If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 15: | Line 15: | ||
| Operator Name: [[GULFPORT ENERGY CORPORATION]] | | Operator Name: [[GULFPORT ENERGY CORPORATION]] | ||
|- | |- | ||
− | | Well Pad ID: [[000472]] | + | | Well Pad ID: [[US-OH-000472]] |
|- | |- | ||
| Farm/Lease Name: GARY GREEN N WSH MN | | Farm/Lease Name: GARY GREEN N WSH MN | ||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2014-09-26 |
|- | |- | ||
| Spud Date: 2013-12-23 | | Spud Date: 2013-12-23 |
Well ID: 34-111-24429 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.676392461,"lon":-81.18870309,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Washington Township | |
Operator Name: GULFPORT ENERGY CORPORATION | |
Well Pad ID: US-OH-000472 | |
Farm/Lease Name: GARY GREEN N WSH MN | |
License Status: Producing | |
License Date: 2014-09-26 | |
Spud Date: 2013-12-23 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-11-21 | |
Well Total Depth: 15337 ft | |
Configuration: Horizontal | |
Latitude: 39.676392461 | |
Longitude: -81.18870309 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-11-04 | Proposed Formations:UTICA SHALE-POLINT PLEASANT, Issued Date:11/4/2013, Expired Date:11/4/2015 12:00:00 PM, Drilling unit acres:465574, Proposed Well Type:OG, Proposed Well Class:EDPW |
Change of Owner | 2014-09-22 | Operator changed from 8793, HG ENERGY LLC to 9193, AMERICAN ENERGY UTICA LLC |
APP | 2014-09-26 | Proposed Formations:POINT PLEASANT, Issued Date:9/26/2014, Expired Date:9/25/2016 12:00:00 PM, Drilling unit acres:524.579, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-11-21 | |
Change of Owner | 2015-06-19 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION |
Construction Permit Expires | 2016-09-25 | |
Completion Report Received | 2018-01-25 | |
Record Last Modified | 2018-02-07 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-02-06 | 9580 | 9723 | 50 |
2018-02-06 | 14931 | 15080 | 50 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/17/2017 | 03/10/2017 | 9104 | 13,672,700.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Gulfport | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.0068 | 114,099,000.0 |
Other Chemical(s) | Listed Above | See Trade Name(s) List | Propargyl alcohol | 107-19-7 | 5 | 0.00003473 | 45.025 | |
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00003473 | 45.025 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 1.5 | 0.00127398 | 1651.68 | ||||
Cocamide DEA | 68603-42-9 | 5 | 0.00003473 | 45.025 | ||||
2-Ethyl hexanol | 104-76-7 | 10 | 0.00006946 | 90.051 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00127398 | 1651.68 | ||||
Ammonium chloride | 12125-02-9 | 13 | 0.0110411 | 14314.6 | ||||
WATER | 7732-18-5 | 100 | 0.111777 | 144916 | ||||
Methyl alcohol | 67-56-1 | 35 | 0.000243103 | 315.178 | ||||
Alcohols, C10-16, ethoxylated | 68002-97-1 | 1.5 | 0.00127398 | 1651.68 | ||||
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride | 68424-85-1 | 10 | 0.00275166 | 3567.47 | ||||
Tall oil fatty acid | 61790-12-3 | 5 | 0.00003473 | 45.025 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10 | 0.00275166 | 3567.47 | ||||
Ethanol | 64-17-5 | 5 | 0.00137583 | 1783.73 | ||||
SC-30 | X-Chem | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 1.5 | 0.000298144 | 386.537 | |
SFR-470 | X-Chem | Friction Reducer | Alcohols, C12-14, ethoxylated | 68439-50-9 | 1.5 | 0.00127398 | 1651.68 | |
Alcohols, C10-16, ethoxylated | 68002-97-1 | 1.5 | 0.00127398 | 1651.68 | ||||
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0254795 | 33033.7 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00127398 | 1651.68 | ||||
Ammonium chloride | 12125-02-9 | 13 | 0.0110411 | 14314.6 | ||||
100 mesh sand | Muskie | PROPPING AGENT | CRYSTALLINE SILICA | 14808-60-7 | 100 | 1.1974 | 1,552,400.0 | |
NEFE-210 | X-Chem | Acid Non-Emulsifier and Iron Control | Acetic acid | 64-19-7 | 65 | 0.000451478 | 585.331 | |
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00003473 | 45.025 | ||||
Cocamide DEA | 68603-42-9 | 5 | 0.00003473 | 45.025 | ||||
Propargyl alcohol | 107-19-7 | 5 | 0.00003473 | 45.025 | ||||
Methyl alcohol | 67-56-1 | 35 | 0.000243103 | 315.178 | ||||
2-Ethyl hexanol | 104-76-7 | 10 | 0.00006946 | 90.051 | ||||
Tall oil fatty acid | 61790-12-3 | 5 | 0.00003473 | 45.025 | ||||
B-84 | X-Chem | Biocide | Glutaraldehyde | 111-30-8 | 30 | 0.00825499 | 10702.4 | |
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10 | 0.00275166 | 3567.47 | ||||
Ethanol | 64-17-5 | 5 | 0.00137583 | 1783.73 | ||||
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride | 68424-85-1 | 10 | 0.00275166 | 3567.47 | ||||
40/70 white sand | Muskie | PROPPING AGENT | CRYSTALLINE SILICA IN THE FORM OF QUARTZ | 14808-60-7 | 100 | 10.551 | 13,679,200.0 | |
28% HCl Acid | X-Chem | ACID | WATER | 7732-18-5 | 100 | 0.111777 | 144916 | |
HYDROCHLORIC ACID | 7647-01-0 | 32 | 0.0357685 | 46373.1 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-02-17 | H2O | 15 | 10434 Bbl | 514980 | EVOLUTION WELL SERVICE | STAGE 1/1
STAGES 2-30 SEE IMAGES |
2017-03-10 | H2O | 15 | 10099 Bbl | 502030 | EVOLUTION WELL SERVICE | STAGE 31/31
STAGES 2-30 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | GULFPORT ENERGY CORPORATION | 1706463 | 0 | 211 |
2018 | GULFPORT ENERGY CORPORATION | 1072073 | 0 | 363 |
2019 | GULFPORT ENERGY CORPORATION | 172335 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | GULFPORT ENERGY CORPORATION | Brine | 28974 | 211 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 11571 | 363 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 1500 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0706777318 | 2017-03-06 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Evolution Energy Service DC turbine electric powered stimulation pump fleet is on location and has stimulated 19 stages on the 5-H well. Red Dirt rentals completion master valves are in place on each of the 5 wells on location. Nine Energy completion service is on location perforating each stage of the well bores to be stimulated with 5 clusters of 10 shots each cluster. The well completion iron is 15,000 psi rated capacity. All completion equipment is located on secondary polymer containment with the well pad berm serving as the primary containment with the perimeter drain valves in the closed position. |
