dike.
1179644370 2013-11-19 Enhanced Recovery Project No Violations Inspected unloading pad, containment dike, tanks, Injection pump, Injection pressure, and annulus pressure. Good identification at the well. Accompanied by Inspector Kip Thompson.
1189481189 2013-08-26 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water.
1208746443 2016-09-01 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, unloading pad, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids.
1269i95057 2001-01-17 Enhanced Recovery Project No Violations An inspection revealed that the well head is under water and unable to test the annulus of the well , and a 1 valve on the well which is leaking and needs replaced. Will want to witness the next M I T test on this well , preformed by the company.
1288556873 2006-07-26 Enhanced Recovery Project Violations Noted An inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 7/26/2006. During the inspection, it was noted that the dike needs to be pumped, oily material removed and the liner repaired.
1294083649 2008-06-30 Enhanced Recovery Project No Violations No violations were noted.
1327928049 2005-07-05 Enhanced Recovery Project No Violations Company has set 2- 210bbl tanks on liner.
1372430772 2008-12-22 Enhanced Recovery Project No Violations An inspection revealed no violations. Note: Winter conditions at time of the inspection.
1393429029 2006-11-03 Enhanced Recovery Project No Violations A follow-up inspection conducted on 11/3/2006 revealed that the previously noted violation has not been resolved. The company was contacted by telephone on 11/3/2006 and informed to resolve this violation within a week.
1414751626 2004-01-15 Enhanced Recovery Project No Violations No violations.
1423278878 2015-06-10 Enhanced Recovery Project Violations Noted Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. Annulus had zero pressure. I contacted Mike McPeak and had them shut in the well and schedule a mechanical integrity test.
1438284905 2015-07-29 Enhanced Recovery Project No Violations Tested annulus at 350 psi for 15 minutes with a loss of 15 psi. (5% loss would be 17 psi) Mike McPeak was on site and told me that they did not release the packer. They used the service rig to hold the tubing and used slips to replace the well head. The fluid level stayed at the surface during the repair work.
1439416138 2015-08-10 Surface Facility Construction No Violations Accompanied UIC Geologist on inspection of the containment dike.
1479182955 2013-08-06 Surface Facility Construction No Violations New unloading pad has been formed up and is ready to pour concrete.
1514160534 2015-07-07 Administrative Inspection No Violations Received a call from Mike McPeak at 4:59 pm Mike informed me that they moved a service rig to the well site today and that they plan (weather permitting) to pull the tubing and packer out of the well on 7-8-15.
1523442141 2017-05-30 Salt Water Injection Well No Violations Salt water injection well inspection. The injection pressure was 59 PSI, the annulus pressure was 49 PSI. No violations noted.
1549902834 2007-05-24 Enhanced Recovery Project No Violations A follow-up inspection revealed that the dike has been pumped and oily material removed.
1591485213 2017-12-11 Salt Water Injection Well No Violations My inspection revealed the well had 61 psi on the annulus and 0 psi on the injection tubing. The well has a legible identification posted.
1637831636 2015-06-12 Enhanced Recovery Project No Violations Witnessed Mechanical Integrity Test. Annulus was unable to hold the required testing pressure with an acceptable percent of loss over the testing period.
1705929669 2003-06-30 Enhanced Recovery Project No Violations No violations
1726267622 2011-03-29 Enhanced Recovery Project Violations Noted Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
1733031928 2016-08-22 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted.
1796615297 2013-03-28 Enhanced Recovery Project No Violations Inspected the injection pressure and the annulus pressure. Common tank battery with the Sabo # 1 34-163-207760000.
1929111041 2010-06-30 Enhanced Recovery Project No Violations An inspection revealed no violations at this time.
1946182450 2018-06-05 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well and facility. The containment dike is free of fluids.
2026575206 2012-06-14 Enhanced Recovery Project No Violations There was fluid in the containment dike. I notified Mr. Jess Hess and made him aware that the dike needs to be kept free of fluid.
2042249159 2018-03-19 Salt Water Injection Well No Violations My inspection revealed the salt water injection well had 15 psi on the injection tubing and had 35 psi on the annulus. The well had a legible identification.
2074666858 2011-12-13 Enhanced Recovery Project No Violations Dike has multiple small holes in liner. Accompanied by Andy Thomas MRI. Andy called pumper and informed him of the repairs needed on the dike. We retuned to the dike later in the day and found repairs on going. Repairs were completed.
2080003988 2015-10-20 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at the well and dike. Wellhead has been excavated 1.5 around the casing. There is some gas and water bubbling from the backside of the 4.5 casing. High Range Quantab was placed in the water and it read 1.8 on the strip which is less than 250 ppm Cl.
2096887215 2006-11-13 Enhanced Recovery Project No Violations A follow-up inspection on 11/13/2006 revealed that the previously noted violations have been resolved.
2117682351 2004-07-29 Enhanced Recovery Project No Violations No violations
2133565424 2010-03-23 Enhanced Recovery Project No Violations An inspection revealed no violations at this time.
iTOMK00010 2001-01-17 Enhanced Recovery Project Violations Noted
iTOMK00013 2001-05-31 Enhanced Recovery Project No Violations 1509.03; 1501:9-5-09(A)(3); 1509.22(A); 1501:9-5-06 POLLUTION AND VALVE REPLACEMENT

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
001269i406 US-OH-107258 2001-10-02 Failure to restore land surface within 9 mos. (CHANGE) (REPLACE)
005609i201 US-OH-126228 2001-05-31 Pollution/Contamination
005609i201 US-OH-126229 2001-05-31 Violation of injection tubing/fitting requirements
0269269556 US-OH-122783 2015-03-26 Exceeding maximum allowable injection pressure
0766440008 US-OH-128708 2007-04-23 Contamination at storage facility (permit after 6/1/82)
0766440008 US-OH-128709 2007-04-23 Failure to monitor annulus pressure
0824384990 US-OH-129402 2007-01-22 Contamination at storage facility (permit after 6/1/82)
1012998891 US-OH-100530 2014-09-22 Exceeding maximum allowable injection pressure
1288556873 US-OH-108142 2006-08-04 Contamination at storage facility (permit after 6/1/82)
1423278878 US-OH-112340 2015-08-12 Failure to monitor annulus pressure
1726267622 US-OH-117129 2011-04-04 Contamination at storage facility (permit after 6/1/82)
iTOMK00010 US-OH-131647 Violation of injection tubing/fitting requirements
iTOMK00010 US-OH-131648 Failure to monitor annulus pressure

For data sources see[5]

References