X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-121-24349"

m
m
Line 15: Line 15:
 
| Operator Name: [[ANADARKO E & P ONSHORE LLC]]
 
| Operator Name: [[ANADARKO E & P ONSHORE LLC]]
 
|-
 
|-
| Well Pad ID: [[000481]]
+
| Well Pad ID: [[US-OH-000481]]
 
|-
 
|-
 
| Farm/Lease Name: FREC NOBL OLIVE
 
| Farm/Lease Name: FREC NOBL OLIVE
Line 21: Line 21:
 
| License Status: Plugged Back
 
| License Status: Plugged Back
 
|-
 
|-
| License Date: 2017-02-27
+
| License Date: 2011-10-31
 
|-
 
|-
 
| Spud Date: 2012-03-31
 
| Spud Date: 2012-03-31

Revision as of 08:22, 26 July 2019

Well Details

Well ID: 34-121-24349
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Olive Township
Operator Name: ANADARKO E & P ONSHORE LLC
Well Pad ID: US-OH-000481
Farm/Lease Name: FREC NOBL OLIVE
License Status: Plugged Back
License Date: 2011-10-31
Spud Date: 2012-03-31
Spud Drilling Contractor: KEY ENERGY
Final Drill Date: 2012-06-11
Well Total Depth: 12079 ft
Configuration: Vertical
Latitude: 39.664623272
Longitude: -81.53762177

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-10-31 Proposed Formations:TRENTON/BLACK RIVER, Issued Date:10/31/2011, Expired Date:10/30/2013 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Correction to Well 2012-03-23 CORRECTION TO LEASE NAME, PROPOSED TOTAL DEPTH, PROPOSED GEOLOGICAL FORMATION AND CASING PROGRAM. NEW SAMPLE LETTER ISSUED.
Correction to Well 2012-06-01 CORRECTION TO PROPOSED TOTAL DEPTH.
Plugged Back 2012-06-09
Reached Total Depth 2012-06-11
Completion Report Received 2012-11-14
Construction Permit Expires 2013-10-30
Record Last Modified 2017-02-27

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-01-08 9172 8963 40
2013-01-08 8935 8726 40
2013-01-08 9646 9437 40
2013-01-08 9409 9200 40
2013-01-08 8695 8489 40
2013-01-08 7979 7778 40
2013-01-08 7749 7537 40
2013-01-08 8461 8259 40
2013-01-08 8224 8015 40
2013-01-08 9883 9674 40
2013-01-08 11543 11333 40
2013-01-08 11305 11096 40
2013-01-08 12021 11807 40
2013-01-08 11784 11570 40
2013-01-08 11068 10864 40
2013-01-08 10350 10148 40
2013-01-08 10117 9911 40
2013-01-08 10831 10622 40
2013-01-08 10594 10385 40

