If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 15: | Line 15: | ||
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]] | | Operator Name: [[CHESAPEAKE EXPLORATION LLC]] | ||
|- | |- | ||
− | | Well Pad ID: [[000347]] | + | | Well Pad ID: [[US-OH-000347]] |
|- | |- | ||
| Farm/Lease Name: RIFFLE 21-15-3 | | Farm/Lease Name: RIFFLE 21-15-3 | ||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2012-06-14 |
|- | |- | ||
| Spud Date: 2012-10-07 | | Spud Date: 2012-10-07 |
Well ID: 34-029-21737 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.847108932,"lon":-80.81176138,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Columbiana | |
Municipality: Salem | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: US-OH-000347 | |
Farm/Lease Name: RIFFLE 21-15-3 | |
License Status: Producing | |
License Date: 2012-06-14 | |
Spud Date: 2012-10-07 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2012-10-29 | |
Well Total Depth: 12835 ft | |
Configuration: Horizontal | |
Latitude: 40.847108932 | |
Longitude: -80.81176138 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-06-14 | Proposed Formations:POINT PLEASANT, Issued Date:6/14/2012, Expired Date:6/14/2014 12:00:00 PM, Drilling unit acres:129.5, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2012-10-29 | |
Correction to Well | 2013-03-22 | CORRECTION TO TARGET INFORMATION: FOOTAGE AND X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 114 ACRES. |
End of Confidential Data | 2013-10-29 | |
Construction Permit Expires | 2014-06-14 | |
Completion Report Received | 2014-08-22 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-06-06 | 8608 | 12680 | 280 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/14/2012 | 11/14/2012 | 7773.00 | 3,170,790.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CI-150 (Corrosion Inhibitor) | FTS International | Corrosion Inhibitor | Isopropanol | 67-63-0 | 60.00 | 0.00066000 | |
Proprietary Aromatic Aldehyde | 10.00 | 0.00011000 | ||||||
N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00011000 | |||||
Proprietary Organic Amine Resin Salt | 30.00 | 0.00033000 | ||||||
Proprietary Quaternary Ammonium Compound | 10.00 | 0.00011000 | ||||||
MC B-8642 (WS) | Multi-Chem Group | Antibacterial Agent | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides | 68424-85-1 | 10.00 | 0.00211000 | ||
Glutaraldehyde | 111-30-8 | 60.00 | 0.01 | |||||
Ethanol | 64-17-5 | 1.00 | 0.00021000 | |||||
100 Mesh Sand | FTS International | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 1.43 | ||
FRW-200 | FTS International | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 26.00 | 0.01 | ||
FE 200 | FTS International | Iron Control Agent | Ethylenediaminetetraacetic acid tetrasodium salt hydrate | 64-02-8 | 41.00 | 0.00165000 | ||
Sodium hydroxide | 1310-73-2 | 1.90 | 0.00008000 | |||||
Glycine, N,N-bis(carboxymethyl)-, trisodium salt | 5064-31-3 | 2.00 | 0.00008000 | |||||
B10 (HIGH PH BUFFER) | FTS International | pH Adjusting Agent | Potassium hydroxide | 1310-58-3 | 20.00 | 0.00119000 | ||
Carbonic acid, dipotassium salt | 584-08-7 | 48.00 | 0.00285000 | |||||
NaturaLine MX 588-2 | Multi-Chem Group | Scale Inhibitor | No Hazardous Components | 0.00 | ||||
APB-01 Ammonium Persulfate Breaker | FTS International | Breaker | Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.00140000 | ||
Borate XL Instant XL (BXL02) | FTS International | Crosslinker | Potassium hydroxide | 1310-58-3 | 12.00 | 0.00485000 | ||
Sodium metaborate tetrahydrate | 10555-76-7 | 25.00 | 0.01 | |||||
Boric acid | 10043-35-3 | 15.00 | 0.00606000 | |||||
Additional Ingredients Not Listed on MSDS | ||||||||
HVG01 (TURQUOISE-1 BULK) | FTS International | Gelling Agent | Distillates, petroleum, hydrotreated light | 64742-47-8 | 55.00 | 0.06 | ||
Guar gum | 9000-30-0 | 50.00 | 0.05 | |||||
Ethoxylated propoxylated C12-14 alcohols | 68439-51-0 | 2.00 | 0.00233000 | |||||
