If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Replugged Well | | License Status: Replugged Well | ||
|- | |- | ||
− | | License Date: 1998- | + | | License Date: 1998-05-01 |
|- | |- | ||
| Spud Date: 1983-01-25 | | Spud Date: 1983-01-25 |
Well ID: 34-153-21032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.081968554,"lon":-81.68049281,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Copley Township | |
Operator Name: HARRISON ENERGY | |
Well Pad ID: | |
Farm/Lease Name: DAYS HOMER | |
License Status: Replugged Well | |
License Date: 1998-05-01 | |
Spud Date: 1983-01-25 | |
Spud Drilling Contractor: MILLER DRILLING | |
Final Drill Date: 1983-01-31 | |
Well Total Depth: 3744 ft | |
Configuration: Vertical | |
Latitude: 41.081968554 | |
Longitude: -81.68049281 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1982-08-05 | 646 COASTAL PETROLEUM CORP GeoDate 8/5/82 |
Oil and Gas | 1982-08-05 | Issued Date 8/5/82 Expired Date 2/1/83 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03710 Proposed Drill Depth 03710 |
Original Spud | 1983-01-25 | R.I. CHG IN OW. 8-7-82 |
Completed | 1983-01-31 | R.I. CHG IN OW. 8-7-82 |
Reached Total Depth | 1983-01-31 | R.I. CHG IN OW. 8-7-82 |
Completion Report Received | 1983-02-14 | R.I. CHG IN OW. 8-7-82 |
CO | 1992-11-06 | 2348 TRIAD RESOURCES INC GeoDate 8/5/82 |
CO | 1996-04-04 | 1217 HARRISON ENERGY GeoDate 8/5/82 |
APP | 1998-05-01 | Proposed Formations:CLINTON, Issued Date:5/1/98, Expired Date:5/1/99 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 1998-09-22 | R.I. CHG IN OW. 8-7-82 |
Construction Permit Expires | 1999-05-01 | R.I. CHG IN OW. 8-7-82 |
Record Last Modified | 2017-02-15 | R.I. CHG IN OW. 8-7-82 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3543 | 3642 | 0 |
2006-09-11 | 3561 | 3640 | 34 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 0 | 0 | FRAC;N2 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | TRIAD RESOURCES INC | 545 | 67 | 365 |
1992 | TRIAD RESOURCES INC | 284 | 67 | 365 |
1996 | HARRISON ENERGY | 102 | 0 | 60 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | TRIAD RESOURCES INC | Brine | 0 | 365 |
1992 | TRIAD RESOURCES INC | Brine | 0 | 365 |
1996 | HARRISON ENERGY | Brine | 0 | 60 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL4828 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point |
For data sources see[9]