Difference between revisions of "34-111-24429"

m
m
Line 15: Line 15:
 
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
| Operator Name: [[GULFPORT ENERGY CORPORATION]]
 
|-
 
|-
| Well Pad ID: [[000472]]
+
| Well Pad ID: [[US-OH-000472]]
 
|-
 
|-
 
| Farm/Lease Name: GARY GREEN N WSH MN
 
| Farm/Lease Name: GARY GREEN N WSH MN
Line 21: Line 21:
 
| License Status: Producing
 
| License Status: Producing
 
|-
 
|-
| License Date: 2017-08-23
+
| License Date: 2014-09-26
 
|-
 
|-
 
| Spud Date: 2013-12-23
 
| Spud Date: 2013-12-23

Revision as of 23:44, 25 July 2019

Well Details

Well ID: 34-111-24429
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Washington Township
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID: US-OH-000472
Farm/Lease Name: GARY GREEN N WSH MN
License Status: Producing
License Date: 2014-09-26
Spud Date: 2013-12-23
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-11-21
Well Total Depth: 15337 ft
Configuration: Horizontal
Latitude: 39.676392461
Longitude: -81.18870309

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-11-04 Proposed Formations:UTICA SHALE-POLINT PLEASANT, Issued Date:11/4/2013, Expired Date:11/4/2015 12:00:00 PM, Drilling unit acres:465574, Proposed Well Type:OG, Proposed Well Class:EDPW
Change of Owner 2014-09-22 Operator changed from 8793, HG ENERGY LLC to 9193, AMERICAN ENERGY UTICA LLC
APP 2014-09-26 Proposed Formations:POINT PLEASANT, Issued Date:9/26/2014, Expired Date:9/25/2016 12:00:00 PM, Drilling unit acres:524.579, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-11-21
Change of Owner 2015-06-19 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION
Construction Permit Expires 2016-09-25
Completion Report Received 2018-01-25
Record Last Modified 2018-02-07

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-02-06 9580 9723 50
2018-02-06 14931 15080 50

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/17/2017 03/10/2017 9104 13,672,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Gulfport Carrier/Base Fluid Water 7732-18-5 100 88.0068 114,099,000.0
Other Chemical(s) Listed Above See Trade Name(s) List Propargyl alcohol 107-19-7 5 0.00003473 45.025
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00003473 45.025
Alcohols, C12-14, ethoxylated 68439-50-9 1.5 0.00127398 1651.68
Cocamide DEA 68603-42-9 5 0.00003473 45.025
2-Ethyl hexanol 104-76-7 10 0.00006946 90.051
Alcohols, C12-16, ethoxylated 68551-12-2 1.5 0.00127398 1651.68
Ammonium chloride 12125-02-9 13 0.0110411 14314.6
WATER 7732-18-5 100 0.111777 144916
Methyl alcohol 67-56-1 35 0.000243103 315.178
Alcohols, C10-16, ethoxylated 68002-97-1 1.5 0.00127398 1651.68
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride 68424-85-1 10 0.00275166 3567.47
Tall oil fatty acid 61790-12-3 5 0.00003473 45.025
Didecyl dimethyl ammonium chloride 7173-51-5 10 0.00275166 3567.47
Ethanol 64-17-5 5 0.00137583 1783.73
SC-30 X-Chem Scale Inhibitor Sodium Hydroxide 1310-73-2 1.5 0.000298144 386.537
SFR-470 X-Chem Friction Reducer Alcohols, C12-14, ethoxylated 68439-50-9 1.5 0.00127398 1651.68
Alcohols, C10-16, ethoxylated 68002-97-1 1.5 0.00127398 1651.68
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0254795 33033.7
Alcohols, C12-16, ethoxylated 68551-12-2 1.5 0.00127398 1651.68
Ammonium chloride 12125-02-9 13 0.0110411 14314.6
100 mesh sand Muskie PROPPING AGENT CRYSTALLINE SILICA 14808-60-7 100 1.1974 1,552,400.0
NEFE-210 X-Chem Acid Non-Emulsifier and Iron Control Acetic acid 64-19-7 65 0.000451478 585.331
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00003473 45.025
Cocamide DEA 68603-42-9 5 0.00003473 45.025
Propargyl alcohol 107-19-7 5 0.00003473 45.025
Methyl alcohol 67-56-1 35 0.000243103 315.178
2-Ethyl hexanol 104-76-7 10 0.00006946 90.051
Tall oil fatty acid 61790-12-3 5 0.00003473 45.025
B-84 X-Chem Biocide Glutaraldehyde 111-30-8 30 0.00825499 10702.4
Didecyl dimethyl ammonium chloride 7173-51-5 10 0.00275166 3567.47
Ethanol 64-17-5 5 0.00137583 1783.73
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride 68424-85-1 10 0.00275166 3567.47
40/70 white sand Muskie PROPPING AGENT CRYSTALLINE SILICA IN THE FORM OF QUARTZ 14808-60-7 100 10.551 13,679,200.0
28% HCl Acid X-Chem ACID WATER 7732-18-5 100 0.111777 144916
HYDROCHLORIC ACID 7647-01-0 32 0.0357685 46373.1

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-02-17 H2O 15 10434 Bbl 514980 EVOLUTION WELL SERVICE STAGE 1/1