Quartz | 14808-60-7 | 2.00 | 0.00233000 | |||||
LT Encapsulated AP Breaker (LTB01) | FTS International | Breaker | Quartz | 14808-60-7 | 25.00 | 0.02 | ||
Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.11 | |||||
Proprietary Cured Acrylic Resin | 25.00 | 0.02 | ||||||
Fresh Water | Carrier/Base Fluid | 83.55 | ||||||
MC B 8642 WS, NaturaLine MX 588-2 | Multi-Chem Group | Anti-Bacterial Agent, Scale Inhibitor | Water | 7732-18-5 | ||||
Non-MSDS Components Not Provided by Supplier | ||||||||
Methanol | 67-56-1 | |||||||
Northern White Sand | FTS International | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 13.99 | ||
APB01 (AMMONIUM PERSUFATE BREAKER)
B10 (HIGH PH BUFFER), BXL02 Borate XL CI-150, FE 200, FRW-200, LTB-01 |
FTS International | Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Iron Control Agent, pH Adjusting Agent | Proprietary Corrosion Inhibitor Additive (CI-150) | |||||
Proprietary Iron Control Additive (FE-200L) | ||||||||
Proprietary Breaker (APB01) Additive | ||||||||
Water | 7732-18-5 | |||||||
Proprietary Breaker Additive (LTB-1) | ||||||||
Proprietary Friction Reducer Additive (FRW-200 and FRW-200W) | ||||||||
10.1 - 15 HCL | FTS International | Acid | Water | 7732-18-5 | 85.00 | 0.55 | ||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.09 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-11-14 | H2O | 15 | 11092 Bbl | 699408 | Frac Tech Services | STAGE 4
40 SHOTS |
2012-11-14 | H2O | 15 | 10579 Bbl | 699730 | Frac Tech Services | STAGE 1
40 SHOTS |
0 | 0 | 0 | ||||
2012-11-14 | H2O | 15 | 10633 Bbl | 699730 | Frac Tech Services | STAGE 2
40 SHOTS |
2012-11-15 | H2O | 15 | 10334 Bbl | 698408 | Frac Tech Services | STAGE 5
40 SHOTS |
2012-11-15 | H2O | 15 | 10551 Bbl | 703624 | Frac Tech Services | STAGE 7
40 SHOTS |
2012-11-15 | H2O | 15 | 10474 Bbl | 695442 | Frac Tech Services | STAGE 6
40 SHOTS |
2012-11-14 | H2O | 15 | 10765 Bbl | 696390 | Frac Tech Services | STAGE 3
40 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 0 | 0 | 2 |
2014 | CHESAPEAKE EXPLORATION LLC | 267714 | 1651 | 174 |
2015 | CHESAPEAKE EXPLORATION LLC | 252982 | 1054 | 363 |
2016 | CHESAPEAKE EXPLORATION LLC | 178293 | 483 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 140773 | 368 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 120412 | 314 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 27683 | 88 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 816 | 2 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 6027 | 174 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 4185 | 363 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2516 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1602 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1241 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 467 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0033698122 | 2016-04-04 | Production Wells | No Violations | I was on location for a status check. My inspection found the access road gate locked and the
access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #10H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the tank battery. The equipment on the pad consists of the following: 2 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 1 - Gas processing unit (GPU) 1 - Sand separator 1 - Thermal electric generator 1 - Producing well Site fenced and man doors locked |
0193270321 | 2016-10-24 | Production Wells | No Violations | The purpose for my inspection was to conduct a status check on the Riffle 21-15-3 #10H (#2-1737-00- |
0446483847 | 2016-03-02 | Preliminary Restoration | No Violations | I was on location for a status check. My inspection found the access road gate locked and the access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #10H well is in production. The well is equipped with a plunger lift assembly. There is a steel dike around the tank battery.
