Line 11: Line 11:
 
| County: [[Cuyahoga_County,_Ohio|Cuyahoga]]
 
| County: [[Cuyahoga_County,_Ohio|Cuyahoga]]
 
|-
 
|-
| Municipality:  
+
| Municipality: Mayfield Township
 
|-
 
|-
 
| Operator Name: [[BAAY OIL LLC]]
 
| Operator Name: [[BAAY OIL LLC]]
Line 21: Line 21:
 
| License Status: Producing
 
| License Status: Producing
 
|-
 
|-
| License Date: 2011-09-19
+
| License Date: 2010-03-17
 
|-
 
|-
 
| Spud Date: 2010-04-30
 
| Spud Date: 2010-04-30

Revision as of 14:34, 25 July 2019

Well Details

Well ID: 34-035-22152
Loading map...
Country: United States
State: Ohio
County: Cuyahoga
Municipality: Mayfield Township
Operator Name: BAAY OIL LLC
Well Pad ID:
Farm/Lease Name: BONEYARD UNIT
License Status: Producing
License Date: 2010-03-17
Spud Date: 2010-04-30
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2010-05-07
Well Total Depth: 3599 ft
Configuration: Vertical
Latitude: 41.518881916
Longitude: -81.46728250

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-03-17 Proposed Formations:OHIO SHALE/ORISKANY/NEWBURG/CLINTON, Issued Date:3/17/2010, Expired Date:3/17/2011 6:00:00 AM, Drilling unit acres:20.99, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-05-07
Construction Permit Expires 2011-03-17
Completion Report Received 2011-07-13
Change of Owner 2016-01-29 Operator changed from 1304, SEAGULL DEVELOPMENT CORP to 8560, BAAY OIL LLC
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-09-20 3385 3416 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-05-12 H2O 0 68268 Gal 25000 Superior Well Services

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 SEAGULL DEVELOPMENT CORP 24430 124 120
2011 SEAGULL DEVELOPMENT CORP 65717 42 365
2012 SEAGULL DEVELOPMENT CORP 50904 63 366
2013 SEAGULL DEVELOPMENT CORP 39265 0 365
2014 SEAGULL DEVELOPMENT CORP 36745 0 365
2015 SEAGULL DEVELOPMENT CORP 31853 40 365
2016 BAAY OIL LLC 28787 0 365
2017 BAAY OIL LLC 27699 0 365
2018 BAAY OIL LLC 24734 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 SEAGULL DEVELOPMENT CORP Brine 1673 120
2011 SEAGULL DEVELOPMENT CORP Brine 149 365
2012 SEAGULL DEVELOPMENT CORP Brine 40 366
2013 SEAGULL DEVELOPMENT CORP Brine 178 365
2014 SEAGULL DEVELOPMENT CORP Brine 80 365
2015 SEAGULL DEVELOPMENT CORP Brine 41 365
2016 BAAY OIL LLC Brine 128 365
2017 BAAY OIL LLC Brine 80 365
2018 BAAY OIL LLC Brine 72 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0653855526 2016-02-02 UrbanProduction Wells No Violations I inspected this well location as part of routine inspection activity. At the time of this inspection, I observed the following: Ingress and egress from the well area is afforded by the shared asphalt-paved driveway and parking areas for a multi-tenant retail strip shopping area that fronts Mayfield Road. A wellhead with mechanical plunger lift system is located in a board-on-board enclosure in an otherwise open area in the rear parking lot. The well enclosure was locked and secure. Fittings and connections at the wellhead were secure and free from leakage. The 8.625-inch casing annulus was exposed and plumbed into the system. Areas around the wellhead consist of asphalt parking lot. The tank battery is located 300 feet southeast of the wellhead in a grassy fringe area. The battery is comprised of a 100-barrel, low-boy steel production tank, one 50-barrel poly brine tank. At the time of this inspection, the access gate to the battery was locked and secure. Signage was present. Fittings and connections were secure and free from signs of leakage or problems. Process safety gear and carbon filter system was present. Secondary containment was intact and dry. Tank lids are closed. The load-outs were plugged and locked. Evergreen screening is present surrounding the battery and was good condition. I walked the area surrounding the battery and observed normal grassy vegetation with no signs of erosional deficits or impacts associated with the production operation.
0709260089 2017-04-04 UrbanProduction Wells No Violations I inspected this well location pursuant to complaint (#5575) regarding heaving of asphalt pavement at the the well. Upon my inspection, I noted two, large linear areas of heaved asphalt next to the wellhead, co-incident with the former locations of the drilling pits. The vertical offset was approximately 3 to 6 inches. I contacted Brooks Yarborough about the need for mitigation. Brooks indicated that BAAY Oil was aware of the problem and would remedy within the next 30 days. I contacted the complainant and advised that BAAY OIL was going to remedy the problem.
0792210072 2013-06-05 UrbanProduction Wells No Violations The unit consists of a producing wellhead and tank battery, both of which are in board-on-board enclosures and locked. The wellhead consists of a mechanical lift unit and is producing. The annular space is exposed and gauged, showing 60 PSI. The tank battery is comprised of 2 low-boy 100 barrel tanks and a 25 barrel poly tank. HB 278 equipment is in place and the secondary containment is good. The interior spacing is in accordance with the rules. There is also a Dominion metering run in the battery. I did not observe any problems or violations. The unit passes preliminary restoration.
0860009006 2010-05-04 Drill / Deepen / Reopen No Violations drilling at 2182 on fluid no odors.
1269008152 2010-03-04 Drill / Deepen / Reopen No Violations permit issued on 3-17-10 presite done on 3-04-10
1278891289 2010-04-28 Drill / Deepen / Reopen No Violations cementing conductor casing.
1331664029 2012-03-06 UrbanProduction Wells No Violations Well in compliance, no violations found.
1344373999 2010-04-30 Drill / Deepen / Reopen No Violations BOP test. Passed
1366503198 2010-06-01 Drill / Deepen / Reopen No Violations Company working on flow lines to tank battery.area around well has been repaved and fencing up around wellhead.
1370442225 2013-06-05 UrbanPreliminary Restoration No Violations Unit is producing, enclosures are in place and locked. Screening is in place around tank battery. HB 278 safety gear is present. Annular space at wellhead is exposed and gauged, showing 60 PSI. No problems or violations noted.
1416458904 2015-02-24 UrbanProduction Wells No Violations I inspected this well as part of routine inspection activity . The well and battery are located behind the main stretch of retail buildings along Mayfield Road. Access to the unit is via the parking lot of the restaurant at 5900 Mayfield Rd. Connections and fittings at the wellhead and battery are secure. Enclosure gates are locked. Signage is present and accurate. Load-outs are plugged and secure. Production reports are current. At the time of this inspection there is 12 to 15 inches of snow cover, which obscures some of the surficial features. The areas surrounding the wellhead and battery are comprised of a grassy tree lawn adjacent to the parking area. The tree lawn is snow-covered. I did not observe any signs of impacts relating to the well on the surrounding areas.
1475701606 2010-04-30 Drill / Deepen / Reopen No Violations cementing surface casing.
2058918007 2011-02-15 Production Wells No Violations Unable to check Perlimary restoration ground snow covered.
2088408285 2017-08-18 UrbanProduction Wells No Violations I inspected this well location pursuant to an earlier complaint (#5575) in which it had been noted that the former pits had heaved up substantially resulting in displacement of the asphalt pavement. At the time of this inspection, the areas of the parking lot that had been affected by the heaving were restored, and no additional work is needed.

For data sources see[9]