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/29/2012 08/29/2012 7290.00

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 AI-7NR Trican Well Service Corrosion Inhibitor Propargyl alcohol 107-19-7 1.00 0.00002000
BioClear 5000 Trican Well Service Biocide Polyethylene glycol 25322-68-3 70.00 0.02
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 10.00 0.00392000
Biobrom C-100G Trican Well Service Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 98.00 0.00
TXP-8 Trican Well Service Friction Reducer Cationic water-soluble polymer emulsion 100.00 0.05
CS-1 Trican Well Service Clay Stabilizer Blend 25.00 0.05
1,2-Propylene glycol 57-55-6 20.00 0.04
Inorganic salts 30.00 0.06
Surfactant 5.00 0.01
Sand (Proppant) Trican Well Service Proppant Methenamine 100-97-0 1.00 0.08
Quartz 14808-60-7 70.00 6.23
GBO-1 Trican Well Service Gel Breaker Sodium perborate tetrahydrate 10486-00-7 100.00 0.00
WG-111L Trican Well Service Viscosifier/Gelant Distillates, petroleum, hydrotreated light 64742-47-8 60.00 0.00
Polysaccharide blend 60.00 0.00
WG-111D Trican Well Service Water Gellant Guar gum 9000-30-0 100.00 0.00
BXL-A Trican Well Service Gel Breaker Proprietary 70.00 0.00
FEAC-20 Trican Well Service Iron Control Acetic acid 64-19-7 50.00 0.00185000
Citric acid 77-92-9 30.00 0.00111000
Acid, Hydrochloric (3.5) Trican Well Service General Acidizing
Water Anadarko Carrier/Base Fluid Water 7732-18-5 100.00 90.34
DF-1 Trican Well Service Defoaming Agent Non-hazardous materials only in the product 100.00 0.00
Acid, Hydrochloric (7.5) Trican Well Service General Acidizing
FR-8 Trican Well Service Friction Reducer Ammonium chloride 12125-02-9 1.50 0.00
Distillates, petroleum, hydrotreated light 64742-47-8 28.00 0.00
Acid, Hydrochloric (7.5) General Acidizing Hydrochloric acid 7647-01-0 7.50 0.03
Water 7732-18-5 92.50 0.37
Sand (Proppant) Proppant
FR-14 Trican Well Service Friction Reducer Acetic acid 64-19-7 5.00 0.00
Inorganic salt 30.00 0.00
WXB-10 Trican Well Service Fracturing Crosslinker Ulexite 1319-33-1 60.00 0.00
Distillates, petroleum, hydrotreated light 64742-47-8 60.00 0.00
WBO-2 Trican Well Service Gel Breaker Sodium persulfate 7775-27-1 100.00 0.00
TXP-10 Trican Well Service Scale Inhibitor Water 7732-18-5 70.00 0.01
Acrylate phosphonate copolymer 40.00 0.01
1,2-Propylene glycol 57-55-6 10.00 0.00257000
Neutralized organic acid 20.00 0.00514000
Spectrachem tracer Diagnostics Sodium Salt 10.00 0.00007000
TXP-11 Trican Well Service Clay Stabilizer Chloride 16887-00-6 30.00 0.00
Water 7732-18-5 60.00 0.00
Poly electrolyte 40.00 0.00
Inorganic chemical 20.00 0.00
Acid, Hydrochloric (3.5) General Acidizing Hydrochloric acid 7647-01-0 15.00 0.00
Water 7732-18-5 85.00 0.00
Spectrachem tracer ProTechnics Diagnostics Water 7732-18-5 91.00 0.00062000
WBE-6 Trican Well Service Gel Breaker No hazardous ingredients 100.00 0.00

