X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-123-46152"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-123-46152
 
| Well ID: 37-123-46152
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.9132, -79.333758 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.9132, -79.333758 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/29/2011
+
| Spud Date: 2011-08-29
 
|-
 
|-
| Permit Date: 12/9/2010
+
| Permit Date: 2010-12-09
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 19.11
 
| style="text-align: right;" | 19.11
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 90: Line 115:
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 14.46
 
| style="text-align: right;" | 14.46
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 14.76
 
| style="text-align: right;" | 14.76
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 31
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 16.53
 
| style="text-align: right;" | 16.53
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 138: Line 163:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 32.78 Bbl
 
| style="text-align: right;" | 32.78 Bbl
Line 144: Line 169:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 91.67 Bbl
 
| style="text-align: right;" | 91.67 Bbl
Line 150: Line 175:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 208.89 Bbl
 
| style="text-align: right;" | 208.89 Bbl
Line 156: Line 181:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 56.78 Bbl
 
| style="text-align: right;" | 56.78 Bbl
Line 162: Line 187:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2016-0
+
| 2016-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 12.50 Bbl
 
| style="text-align: right;" | 12.50 Bbl
Line 168: Line 193:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 28.57 Bbl
 
| style="text-align: right;" | 28.57 Bbl
Line 174: Line 199:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 78.84 Bbl
 
| style="text-align: right;" | 78.84 Bbl
Line 180: Line 205:
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 12.17 Bbl
 
| style="text-align: right;" | 12.17 Bbl
Line 205: Line 230:
 
| 2028755
 
| 2028755
 
| Primary Facility
 
| Primary Facility
| 12/16/2011
+
| 2011-12-16
 
| Administrative/File Review
 
| Administrative/File Review
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 212: Line 237:
 
| 2037705
 
| 2037705
 
| Primary Facility
 
| Primary Facility
| 01/10/2012
+
| 2012-01-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 231: Line 256:
 
| 627582
 
| 627582
 
| 12/16/2011
 
| 12/16/2011
| 12/20/2011
+
| 2011-12-16
 
| 212WELLRCD - Failure to submit well record within 30 days of completion of drilling
 
| 212WELLRCD - Failure to submit well record within 30 days of completion of drilling
 
| Administrative
 
| Administrative
Line 239: Line 264:
 
| 627583
 
| 627583
 
| 12/16/2011
 
| 12/16/2011
| 12/20/2011
+
| 2011-12-16
 
| 212CMPLRPT - Failure to submit completion report within 30 days of completion of well
 
| 212CMPLRPT - Failure to submit completion report within 30 days of completion of well
 
| Administrative
 
| Administrative
Line 261: Line 286:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/20/2011
+
| 2011-12-20
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 270: Line 295:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 12/20/2011
+
| 2011-12-20
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 281: Line 306:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 12:09, 26 July 2019

Well Details

Well ID: 37-123-46152
Loading map...
Country: United States
State: Pennsylvania
County: Warren
Municipality: Sugar Grove Township
Operator Name: ALLSHOUSE TERRENCE L JR
Well Pad ID:
Farm/Lease Name: CARLSON LEASE 1860
License Status: Active
Spud Date: 2011-08-29
Permit Date: 2010-12-09
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.9132
Longitude: -79.333758

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 0.00 0 0.00 0 0.00 0
2011 CATALYST ENERGY INC 0.00 0 19.11 30 0.00 0
2012 CATALYST ENERGY INC 211.11 366 84.56 366 208.89 366
2014 CATALYST ENERGY INC 0.00 0 14.46 365 0.00 0
2015 0.00 0 0.00 0 0.00 0
2016 CATALYST ENERGY INC 0.00 0 14.76 31 0.00 0
2017 CATALYST ENERGY INC 0.00 0 16.53 365 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-A00 Drilling Fluid Waste (in Barrels) 32.78 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011-A00 Produced Fluid (in Barrels) 91.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012-A00 Produced Fluid (in Barrels) 208.89 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014-A00 Produced Fluid (in Barrels) 56.78 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016-A00 Produced Fluid (in Barrels) RWC 802 12.50 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2017-A00 Produced Fluid (in Barrels) RWC 802 28.57 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2017-A00 Produced Fluid (in Barrels) RWC 802 78.84 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2017-A00 Produced Fluid (in Barrels) RWC 802 12.17 Bbl ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2028755 Primary Facility 2011-12-16 Administrative/File Review Violation(s) Noted
2037705 Primary Facility 2012-01-10 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2028755 627582 12/16/2011 2011-12-16 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative
2028755 627583 12/16/2011 2011-12-16 212CMPLRPT - Failure to submit completion report within 30 days of completion of well Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
627582 278571 NOV - Notice of Violation Comply/Closed 2011-12-20
627583 278571 NOV - Notice of Violation Comply/Closed 2011-12-20

For data sources see[6]

References