STAGES 2-30 SEE IMAGES

2017-03-10 H2O 15 10099 Bbl 502030 EVOLUTION WELL SERVICE STAGE 31/31

STAGES 2-30 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION 1706463 0 211
2018 GULFPORT ENERGY CORPORATION 1072073 0 363
2019 GULFPORT ENERGY CORPORATION 172335 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION Brine 28974 211
2018 GULFPORT ENERGY CORPORATION Brine 11571 363
2019 GULFPORT ENERGY CORPORATION Brine 1500 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0706777318 2017-03-06 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Evolution Energy Service DC turbine electric powered stimulation pump fleet is on location and has stimulated 19 stages on the 5-H well. Red Dirt rentals completion master valves are in place on each of the 5 wells on location. Nine Energy completion service is on location perforating each stage of the well bores to be stimulated with 5 clusters of 10 shots each cluster. The well completion iron is 15,000 psi rated capacity. All completion equipment is located on secondary polymer containment with the well pad berm serving as the primary containment with the perimeter drain valves in the closed position.
1168519268 2018-03-05 Production Wells No Violations Producing well status check inspection found the well head designed to produce from the tubing well head above the B-Section and casing head section. In the tubing section vertically there is a total of (2) manually operated valves then the tubing flow cross, attached to the tubing flow cross downstream is a third manual valve then a Emergency Shut Down (ESD) valve with remotely controlled switches at multiple locations on location including at the well head and gas processing units along with the production facility and entry point of the location. On location there is a total of (6) active well heads with annular pressure monitoring in place on each well head. The said well has annular pressure gauges in place with the valves in the open position. The annular pressure between the 13.375 casing and 9.625casing reads 0 psi and between the 9.625 casing and the 5.5 casing 800 psi. Addressing the well support equipment on location- at the entry point of the location is a midstream operation operated by EQT Company, on the left hand side of the well pad is a total of (6) gas processing units one each for every active well on the pad. At the left rear corner of the well pad is the production facility consisting of a total of (4) steel construction tanks each with a total fluid volume of 400 barrels capacity, the tanks are situated inside a polymer lined steel containment dike area. The well pad does have a perimeter earthen berm. Proper well identification is posted at the each well and the tank battery as well as the entry point of the lease road and well pad.
1296895184 2017-06-27 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is in good repair and graveled from County Road 12 to the well pad. There is a midstream distribution sales point located on the South East side of the well pad near the well pad entry point, Rice Energy is the Mid Stream operator and there is a glycol dehydration unit present on the mid stream site. Situated on the well pad is a total of( 6) wells all now in production with production trees in place and the well head production valves in the open position. The wells are all equipped with annular monitoring pressure gauges. The wells are selling into gas processing units with a total of (6 )gas processing units on location one for each well. Also present on the West side of the well pad is the production fluid storage area consisting of a total of (4) steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. The pumper is on site and has indicted they are shipping 2,100 barrels of production flow back fluid per every 24 hours. Identification is posted at each well and at the end of the lease road. Safety shut down points are at each well along with at the production facility and well pad entry point.
1387825320 2013-12-23 Casing String Witnessed No Violations The said well was spudded on this day with 100 of 20 conductor set by the top hole rig.
1399572972 2014-05-08 Drill / Deepen / Reopen No Violations Status check inspection found Decker Drilling rig # 10 on location drilling the 17.5 surface borehole at a current depth of 438.
1399863928 2014-05-09 Casing String Witnessed No Violations 05/09/2014 Decker drilling rig # 10 has drilled the 17.5 surface bore to a depth of 1085 with 1079 of 13.375 54.5# casing ran with a float shoe and float collar ran along with proper centralizer placement demonstrated and the casing pressure tested to 500 psi over lift pressure upon the landing of the plug with good cement returns to surface.
1489166873 2017-03-10 Completion Testing No Violations Status check inspection on the well completion process found Evolution Energy Service DC Electric powered pressure pumping service on location pumping the 31th and final stage to be stimulated. The stage will be stimulated with a total mix of approximately 10,500 barrels of product consisting of approximately 500,000 pounds of sand. Nine Energy Wireline is on location and has perforated the stage between the depths of 9,580 and 9,723 with a total of 50 perforations shot in 5 clusters utilizing 90 degree phasing. The well head annular pressures are being monitored electronically.
1681457862 2018-03-05 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The lease road is gated and an EQT midstream production facility is situated on the righthand side, prior to the well pad. There is an emergency shutdown button on the left, at the entrance. The well is equipped with annular pressure monitoring and an emergency shutdown button is located at the wellhead. There are (6) gas processing units on the left of the pad, and all are equipped with an emergency shutdown button. At the backside of the pad are (4) 400 barrel steel tanks within containment.
1743318532 2014-11-05 Casing String Witnessed No Violations Status check inspection on the running of the 9.625 casing as the 1st intermediate casing string, the 12.250 borehole total drilling depth was reached at 8,189 and 8,172 of 40# HCP-110 casing was ran and set in the hole with a float shoe and float collar ran along with a 2 stage DV tool at 5,016. The rig is currently running casing at a depth of 2,200.
2138743083 2017-03-06 Completion Testing No Violations

For data sources see[10]

References