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 ANADARKO E & P ONSHORE LLC Brine 4812 35
2013 ANADARKO E & P ONSHORE LLC Brine 0 0
2014 ARTEX OIL COMPANY Brine 0 0
2015 ARTEX OIL COMPANY Brine 10756 184
2016 ARTEX OIL COMPANY Brine 6103 366
2017 ARTEX OIL COMPANY Brine 1997 325
2018 ARTEX OIL COMPANY Brine 0 365
2019 ARTEX OIL COMPANY Brine 0 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0029439878 2013-10-29 Preliminary Restoration No Violations My inspection today finds the well is shut in. The preliminary restoration requirements have been met.
0066795773 2012-05-25 Drill / Deepen / Reopen No Violations Stopped by drill site for update they were tripping bit@8238 they stated that they should be back to drilling by this evening.
0079668743 2012-06-04 Drill / Deepen / Reopen No Violations Drilling@10,544 should be at total depth by early morning.
0105367093 2012-05-30 Drill / Deepen / Reopen No Violations Stopped by drill rig for up date they were tripping bit@10,277 they hope to have vertical section of well done later this week and possibly be ready to plug back well this weekend.
0648496664 2017-05-02 Work Over Reconditioning No Violations On 4/4/17 a bridge plug was prematurely set at 7578 feet. Artex made several attempts to remove the plug but could not do so. To ensure that the plug was still sufficient in stopping gas and fluid flow Artex placed a composite plug directly on top of the cast iron bridge plug at 7578 feet. The well will be produced from 7578 feet for the time being. Artex will discuss future plans on drilling the plugs out.
0828010770 2018-02-23 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with a plunger lift system with production valves in the open position. The production equipment consisted of four 400 barrel tanks, a vapor recovery tower, a high low separator, one compressor, and one combustor. Identification was posted at the pad entry.
1088905824 2016-05-31 Production Wells No Violations My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery is comprised of four 400 barrel tanks set inside of an earthen dike. A horizontal separator is set 125 from the tank battery. An orifice meter is equipped with a current chart.
1319895657 2017-04-04 Work Over Reconditioning No Violations Peak completions, Bishop Well Service, Kilbarger, Formation Cementing, and Artex are all on location to attempt to set a bridge plug. On 4/3/17 while attempting to set the plug at 8850 feet the plug prematurely set at 7578 feet and the plug would not move. During my inspection I witnessed Formation Cementing nipple up to the tubing and pressured up on the hydraulic setting tool to fully set the plug and release the hydraulic setting tool so the tubing could be tripped back out of the hole. Bishop well service tripped the 2.875 inch diameter tubing out of hole. The setting tool came to surface with the mandrel of the plug still attached indicating that there is a hole in the middle of the plug that was set at 7578 feet within the 5.5 inch diameter production casing. Bishop well service will trip back in to clean the hole and repeat the process.
1415134602 2017-04-06 Work Over Reconditioning No Violations Bishop Well Service, Kilbarger, and Artex are all on location to attempt to set a bridge plug. During my inspection I witnessed bishop well service tripping 2.875 inch diameter tubing in hole. The tubing was assembled with a concave bottom junk mill bit that will assist in pushing the failed bridge plug remains from 4/3/17 and any other debris within the 5.5 inch diameter production casing out passed 9000 feet so a new bridge plug can be set at the desired depth.
1436998003 2013-10-29 Preliminary Restoration No Violations My inspection today finds the well is shut in. The preliminary restoration requirements have been met.
1490108445 2017-03-21 Work Over Reconditioning No Violations On location to witness Bishop Well Service along with Peak Completions release the packer on the 2.875 inch diameter tubing and remove the tubing from hole. Bishop attempted to release the packer and began to remove the tubing from hole. The packer was still hanging up on the first 12 joints. The packer became free and the tubing was free to be removed from hole. I witnessed the first 31 joints being removed.
1490230413 2017-03-22 Work Over Reconditioning No Violations
1490622642 2017-03-27 Work Over Reconditioning No Violations During my inspection I witnessed Kilbarger moving in their Air Package onto location to assists in setting a bridge plug to satisfy unit boundary requirements.
1490892145 2017-03-30 Work Over Reconditioning No Violations
1491318024 2017-04-03 Work Over Reconditioning No Violations Peak Completions, Bishop Well Service, Kilbarger, Formation Cementing, and Artex are all on location to attempt to set a cast iron bridge plug at a measured depth of 8850 feet in depth within the 5.5 inch diameter production casing. During my inspection I witnessed Bishop Well Service pulling the 2.875 inch diameter tubing from hole. Peak Completions assembled the hydraulic setting tool and the bridge plug on to the 2.875 inch diameter tubing and the tubing was tripped back into the 5.5 inch diameter production casing. The plug set prematurely at 7578 feet. Bishop Well Service made an exhausted attempt to push the plug further down hole. The plug would not move. Operations will continue tomorrow 4/4/17.
1563375881 2017-03-20 Work Over Reconditioning No Violations On location today to meet with Artex Oil Company to discuss setting a bridge plug for purposes of eliminating a unit boundary overlap on an additional horizontal well that Artex plans to drill. During my inspection Bishop Well Service rig was rigging up. Cactus Wellhead nippled down the wellhead and nippled up their blow out preventer dressed for 2.875 inch diameter tubing. The well consisted of 2.875 inch diameter tubing set on a packer at 6519 feet.
1863230100 2012-04-05 Drill / Deepen / Reopen No Violations Spud date 3/31/12 Ziegenfuss set 156 of 24 casing and drilled pilot hole for 16 casing too be set with drill rig when it arrives on site there is 517 of 19 hole owner will set approximately 515 of 16 when drill rig shows up on site.
1917367438 2017-03-23 Work Over Reconditioning No Violations The purpose of my inspection was to check in on the process of setting a bridge plug to satisfy unit boundary requirements. Wise Coil Tubing is on location along with Artex. Wise attempted to trip in hole to tag total depth and then set a bridge plug. They were unsuccessful in doing so. Prior to my arrival the coil tubing made it to 11,100 feet in the lateral and got hung up and could not go any further. During my inspection Wise Coil Tubing was rigging down to move off of location. Artex plans to bring a service rig on location to clean out the well to make it possible to get out in the lateral far enough to set a bridge plug at 11,206 feet.

For data sources see[7]

References