If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Plugged and Abandoned | | License Status: Plugged and Abandoned | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2016-11-14 |
|- | |- | ||
| Spud Date: 1985-07-24 | | Spud Date: 1985-07-24 |
Well ID: 34-119-27306 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.801256739,"lon":-81.72041328,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Meigs Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: OHIO POWER COMPANY | |
License Status: Plugged and Abandoned | |
License Date: 2016-11-14 | |
Spud Date: 1985-07-24 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1985-07-29 | |
Well Total Depth: 5266 ft | |
Configuration: Vertical | |
Latitude: 39.801256739 | |
Longitude: -81.72041328 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1985-07-11 | 182 BELDEN & BLAKE CO GeoDate 7/11/85 |
Oil and Gas | 1985-07-11 | Issued Date 7/11/85 Expired Date 7/11/86 Acres 0080000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05266 Proposed Drill Depth 05266 |
Original Spud | 1985-07-24 | CHG. ACG. 4-23-88. UPDATED WELL LOCATION PER SURVEYOR'S COORDINATES ALE 03/29/2017. |
Completed | 1985-07-29 | CHG. ACG. 4-23-88. UPDATED WELL LOCATION PER SURVEYOR'S COORDINATES ALE 03/29/2017. |
Reached Total Depth | 1985-07-29 | CHG. ACG. 4-23-88. UPDATED WELL LOCATION PER SURVEYOR'S COORDINATES ALE 03/29/2017. |
Completion Report Received | 1985-08-15 | CHG. ACG. 4-23-88. UPDATED WELL LOCATION PER SURVEYOR'S COORDINATES ALE 03/29/2017. |
Change of Owner | 2007-04-27 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 7578, ENERVEST OPERATING LLC |
APP | 2016-11-14 | Proposed Formations:CLINTON GROUP, Issued Date:11/14/2016, Expired Date:11/14/2018 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2018-06-21 | CHG. ACG. 4-23-88. UPDATED WELL LOCATION PER SURVEYOR'S COORDINATES ALE 03/29/2017. |
Record Last Modified | 2018-10-31 | CHG. ACG. 4-23-88. UPDATED WELL LOCATION PER SURVEYOR'S COORDINATES ALE 03/29/2017. |
Construction Permit Expires | 2018-11-14 | CHG. ACG. 4-23-88. UPDATED WELL LOCATION PER SURVEYOR'S COORDINATES ALE 03/29/2017. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4977 | 5065 | 0 |
2006-09-11 | 5019 | 5049 | 9 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 70000 Gal | 0 | FRAC;H2O,SAND,N2 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL8028 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0618664612 | 2006-08-30 | Production Wells | No Violations | Okay, Producing |
0710740485 | 2016-09-07 | Production Wells | Violations Noted
-100 barrel steel tank and 1-75 barrel fiberglass tank. There is a dike around the tanks and identification present. The well owner /operator shall submit a written plugging schedule to Patrick Shreve at 5880 Memory Rd. Zanesville, Ohio 43701 within 30 days per OAC 1501:9-11-05(B) and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied. | |
0855323744 | 2003-10-21 | Production Wells | No Violations | |
1529922822 | 2018-06-21 | Plug / Plug Back | No Violations | The inspection was conducted under cloudy and muddy conditions from previous rain. The temperature is 73 degrees Fahrenheit. The inspection was conducted as a Compliance Notice follow-up to number -710740485. The well was almost plugged out to surface on 6-20--inch casing was cut down and plated with the identification. The plugging of the well resolved the said Compliance Notice number -710740485. |
1564031513 | 2015-10-27 | Production Wells | No Violations | On the day of my inspection I found that the wellhead was equipped with a 4.5 to 2 swage. The valve was sitting at an angle on the top of the threads of the swage. The lead line was disconnected and there was a steady trickle of gas flowing from the line. I took digital photos of the wellhead. The tank battery consisted of one 100 barrel tank, one make-shift fiberglass tank of unknown volume, one separator and an earthen dike. Identification was posted and there were no leaks or spills in the tank battery. There was no visible access road to this well. In its current state this well is incapable of production. |
1734711738 | 2018-06-20 | Plug / Plug Back | No Violations | The inspection was conducted under hot, humid and dry conditions. The temperature was 84 degrees Fahrenheit. The inspection is due to Compliance Notice follow-up to number ---3500 feet. Chipco ran 60 sacks of regular class A cement. They displaced with a 56 barrels of salt water. The rig then pulled up to Bottom of the 8 5/8- inch casing. Chipco set 100 feet out side of the casing and 100 feet inside the casing. The plug was set from 1895--sacks of regular class A cement plug and the cement did not come up. Shut down. Will top off tomorrow. Total of 250 sacks of class A cement was used. |
1842571452 | 2018-06-19 | Plug / Plug Back | No Violations | The inspection was conducted under hot, humid and dry conditions. The temperature was 84 degrees Fahrenheit. The inspection is due to Compliance Notice follow-up to number -710740485. The well is being plugged by Chipco, and they are setting the bottom hole plug across the Clinton sandstone from 5075- |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0710740485 | US-OH-128040 | 2016-10-06 | Well shall be plugged |
For data sources see[9]