If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: 2007- | + | | License Date: 2007-05-31 |
|- | |- | ||
| Spud Date: 2007-07-09 | | Spud Date: 2007-07-09 |
Well ID: 34-111-24115 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.753513841,"lon":-81.17337611,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Summit Township | |
Operator Name: P P & G OIL | |
Well Pad ID: | |
Farm/Lease Name: BOLON WILLIAM L | |
License Status: Producing | |
License Date: 2007-05-31 | |
Spud Date: 2007-07-09 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2007-07-11 | |
Well Total Depth: 2565 ft | |
Configuration: Vertical | |
Latitude: 39.753513841 | |
Longitude: -81.17337611 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-05-31 | Proposed Formations:DEVONIAN SHALE, Issued Date:5/31/2007, Expired Date:5/30/2008 6:00:00 AM, Drilling unit acres:20.04, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2007-07-11 | |
Reached Total Depth | 2007-07-11 | |
Completion Report Received | 2007-09-19 | |
Construction Permit Expires | 2008-05-30 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-12-21 | 2028 | 2041 | 29 |
2007-12-21 | 1976 | 1984 | 10 |
2007-12-21 | 2150 | 2165 | 11 |
2007-12-21 | 2438 | 2498 | 63 |
2007-12-21 | 2285 | 2332 | 71 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 180000 Gal | 0 | 3 STAGE FRAC INCLUDING WEIR SAND…FRAC BAFFLES SET @ 2349 & 2090' |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | P P & G OIL | 2266 | 215 | 140 |
2008 | P P & G OIL | 3301 | 144 | 365 |
2009 | P P & G OIL | 2105 | 50 | 365 |
2010 | P P & G OIL | 1621 | 79 | 365 |
2011 | P P & G OIL | 1643 | 85 | 0 |
2012 | P P & G OIL | 1941 | 0 | 366 |
2013 | P P & G OIL | 1461 | 61 | 365 |
2014 | P P & G OIL | 764 | 43 | 365 |
2015 | P P & G OIL | 722 | 0 | 365 |
2016 | P P & G OIL | 806 | 59 | 365 |
2017 | P P & G OIL | 757 | 11 | 365 |
2018 | P P & G OIL | 761 | 29 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | P P & G OIL | Brine | 10 | 140 |
2008 | P P & G OIL | Brine | 40 | 365 |
2009 | P P & G OIL | Brine | 24 | 365 |
2010 | P P & G OIL | Brine | 28 | 365 |
2011 | P P & G OIL | Brine | 31 | |
2012 | P P & G OIL | Brine | 0 | 366 |
2013 | P P & G OIL | Brine | 16 | 365 |
2014 | P P & G OIL | Brine | 25 | 365 |
2015 | P P & G OIL | Brine | 11 | 365 |
2016 | P P & G OIL | Brine | 27 | 365 |
2017 | P P & G OIL | Brine | 6 | 365 |
2018 | P P & G OIL | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1162018089 | 2007-12-26 | Preliminary Restoration | No Violations | Restoration work at site satisfactory, well is equipped with pumping unit and tubing and rods and 2-100 bbl tanks with dike in place,tank dike will need to be built up when SPCC rules go into effect. |
1510752641 | 2017-11-14 | Production Wells | No Violations | On this day, I am conducting a follow-up inspection on a Chiefs Order: ORDER NO. 2016-180. I found (1) 100 barrel steel tank, domestic meter, drip tank, and vertical separator all contained within an earthen dike. The valve is open leading into the separator. The tank is properly identified. The well is equipped with 4.5 inch diameter casing with the valve open, 2 inch diameter tubing with the valve open, and produced by means of a pumping unit that is currently pumping during my inspection. Pictures and video were taken on this day. |
For data sources see[9]