1168519268 | 2018-03-05 | Production Wells | No Violations | Producing well status check inspection found the well head designed to produce from the tubing well head above the B-Section and casing head section. In the tubing section vertically there is a total of (2) manually operated valves then the tubing flow cross, attached to the tubing flow cross downstream is a third manual valve then a Emergency Shut Down (ESD) valve with remotely controlled switches at multiple locations on location including at the well head and gas processing units along with the production facility and entry point of the location. On location there is a total of (6) active well heads with annular pressure monitoring in place on each well head. The said well has annular pressure gauges in place with the valves in the open position. The annular pressure between the 13.375 casing and 9.625casing reads 0 psi and between the 9.625 casing and the 5.5 casing 800 psi. Addressing the well support equipment on location- at the entry point of the location is a midstream operation operated by EQT Company, on the left hand side of the well pad is a total of (6) gas processing units one each for every active well on the pad. At the left rear corner of the well pad is the production facility consisting of a total of (4) steel construction tanks each with a total fluid volume of 400 barrels capacity, the tanks are situated inside a polymer lined steel containment dike area. The well pad does have a perimeter earthen berm. Proper well identification is posted at the each well and the tank battery as well as the entry point of the lease road and well pad. |
1296895184 | 2017-06-27 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is in good repair and graveled from County Road 12 to the well pad. There is a midstream distribution sales point located on the South East side of the well pad near the well pad entry point, Rice Energy is the Mid Stream operator and there is a glycol dehydration unit present on the mid stream site. Situated on the well pad is a total of( 6) wells all now in production with production trees in place and the well head production valves in the open position. The wells are all equipped with annular monitoring pressure gauges. The wells are selling into gas processing units with a total of (6 )gas processing units on location one for each well. Also present on the West side of the well pad is the production fluid storage area consisting of a total of (4) steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. The pumper is on site and has indicted they are shipping 2,100 barrels of production flow back fluid per every 24 hours. Identification is posted at each well and at the end of the lease road. Safety shut down points are at each well along with at the production facility and well pad entry point. |
1387825320 | 2013-12-23 | Casing String Witnessed | No Violations | The said well was spudded on this day with 100 of 20 conductor set by the top hole rig. |
1399572972 | 2014-05-08 | Drill / Deepen / Reopen | No Violations | Status check inspection found Decker Drilling rig # 10 on location drilling the 17.5 surface borehole at a current depth of 438. |
1399863928 | 2014-05-09 | Casing String Witnessed | No Violations | 05/09/2014 Decker drilling rig # 10 has drilled the 17.5 surface bore to a depth of 1085 with 1079 of 13.375 54.5# casing ran with a float shoe and float collar ran along with proper centralizer placement demonstrated and the casing pressure tested to 500 psi over lift pressure upon the landing of the plug with good cement returns to surface. |
1489166873 | 2017-03-10 | Completion Testing | No Violations | Status check inspection on the well completion process found Evolution Energy Service DC Electric powered pressure pumping service on location pumping the 31th and final stage to be stimulated. The stage will be stimulated with a total mix of approximately 10,500 barrels of product consisting of approximately 500,000 pounds of sand. Nine Energy Wireline is on location and has perforated the stage between the depths of 9,580 and 9,723 with a total of 50 perforations shot in 5 clusters utilizing 90 degree phasing. The well head annular pressures are being monitored electronically. |
1681457862 | 2018-03-05 | Production Wells | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The lease road is gated and an EQT midstream production facility is situated on the righthand side, prior to the well pad. There is an emergency shutdown button on the left, at the entrance. The well is equipped with annular pressure monitoring and an emergency shutdown button is located at the wellhead. There are (6) gas processing units on the left of the pad, and all are equipped with an emergency shutdown button. At the backside of the pad are (4) 400 barrel steel tanks within containment. |
1743318532 | 2014-11-05 | Casing String Witnessed | No Violations | Status check inspection on the running of the 9.625 casing as the 1st intermediate casing string, the 12.250 borehole total drilling depth was reached at 8,189 and 8,172 of 40# HCP-110 casing was ran and set in the hole with a float shoe and float collar ran along with a 2 stage DV tool at 5,016. The rig is currently running casing at a depth of 2,200. |
2138743083 | 2017-03-06 | Completion Testing | No Violations |
For data sources see[10]