The equipment on the pad consists of the following: 2 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 1 - Gas processing unit (GPU) 1 - Sand separator 1 - Thermal electric generator 1 - Producing well Site fenced and man doors locked |
0729864468 | 2012-10-09 | Drill / Deepen / Reopen | No Violations | I went to the site to check on the progress of completion of the surface casing installation. Nomac 310 had spudded the well on 10/07/2012, and TDd the surface hole at 591 KB on 10/07/2012. The rig had installed the 13.375 OD casing to the bottom of the hole and attempted to circulate. The casing pressured up, as it appeared to be packed off. The rig began to remove the casing, and got hung up. The casing parted and part of the casing string fell down hole. The rig had to fish it out. At the time of my site visit, there was still one joint of casing in the hole. Fishing would continue until the last joint was removed. A new string of surface casing would then be installed. |
0763189225 | 2012-09-07 | Drill / Deepen / Reopen | No Violations | |
0805651358 | 2102-10-30 | Drill / Deepen / Reopen | No Violations
-Tex Pumping was the cementing contractor. The cement job was done in stages. Following a spacer designed to recover the oil-based mud used to drill the hole and condition the hole, a scavenger cement followed by a tail cement were pumped. The scavenger cement was mudscaled at 13.0 pounds per gallon (ppg). O-Tex pumped 229 bbls of scavenger cement at 13.0 ppg. O-Tex then pumped 393 bbls of tail cement at 15.3 ppg. The plug was dropped, and displaced with 283 bbls of water. When the displacement volume reached 195 bbls, circulation was lost. According to a representative of O- | |
0918304266 | 2013-09-13 | Drill / Deepen / Reopen | No Violations | I went to the site to check the completion of the mousehole and the cellar. The mousehole was installed within the cellar, and both were well cemented. The site is ready for the arrival of the drilling rig. |
1193860219 | 2012-10-14 | Drill / Deepen / Reopen | No Violations
-Tex Pumping was the cementing contractor. There was good fluid circulation throughout the cementing operation. The cement was mudscaled at 15.6 pounds per gallon (ppg), and O-Tex and pumped 106 bbls of cement slurry at 15.6 ppg. Cement returns to the surface were observed. An estimated 8 bbls of cement returned to the surface. The plug was displaced with 96 bbls of water. The plug bumped the float collar at 11:23am. Pressure held. The float held when the pressure was released, and 0.5 bbls of water bled back. | |
1367953544 | 2012-09-05 | Drill / Deepen / Reopen | No Violations | I was at the site to check the progress on the conductor drilling operation. United Drilling was on location and in the process of drilling the conductor hole. The cellar was installed. |
1368100671 | 2012-10-10 | Drill / Deepen / Reopen | No Violations
-Tex Pumping was the cementing contractor. There was good fluid circulation throughout the cementing operation. The cement was mudscaled at 15.8 lbs per gallon (ppg), and then adjusted to 15.6 ppg. O-Tex pumped 117.5 bbls of cement slurry at 15.6 ppg. Cement returns to surface were observed. An estimated 23 bbls of cement returned to surface. The plug was displaced with 85 bbls of water. The plug bumped the float collar at 4:37pm. O-Tex pressured up on the casing, and the pressure held. When the pressure was released, approximately 0.5 bbl of water flowed back, and the float held. | |
1409837557 | 2014-06-17 | Preliminary Restoration | No Violations | I stopped by the site to check on the status of well completion and restoration. The well has been hydraulically fractured. There is two 400 barrel tanks and one GPU production unit. The well is equipped with a Christmas tree. Values are locked out. Tanks or the wellhead do note have ID signs posted. I walked the entire site, and found the location to be in good condition. All erosion and sedimentation controls, and drainage controls appear to be functioning. Ground cover is well established along the access road and around the drilling pad. No areas of erosion are present. Preliminary restoration approval will not be finalized until well is in production and ID sigs are posted. |
1929721836 | 2012-10-12 | Drill / Deepen / Reopen | No Violations | I stopped at the site to check on the drilling progress for the intermediate casing. I met with drilling consultant, Joe Bailey. Drilling hadnt resumed due to mechanical issues. |
2011006015 | 2012-10-05 | Drill / Deepen / Reopen | No Violations | I went to the site to have a pre-spud meeting with drilling consultant Mike Kirkpatrick of Chesapeake. Nomac 310 was onsite, and rigging up. I reviewed the new well construction regulations with Mr. Kirkpatrick, and provided him with a copy. Drilling superintendent John Snook requested a copy as well. The rig anticipated spudding on Saturday 10/06/2012. |
For data sources see[10]